Baltimore City · 21217
1511 PARK AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $620,500
- Land use
- Residential (R)
- Year built
- 1880
- Last sale
- May 21, 2018
Assessment
| Owner | ESCHBACHER, EDWARD GRAHAM |
|---|---|
| Land use | Residential (R) |
| Total assessment | $620,500 (cycle 2026) |
| Last sale | May 21, 2018 — $493,000 |
| Year built | 1880 |
| Zoning | R-7 |
| Vacant | — |
Permits
10| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2023 | REINSTATEMENT: (ORIGINAL PERMIT:COM2022-86109:SCOPE OF WORK: INTERIOR / EXTERIOR ALTERATIONS TO INCLUDE: FRAMING TO CREATE NEW PARTITION WALLS, INSTALL NEW DRYWALL, INSTALL NEW INTERIOR DOORS, INSTALL NEW FINISHES, RECONSTRUCTION OF A PORTION OF THE FLOOR JOISTS SYSTEM, RECONSTRUCTION OF ORIEL AND PORTION OF WALL, REPLACEMENT OF WINDOWS (IN THE SAME SIZE AND LOCATION), KITCHEN & 2ND FLOOR BATHROOM RENOVATION AS PER PLANS. ELECTRICAL, PLUMBING, HVAC ALTERATIONS (PERMITS TO BE PULLED SEPARATELY BY SUBCONTRACTORS). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. ********* AS PER CHAP: ''ON FAÇADE, REMOVE FOUR HISTORIC 1/1 WINDOWS THAT ARE LEAD-BASED PAINT HAZARDS FROM THE SECOND AND THIRD FLOORS, DEMOING TO THE BRICK OPENING. INSTALL FULL REPLACEMENT MARVIN ULTIMATE MAGNUM 1/1 WINDOWS WITH OGEE LUGS ON TOP SASHES, AND BALTIMORE BULLNOSE BRICKMOLD, PAINTED PETROL BLUE. WINDOWS WILL PROPERLY FIT THE WINDOW OPENINGS. DEMOLISH STRUCTURALLY-UNSOUND 2-STORY REAR ORIEL BAY AND RECONSTRUCT TO MATCH EXISTING IN DIMENSIONS AND PROPORTIONS, WITH THE SIX WINDOWS TO MATCH THE EXISTING IN SIZE ON THE SECOND FLOOR; THE WINDOWS ON THE FIRST FLOOR WILL BE SHORTENED TO ACCOMMODATE INTERIOR CHANGES. THE CORNICE WILL BE REPLICATED TO MATCH EXISTING. CORNICES WILL BE PAINTED BLACK; BODY OF ORIEL AND WINDOWS WILL BE PAINTED PETROL BLUE. SIDING WILL BE SMOOTH HARDIE-PANEL; CORNICE WILL BE WOOD OR AZEK. ORIEL ROOF WILL BE STANDING SEAM METAL. WINDOWS WILL BE 2/2 JELD-WEN SITELINE WOOD WINDOWS. REMOVE A WINDOW AND INSTALL A NEW DOOR WITH TRANSOM ON REAR FIRST FLOOR ELEVATION; DOOR WILL BE WOOD FULL LIGHT JELD WEN, AND TRANSOM WILL BE FIXED SINGLE LIGHT. CONSTRUCT APPROX. 15’ X 15’ DECK AND STAIRS ON FIRST FLOOR REAR, DECKING WILL BE PRESSURE TREATED WOOD OR TROPICAL HARDWOOD, RAILING WILL BE BLACK STEEL WITH WOOD HANDRAIL. ALL WORK TO BE COMPLETED AS PER PLANS/SPECS IN CHAP FILES.'' ) Original Permit Description:(COM2022-86109) SCOPE OF WORK: INTERIOR / EXTERIOR ALTERATIONS TO INCLUDE: FRAMING TO CREATE NEW PARTITION WALLS, INSTALL NEW DRYWALL, INSTALL NEW INTERIOR DOORS, INSTALL NEW FINISHES, RECONSTRUCTION OF A PORTION OF THE FLOOR JOISTS SYSTEM, RECONSTRUCTION OF ORIEL AND PORTION OF WALL, REPLACEMENT OF WINDOWS (IN THE SAME SIZE AND LOCATION), KITCHEN & 2ND FLOOR BATHROOM RENOVATION AS PER PLANS. ELECTRICAL, PLUMBING, HVAC ALTERATIONS (PERMITS TO BE PULLED SEPARATELY BY SUBCONTRACTORS). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. ********* AS PER CHAP: ''ON FAÇADE, REMOVE FOUR HISTORIC 1/1 WINDOWS THAT ARE LEAD-BASED PAINT HAZARDS FROM THE SECOND AND THIRD FLOORS, DEMOING TO THE BRICK OPENING. INSTALL FULL REPLACEMENT MARVIN ULTIMATE MAGNUM 1/1 WINDOWS WITH OGEE LUGS ON TOP SASHES, AND BALTIMORE BULLNOSE BRICKMOLD, PAINTED PETROL BLUE. WINDOWS WILL PROPERLY FIT THE WINDOW OPENINGS. DEMOLISH STRUCTURALLY-UNSOUND 2-STORY REAR ORIEL BAY AND RECONSTRUCT TO MATCH EXISTING IN DIMENSIONS AND PROPORTIONS, WITH THE SIX WINDOWS TO MATCH THE EXISTING IN SIZE ON THE SECOND FLOOR; THE WINDOWS ON THE FIRST FLOOR WILL BE SHORTENED TO ACCOMMODATE INTERIOR CHANGES. THE CORNICE WILL BE REPLICATED TO MATCH EXISTING. CORNICES WILL BE PAINTED BLACK; BODY OF ORIEL AND WINDOWS WILL BE PAINTED PETROL BLUE. SIDING WILL BE SMOOTH HARDIE-PANEL; CORNICE WILL BE WOOD OR AZEK. ORIEL ROOF WILL BE STANDING SEAM METAL. WINDOWS WILL BE 2/2 JELD-WEN SITELINE WOOD WINDOWS. REMOVE A WINDOW AND INSTALL A NEW DOOR WITH TRANSOM ON REAR FIRST FLOOR ELEVATION; DOOR WILL BE WOOD FULL LIGHT JELD WEN, AND TRANSOM WILL BE FIXED SINGLE LIGHT. CONSTRUCT APPROX. 15’ X 15’ DECK AND STAIRS ON FIRST FLOOR REAR, DECKING WILL BE PRESSURE TREATED WOOD OR TROPICAL HARDWOOD, RAILING WILL BE BLACK STEEL WITH WOOD HANDRAIL. ALL WORK TO BE COMPLETED AS PER PLANS/SPECS IN CHAP FILES.'' | — | Aug 18, 2023 |
| COM2023 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-86109:SCOPE OF WORK: INTERIOR / EXTERIOR ALTERATIONS TO INCLUDE: FRAMING TO CREATE NEW PARTITION WALLS, INSTALL NEW DRYWALL, INSTALL NEW INTERIOR DOORS, INSTALL NEW FINISHES, RECONSTRUCTION OF A PORTION OF THE FLOOR JOISTS SYSTEM, RECONSTRUCTION OF ORIEL AND PORTION OF WALL, REPLACEMENT OF WINDOWS (IN THE SAME SIZE AND LOCATION), KITCHEN & 2ND FLOOR BATHROOM RENOVATION AS PER PLANS. ELECTRICAL, PLUMBING, HVAC ALTERATIONS (PERMITS TO BE PULLED SEPARATELY BY SUBCONTRACTORS). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. ********* AS PER CHAP: ''ON FAÇADE, REMOVE FOUR HISTORIC 1/1 WINDOWS THAT ARE LEAD-BASED PAINT HAZARDS FROM THE SECOND AND THIRD FLOORS, DEMOING TO THE BRICK OPENING. INSTALL FULL REPLACEMENT MARVIN ULTIMATE MAGNUM 1/1 WINDOWS WITH OGEE LUGS ON TOP SASHES, AND BALTIMORE BULLNOSE BRICKMOLD, PAINTED PETROL BLUE. WINDOWS WILL PROPERLY FIT THE WINDOW OPENINGS. DEMOLISH STRUCTURALLY-UNSOUND 2-STORY REAR ORIEL BAY AND RECONSTRUCT TO MATCH EXISTING IN DIMENSIONS AND PROPORTIONS, WITH THE SIX WINDOWS TO MATCH THE EXISTING IN SIZE ON THE SECOND FLOOR; THE WINDOWS ON THE FIRST FLOOR WILL BE SHORTENED TO ACCOMMODATE INTERIOR CHANGES. THE CORNICE WILL BE REPLICATED TO MATCH EXISTING. CORNICES WILL BE PAINTED BLACK; BODY OF ORIEL AND WINDOWS WILL BE PAINTED PETROL BLUE. SIDING WILL BE SMOOTH HARDIE-PANEL; CORNICE WILL BE WOOD OR AZEK. ORIEL ROOF WILL BE STANDING SEAM METAL. WINDOWS WILL BE 2/2 JELD-WEN SITELINE WOOD WINDOWS. REMOVE A WINDOW AND INSTALL A NEW DOOR WITH TRANSOM ON REAR FIRST FLOOR ELEVATION; DOOR WILL BE WOOD FULL LIGHT JELD WEN, AND TRANSOM WILL BE FIXED SINGLE LIGHT. CONSTRUCT APPROX. 15’ X 15’ DECK AND STAIRS ON FIRST FLOOR REAR, DECKING WILL BE PRESSURE TREATED WOOD OR TROPICAL HARDWOOD, RAILING WILL BE BLACK STEEL WITH WOOD HANDRAIL. ALL WORK TO BE COMPLETED AS PER PLANS/SPECS IN CHAP FILES.'' ) Original Permit Description:(COM2022-86109) SCOPE OF WORK: INTERIOR / EXTERIOR ALTERATIONS TO INCLUDE: FRAMING TO CREATE NEW PARTITION WALLS, INSTALL NEW DRYWALL, INSTALL NEW INTERIOR DOORS, INSTALL NEW FINISHES, RECONSTRUCTION OF A PORTION OF THE FLOOR JOISTS SYSTEM, RECONSTRUCTION OF ORIEL AND PORTION OF WALL, REPLACEMENT OF WINDOWS (IN THE SAME SIZE AND LOCATION), KITCHEN & 2ND FLOOR BATHROOM RENOVATION AS PER PLANS. ELECTRICAL, PLUMBING, HVAC ALTERATIONS (PERMITS TO BE PULLED SEPARATELY BY SUBCONTRACTORS). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. ********* AS PER CHAP: ''ON FAÇADE, REMOVE FOUR HISTORIC 1/1 WINDOWS THAT ARE LEAD-BASED PAINT HAZARDS FROM THE SECOND AND THIRD FLOORS, DEMOING TO THE BRICK OPENING. INSTALL FULL REPLACEMENT MARVIN ULTIMATE MAGNUM 1/1 WINDOWS WITH OGEE LUGS ON TOP SASHES, AND BALTIMORE BULLNOSE BRICKMOLD, PAINTED PETROL BLUE. WINDOWS WILL PROPERLY FIT THE WINDOW OPENINGS. DEMOLISH STRUCTURALLY-UNSOUND 2-STORY REAR ORIEL BAY AND RECONSTRUCT TO MATCH EXISTING IN DIMENSIONS AND PROPORTIONS, WITH THE SIX WINDOWS TO MATCH THE EXISTING IN SIZE ON THE SECOND FLOOR; THE WINDOWS ON THE FIRST FLOOR WILL BE SHORTENED TO ACCOMMODATE INTERIOR CHANGES. THE CORNICE WILL BE REPLICATED TO MATCH EXISTING. CORNICES WILL BE PAINTED BLACK; BODY OF ORIEL AND WINDOWS WILL BE PAINTED PETROL BLUE. SIDING WILL BE SMOOTH HARDIE-PANEL; CORNICE WILL BE WOOD OR AZEK. ORIEL ROOF WILL BE STANDING SEAM METAL. WINDOWS WILL BE 2/2 JELD-WEN SITELINE WOOD WINDOWS. REMOVE A WINDOW AND INSTALL A NEW DOOR WITH TRANSOM ON REAR FIRST FLOOR ELEVATION; DOOR WILL BE WOOD FULL LIGHT JELD WEN, AND TRANSOM WILL BE FIXED SINGLE LIGHT. CONSTRUCT APPROX. 15’ X 15’ DECK AND STAIRS ON FIRST FLOOR REAR, DECKING WILL BE PRESSURE TREATED WOOD OR TROPICAL HARDWOOD, RAILING WILL BE BLACK STEEL WITH WOOD HANDRAIL. ALL WORK TO BE COMPLETED AS PER PLANS/SPECS IN CHAP FILES.'' | — | Jul 19, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2022-90318:SCOPE OF WORK: ALTERATIONS TO INCLUDE: PLUMBING RENOVATIONS FOR KITCHEN TO INCLUDE 1 FAUCET, ICEMAKER AND DISHWASHER HOOK UP, BATHROOM TO INCLUDE 1EA SHOWER, TOILET AND LAVATORY. INCLUDES WASHER HOOK UP AND GAS DRYER IN LAUNDRY. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE) Original Permit Description:(COM2022-90318) SCOPE OF WORK: ALTERATIONS TO INCLUDE: PLUMBING RENOVATIONS FOR KITCHEN TO INCLUDE 1 FAUCET, ICEMAKER AND DISHWASHER HOOK UP, BATHROOM TO INCLUDE 1EA SHOWER, TOILET AND LAVATORY. INCLUDES WASHER HOOK UP AND GAS DRYER IN LAUNDRY. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | — | Jun 13, 2023 |
| COM2023 | INSTALL (16) # BRANCH CIRCUITS/FEEDERS , (1) # FIXTURES/DEVICES AS PER CODE. | $1,000 | Feb 24, 2023 |
| COM2023 | INSTALL (6) # BRANCH CIRCUITS/FEEDERS , (50) # FIXTURES/DEVICES, (3) # LOW VOLTAGE AS PER CODE. | $10,000 | Feb 15, 2023 |
| COM2023 | INSTALL (2) 40 CFM NEW DISTRIBUTION SYSTEM (OTHER THAN 1-2 FAMILY ), (1) 100 CFM NEW DISTRIBUTION SYSTEM (OTHER THAN 1-2 FAMILY ) AS PER CODE. | $5,000 | Jan 19, 2023 |
| COM2022 | SCOPE OF WORK: ALTERATIONS TO INCLUDE: PLUMBING RENOVATIONS FOR KITCHEN TO INCLUDE 1 FAUCET, ICEMAKER AND DISHWASHER HOOK UP, BATHROOM TO INCLUDE 1EA SHOWER, TOILET AND LAVATORY. INCLUDES WASHER HOOK UP AND GAS DRYER IN LAUNDRY. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $8,800 | Dec 8, 2022 |
| COM2022 | SCOPE OF WORK: INTERIOR / EXTERIOR ALTERATIONS TO INCLUDE: FRAMING TO CREATE NEW PARTITION WALLS, INSTALL NEW DRYWALL, INSTALL NEW INTERIOR DOORS, INSTALL NEW FINISHES, RECONSTRUCTION OF A PORTION OF THE FLOOR JOISTS SYSTEM, RECONSTRUCTION OF ORIEL AND PORTION OF WALL, REPLACEMENT OF WINDOWS (IN THE SAME SIZE AND LOCATION), KITCHEN & 2ND FLOOR BATHROOM RENOVATION AS PER PLANS. ELECTRICAL, PLUMBING, HVAC ALTERATIONS (PERMITS TO BE PULLED SEPARATELY BY SUBCONTRACTORS). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. ********* AS PER CHAP: ''ON FAÇADE, REMOVE FOUR HISTORIC 1/1 WINDOWS THAT ARE LEAD-BASED PAINT HAZARDS FROM THE SECOND AND THIRD FLOORS, DEMOING TO THE BRICK OPENING. INSTALL FULL REPLACEMENT MARVIN ULTIMATE MAGNUM 1/1 WINDOWS WITH OGEE LUGS ON TOP SASHES, AND BALTIMORE BULLNOSE BRICKMOLD, PAINTED PETROL BLUE. WINDOWS WILL PROPERLY FIT THE WINDOW OPENINGS. DEMOLISH STRUCTURALLY-UNSOUND 2-STORY REAR ORIEL BAY AND RECONSTRUCT TO MATCH EXISTING IN DIMENSIONS AND PROPORTIONS, WITH THE SIX WINDOWS TO MATCH THE EXISTING IN SIZE ON THE SECOND FLOOR; THE WINDOWS ON THE FIRST FLOOR WILL BE SHORTENED TO ACCOMMODATE INTERIOR CHANGES. THE CORNICE WILL BE REPLICATED TO MATCH EXISTING. CORNICES WILL BE PAINTED BLACK; BODY OF ORIEL AND WINDOWS WILL BE PAINTED PETROL BLUE. SIDING WILL BE SMOOTH HARDIE-PANEL; CORNICE WILL BE WOOD OR AZEK. ORIEL ROOF WILL BE STANDING SEAM METAL. WINDOWS WILL BE 2/2 JELD-WEN SITELINE WOOD WINDOWS. REMOVE A WINDOW AND INSTALL A NEW DOOR WITH TRANSOM ON REAR FIRST FLOOR ELEVATION; DOOR WILL BE WOOD FULL LIGHT JELD WEN, AND TRANSOM WILL BE FIXED SINGLE LIGHT. CONSTRUCT APPROX. 15’ X 15’ DECK AND STAIRS ON FIRST FLOOR REAR, DECKING WILL BE PRESSURE TREATED WOOD OR TROPICAL HARDWOOD, RAILING WILL BE BLACK STEEL WITH WOOD HANDRAIL. ALL WORK TO BE COMPLETED AS PER PLANS/SPECS IN CHAP FILES.'' | $250,000 | Dec 5, 2022 |
| COM2022 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: CATEGORY I NON-STRUCTURAL DEMOLITION, INCLUDING THE REMOVAL OF PLASTER, DRYWALL, INTERIOR DOORS, NON-BEARING WALLS, FLOORING MATERIALS, AND REMOVAL OF DEBRIS AND/OR EQUIPMENT). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *THIS PERMIT IS FOR INTERIOR DEMOLITION ONLY, SEPARATE PERMIT WILL BE PULLED FOR ANY INTERIOR RENOVATIONS | $4,000 | Oct 25, 2022 |
| COM2020 | PER CHAPS ATP: BOLTON HILL - APPROVED AS PER CHAP ATP: CAREFULLY TEMPORARILY DECONSTRUCT THE STONE ARCHED LINTEL ABOVE A SECOND FLOOR WINDOW ON THE FAÇADE, AS IT IS FAILING. REINSTALL THE STONES AND ANY BRICKS THAT ALSO HAVE TO BE RESET TO MATCH EXISTING, USING A MORTAR THAT MATCHES THE HISTORIC MORTAR IN COMPOSITION, COLOR, AND JOINT PROFILES. ALL WORK COMPLETED AS PER PLANS IN CHAP FILES.SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: THE JOB ENTAILS RESTORING THE ARCH AND BRICK WORK ABOVE THE SECOND FLOOR WINDOW ON THE LEFT HAND SIDE IF FACING PRIMARY ELEVATION OF SAID ADDRESS. THERE WILL BE NO PAINT REMOVAL AND WE WILL USE A TYPE N MORTAR TO MATCH THE ORIGINAL COLOR. WE WILL REUSE ALL THE ORIGINAL STONE AND BRICK. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $2,000 | Sep 23, 2020 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-Dirty AlleyJul 8, 2026 · 32 m
- permit: BRCMJul 6, 2026 · 122 m · 1429 JOHN ST
- permit: BRCMJun 25, 2026 · 66 m · 1510 PARK AVE
- violation: PM 305.2.2Jun 25, 2026 · 94 m · 1428 PARK AVE
- violation: HCD-Maintenance StructureJun 25, 2026 · 98 m · 1422 PARK AVE
- violation: HCD-Maintenance StructureJun 25, 2026 · 98 m · 1422 PARK AVE
- violation: PM 305.2.2Jun 25, 2026 · 138 m · 1429 BOLTON ST
- violation: HCD-Sanitation PropertyJun 22, 2026 · 86 m · 1428 PARK AVE
- violation: HCD-Sanitation PropertyJun 19, 2026 · 137 m
- violation: SW-Dirty AlleyJun 16, 2026 · 92 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.