Baltimore City · 21217

1754 PARK AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$323,967
Land use
Residential (R)
Year built
1890
Last sale
Jul 5, 2023

Assessment

OwnerL.M. PARK, LLC
Land useResidential (R)
Total assessment$323,967 (cycle 2026)
Last saleJul 5, 2023 — $279,000
Year built1890
ZoningR-8
Vacant

Permits

2
TypeDescriptionCostIssued
COM2024 Extend Original Permit.(original permit:COM2023-82857:FOR EXTERIOR, ALLWORK IS TO BE DONE ON BUMP OUT IN BACK OF HOUSE: REPLACE ANY BAD/ROTTED SIDING. INSTALL DECORATIVE TRIM. SEAL ANY EXPOSED SEAMS TO MAKE BUMP OUT WATER TIGHT. RE-PAINT BUMP OUT. FOR INTERIOR WORK: UPGRADE KITCHEN COUNTERS. INSTALL 2-4 OUTLETS IN KITCHEN. BUILD SHELVING IN PANTRY CLOSET. UPGRADE EXISTIGN KITCHEN APPLIANCES. INSTALL CABINET ABOVE WASHER/DRYER. TILE BACKSPLASH IN KITCHEN. RE-TILE SECOND FLOOR BATHROOM. UPDATE/REPLACE CURRENT SHOWER DOOR. REPAINT ENTIRE HOUSE. SAND AND RE-FINISH FLOORS THROUGHOUT THE HOUSE. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE*****PER CHAP: ATP: RETROACTIVE APPROVAL FOR THE REMOVAL OF DETERIORATED CLADDING FROM THE REAR ORIEL BAY AND INSTALLATION OF NEW WOOD CLADDING THAT IS SIMILAR IN DETAILS, INSTALLATION OF METAL BRACING MOUNTED INTO THE BRICK BELOW THE ORIEL BAY, AND PAINTING OF A PORTION OF THE ORIEL BAY. THIS WORK REQUIRED THE TEMPORARY REMOVAL AND REINSTALLATION OF WINDOWS. FILL IN THE GAPS OF THE FRAMING WITH APPROPRIATE WOOD FILLER, INSTALL MISSING TRIMBOARDS ON THE SIDES/BASE OF THE BAY, AND PAINT THE REPLACED PORTION OF THE BAY CLADDING WHITE TO MATCH THE REST OF THE BAY. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES EXCEPT WHERE THIS ATP SUPERSEDES.****) Original Permit Description:(COM2023-82857) FOR EXTERIOR, ALLWORK IS TO BE DONE ON BUMP OUT IN BACK OF HOUSE: REPLACE ANY BAD/ROTTED SIDING. INSTALL DECORATIVE TRIM. SEAL ANY EXPOSED SEAMS TO MAKE BUMP OUT WATER TIGHT. RE-PAINT BUMP OUT. FOR INTERIOR WORK: UPGRADE KITCHEN COUNTERS. INSTALL 2-4 OUTLETS IN KITCHEN. BUILD SHELVING IN PANTRY CLOSET. UPGRADE EXISTIGN KITCHEN APPLIANCES. INSTALL CABINET ABOVE WASHER/DRYER. TILE BACKSPLASH IN KITCHEN. RE-TILE SECOND FLOOR BATHROOM. UPDATE/REPLACE CURRENT SHOWER DOOR. REPAINT ENTIRE HOUSE. SAND AND RE-FINISH FLOORS THROUGHOUT THE HOUSE. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE*****PER CHAP: ATP: RETROACTIVE APPROVAL FOR THE REMOVAL OF DETERIORATED CLADDING FROM THE REAR ORIEL BAY AND INSTALLATION OF NEW WOOD CLADDING THAT IS SIMILAR IN DETAILS, INSTALLATION OF METAL BRACING MOUNTED INTO THE BRICK BELOW THE ORIEL BAY, AND PAINTING OF A PORTION OF THE ORIEL BAY. THIS WORK REQUIRED THE TEMPORARY REMOVAL AND REINSTALLATION OF WINDOWS. FILL IN THE GAPS OF THE FRAMING WITH APPROPRIATE WOOD FILLER, INSTALL MISSING TRIMBOARDS ON THE SIDES/BASE OF THE BAY, AND PAINT THE REPLACED PORTION OF THE BAY CLADDING WHITE TO MATCH THE REST OF THE BAY. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES EXCEPT WHERE THIS ATP SUPERSEDES.****Mar 21, 2024
COM2023FOR EXTERIOR, ALLWORK IS TO BE DONE ON BUMP OUT IN BACK OF HOUSE: REPLACE ANY BAD/ROTTED SIDING. INSTALL DECORATIVE TRIM. SEAL ANY EXPOSED SEAMS TO MAKE BUMP OUT WATER TIGHT. RE-PAINT BUMP OUT. FOR INTERIOR WORK: UPGRADE KITCHEN COUNTERS. INSTALL 2-4 OUTLETS IN KITCHEN. BUILD SHELVING IN PANTRY CLOSET. UPGRADE EXISTIGN KITCHEN APPLIANCES. INSTALL CABINET ABOVE WASHER/DRYER. TILE BACKSPLASH IN KITCHEN. RE-TILE SECOND FLOOR BATHROOM. UPDATE/REPLACE CURRENT SHOWER DOOR. REPAINT ENTIRE HOUSE. SAND AND RE-FINISH FLOORS THROUGHOUT THE HOUSE. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE*****PER CHAP: ATP: RETROACTIVE APPROVAL FOR THE REMOVAL OF DETERIORATED CLADDING FROM THE REAR ORIEL BAY AND INSTALLATION OF NEW WOOD CLADDING THAT IS SIMILAR IN DETAILS, INSTALLATION OF METAL BRACING MOUNTED INTO THE BRICK BELOW THE ORIEL BAY, AND PAINTING OF A PORTION OF THE ORIEL BAY. THIS WORK REQUIRED THE TEMPORARY REMOVAL AND REINSTALLATION OF WINDOWS. FILL IN THE GAPS OF THE FRAMING WITH APPROPRIATE WOOD FILLER, INSTALL MISSING TRIMBOARDS ON THE SIDES/BASE OF THE BAY, AND PAINT THE REPLACED PORTION OF THE BAY CLADDING WHITE TO MATCH THE REST OF THE BAY. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES EXCEPT WHERE THIS ATP SUPERSEDES.****$6,000Oct 16, 2023

Violations

4
KindCategoryStatusFineBalanceDate
service_requestHCD-Sanitation PropertyClosedJun 23, 2026
citationPM 305.9P$50$0Feb 12, 2026
citationPM 305.9P$50$0Feb 12, 2026
citationPM 305.1O$50$150Dec 29, 2025

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.