Baltimore City · 21211

1311 COX ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$239,033
Land use
Industrial (I)
Year built
1980
Last sale
Feb 25, 2008

Assessment

OwnerSKEENER LLC
Land useIndustrial (I)
Total assessment$239,033 (cycle 2026)
Last saleFeb 25, 2008 — $150,000
Year built1980
ZoningI-1
Vacant

Permits

4
TypeDescriptionCostIssued
BCCMChange of Scope – Scope Clarification Only. Permit BCCM-25-003130 covers Phase 1 interior fitout work served by the existing 200A electrical service. The BGE 120/208V 3-phase 600A service upgrade and all Phase 1A mechanical/electrical work are Not In Contract (NIC) and will be permitted separately as Phase 1A. The note on Sheet E.7.1 about BGE service upgrade is a future reference only and is not required for completion of this permit. All Phase 1 rough-ins have passed; we request approval of this clarification and renewal of BCCM-25-003130 so Phase 1 finals can be scheduled, with expedited review per prior discussion with DHCD.$25,000Jun 4, 2026
BCCMInterior low voltage installation. CCTV cameras, access control, and alarm system. AS PER CODE. Per Building Permit BCCM-25-003130.$0Apr 24, 2026
BCCM****** Change to Original Scope Revision to active permit BCCM-25-003130. - Architectural changes for Phase 1 interior fit-out to align with State sanitation protocols.****** SCOPE OF WORK: ------ INTERIOR ALTERATIONS --------- - Scope includes updates to wall framing stability , ceiling sanitation upgrades, and finish updates (VCT/Epoxy/Paint). AS PER PLANS AND AS PER CODE. ****** No change to Use, Occupancy, or Energy Compliance.*******$175,000Mar 3, 2026
BCCM******* These revisions incorporate the following updates: Code & compliance alignment: Architectural, Mechanical, Electrical, and Plumbing sheets updated to conform to 2021 IBC/IEBC/IMC/IPC and Baltimore City amendments, while maintaining IGCC and accessibility compliance. The intent of this revision is to expedite Phase 1 permit approval and meeting MCA due Dates while reserving the higher-load equipment and new electrical service upgrade (future 120/208 V, 3-phase, 600 A) for a subsequent Phase 1A submission. - Security & life-safety: No change to previously described UL-listed alarm/camera system; fire protection deferred per low-hazard F-1 use in Phase 1. project is a non-retail cannabis processing facility. Planned operations include light manufacturing, formulation, secure storage and packing of cannabis products. ********* SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS ---------- - Demolition work shall include removal of existing interior partitions, soffits, ceilings, lights, fixtures, finishes, existing mechanical, electrical and plumbing equipment. - Construction of interior non load bearing partitions, ceilings, lights, fixtures, finishes, MEP equipment. --------- TRADES --------- - Phase 1 scope refinement: Drawings simplified and limited to HVAC, lighting, and general power served by the existing 200 A service. - Kitchen update: Reduced commercial kitchen design (beverage-only zone, no hood or grease equipment), with future Phase 1A and kitchen expansion clearly shown as “NIC – Not in Contract.” - reserving the higher-load equipment and new electrical service upgrade (future 120/208 V, 3-phase, 600 A) for a subsequent Phase 1A submission. AS PER PLANS AND AS PER CODE. ***** PER BA-SCO-25-1364 *******$175,000Nov 26, 2025

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.