Baltimore City · 21217
2319 CALLOW AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $412,433
- Land use
- Residential (R)
- Year built
- 1900
- Last sale
- Apr 12, 2021
Assessment
| Owner | HARVEY, BRIANNA |
|---|---|
| Land use | Residential (R) |
| Total assessment | $412,433 (cycle 2026) |
| Last sale | Apr 12, 2021 — $425,000 |
| Year built | 1900 |
| Zoning | R-8 |
| Vacant | — |
Permits
11| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2020 | USE PREMISES FOR A SINGLE FAMILY DWELLING (ROWHOUSE). | — | Oct 8, 2020 |
| COM2020 | AMEND PERMIT: CHANGE PRIME CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-01154:SCOPE OF WORK: --INTERIOR ALTERATIONS-- TO DEMOLISH AND REMOVE EXISTING FRAMING WALLS, BUILDING OF NEW WALLS, DOORS, WINDOWS, FLOOR AND—EXTERIOR ALTERATIONS—BUILD REAR DECK AND ROOF FRAMING WORK. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, HVAC, PLUMBING AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2019-01154) SCOPE OF WORK: --INTERIOR ALTERATIONS-- TO DEMOLISH AND REMOVE EXISTING FRAMING WALLS, BUILDING OF NEW WALLS, DOORS, WINDOWS, FLOOR AND—EXTERIOR ALTERATIONS—BUILD REAR DECK AND ROOF FRAMING WORK. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, HVAC, PLUMBING AS PER PLANS AS PER CODE. | — | Aug 28, 2020 |
| COM2020 | AMEND PERMIT: CHANGE PLUMBER, GAS, ELECTRICAL, AND HVAC CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-67797:INSTALL (30) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (3) # LOW VOLTAGE, (2) 30000 BTU AIR-CON SYSTEM, CONDENSOR, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (4) 40 CFM EXHAUST SYSTEMS , (20) # PLUMBING FIXTURES, (2) 50000 BTU FUEL-BURNING EQUIP, (2) BTU GAS PIPEING, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (2) 40000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2019-67797) INSTALL (30) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (3) # LOW VOLTAGE, (2) 30000 BTU AIR-CON SYSTEM, CONDENSOR, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (4) 40 CFM EXHAUST SYSTEMS , (20) # PLUMBING FIXTURES, (2) 50000 BTU FUEL-BURNING EQUIP, (2) BTU GAS PIPEING, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (2) 40000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Jun 23, 2020 |
| COM2020 | Extend Original Permit.(original permit:COM2019-01154:SCOPE OF WORK:--INTERIOR ALTERATIONS--INTERIOR WORK INCLUDES NEW WALLS, DOORS, WINDOWS, FLOOR AND ROOF FRAMING. SEPARATE PERMIT REQUIRED FOR ELECTRIC, PLUMBING, HVAC AND GAS WORK. AS PER PLANS AND AS PER CODE) Original Permit Description:(COM2019-01154) SCOPE OF WORK:--INTERIOR ALTERATIONS--INTERIOR WORK INCLUDES NEW WALLS, DOORS, WINDOWS, FLOOR AND ROOF FRAMING. SEPARATE PERMIT REQUIRED FOR ELECTRIC, PLUMBING, HVAC AND GAS WORK. AS PER PLANS AND AS PER CODE | — | Apr 30, 2020 |
| COM2020 | AMEND PERMIT: CHANGE PLUMBER AND GAS CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-67797:INSTALL (30) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (3) # LOW VOLTAGE, (2) 30000 BTU AIR-CON SYSTEM, CONDENSOR, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (4) 40 CFM EXHAUST SYSTEMS , (20) # PLUMBING FIXTURES, (2) 50000 BTU FUEL-BURNING EQUIP, (2) BTU GAS PIPEING, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (2) 40000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2019-67797) INSTALL (30) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (3) # LOW VOLTAGE, (2) 30000 BTU AIR-CON SYSTEM, CONDENSOR, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (4) 40 CFM EXHAUST SYSTEMS , (20) # PLUMBING FIXTURES, (2) 50000 BTU FUEL-BURNING EQUIP, (2) BTU GAS PIPEING, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (2) 40000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Jan 27, 2020 |
| COM2020 | AMEND PERMIT: CHANGE ELECTRICAL CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-67797:INSTALL (30) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (3) # LOW VOLTAGE, (2) 30000 BTU AIR-CON SYSTEM, CONDENSOR, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (4) 40 CFM EXHAUST SYSTEMS , (20) # PLUMBING FIXTURES, (2) 50000 BTU FUEL-BURNING EQUIP, (2) BTU GAS PIPEING, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (2) 40000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2019-67797) INSTALL (30) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (3) # LOW VOLTAGE, (2) 30000 BTU AIR-CON SYSTEM, CONDENSOR, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (4) 40 CFM EXHAUST SYSTEMS , (20) # PLUMBING FIXTURES, (2) 50000 BTU FUEL-BURNING EQUIP, (2) BTU GAS PIPEING, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (2) 40000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Jan 27, 2020 |
| COM2020 | AMEND PERMIT: CHANGE HVAC CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-67797:INSTALL (30) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (3) # LOW VOLTAGE, (2) 30000 BTU AIR-CON SYSTEM, CONDENSOR, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (4) 40 CFM EXHAUST SYSTEMS , (20) # PLUMBING FIXTURES, (2) 50000 BTU FUEL-BURNING EQUIP, (2) BTU GAS PIPEING, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (2) 40000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2019-67797) INSTALL (30) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (3) # LOW VOLTAGE, (2) 30000 BTU AIR-CON SYSTEM, CONDENSOR, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (4) 40 CFM EXHAUST SYSTEMS , (20) # PLUMBING FIXTURES, (2) 50000 BTU FUEL-BURNING EQUIP, (2) BTU GAS PIPEING, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (2) 40000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Jan 27, 2020 |
| COM2019 | install (30) # branch circuits/feeders , (1) 200 amps electric service up to 600v (#amps), (3) # low voltage, (2) 30000 btu air-con system, condensor, (2) # new distribution system (1-2 family), (2) 72000 btu fuel-burning equip(furnace), (4) 40 cfm exhaust systems , (20) # plumbing fixtures, (2) 50000 btu fuel-burning equip, (2) btu gas pipeing, (1) # sanitary connection (reconstruction0, (1) # water service pipe (reconstruction), (2) 40000 btu fuel-burning equip as per code. | $12,500 | Jul 12, 2019 |
| COM2019 | scope of work: --interior alterations-- to demolish and remove existing framing walls, building of new walls, doors, windows, floor and—exterior alterations—build rear deck and roof framing work. separate permit required for electrical, hvac, plumbing as per plans as per code. | $10,000 | Apr 25, 2019 |
| COM2019 | scope of work: exterior alterations: demo the back of the house, specifically remove rear walls; remove all debris and trash from the premises as per code. grade the back of the house. (this house was condemned.) wall is to be 4' above basement level. this permit is for removal only, separate permit will be filed to rebuild. all work will be done according to baltimore city code. | $500 | Mar 12, 2019 |
| COM2019 | install (1) # sanitary connection (1-2 fam. res.), (1) # water service pipe ( 1-2 fam. res.) as per code. | $4,000 | Feb 1, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BUSEJul 7, 2026 · 111 m · 813 WHITELOCK ST
- violation: HCD-Sanitation PropertyJul 7, 2026 · 140 m · 2407 LAKEVIEW AVE
- permit: BCCMJul 7, 2026 · 141 m · 2427 CALLOW AVE
- violation: HCD-Sanitation PropertyJul 5, 2026 · 97 m · 2132 PARK AVE
- violation: HCD-Sanitation PropertyJul 5, 2026 · 98 m · 2130 PARK AVE
- violation: SW-Dirty AlleyJul 4, 2026 · 96 m · 807 WHITELOCK ST
- violation: SW-Dirty AlleyJul 4, 2026 · 107 m · 811 WHITELOCK ST
- violation: HCD-Sanitation PropertyJul 3, 2026 · 18 m · 2325 CALLOW AVE
- violation: HCD-Sanitation PropertyJul 3, 2026 · 67 m
- violation: SW-Dirty AlleyJul 3, 2026 · 76 m · 716 NEWINGTON AVE
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.