Baltimore City · 21216
2200 N ROSEDALE ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $130,367
- Land use
- Residential (R)
- Year built
- 1930
- Last sale
- Feb 8, 2023
Assessment
| Owner | MCMILLIAN, AKITO |
|---|---|
| Land use | Residential (R) |
| Total assessment | $130,367 (cycle 2026) |
| Last sale | Feb 8, 2023 — $83,000 |
| Year built | 1930 |
| Zoning | R-6 |
| Vacant | Yes |
Permits
6| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2024 | INSTALL (1) 100000 BTU FUEL-BURNING EQUIP, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 30000 BTU FUEL-BURNING EQUIP AS PER CODE. | $750 | Dec 26, 2024 |
| COM2024 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-83878:INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (8) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 18000 BTU FUEL-BURNING EQUIP, (1) 72000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2022-83878) INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (8) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 18000 BTU FUEL-BURNING EQUIP, (1) 72000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | May 16, 2024 |
| COM2024 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-83878:INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (8) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 18000 BTU FUEL-BURNING EQUIP, (1) 72000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2022-83878) INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (8) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 18000 BTU FUEL-BURNING EQUIP, (1) 72000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Mar 5, 2024 |
| COM2023 | Extend Original Permit.(original permit:COM2022-83878:INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (8) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 18000 BTU FUEL-BURNING EQUIP, (1) 72000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2022-83878) INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (8) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 18000 BTU FUEL-BURNING EQUIP, (1) 72000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Apr 26, 2023 |
| COM2022 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: 600 SQ FT DRYWALL / PERIMETER WALL FRAMING (PERIMETER WALLS FRAMING/NO NEW PARTITION WALLS TO BE BUILT)/ 6 WINDOWS AND 2 EXTERIOR DOORS (BOTH SAME SIZE SAME LOCATION), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $5,600 | Oct 14, 2022 |
| COM2022 | INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (8) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 18000 BTU FUEL-BURNING EQUIP, (1) 72000 BTU FUEL-BURNING EQUIP AS PER CODE. | $6,900 | Oct 11, 2022 |
Violations
3| Kind | Category | Status | Date |
|---|---|---|---|
| service_request | SW-Dirty Alley | Closed (Duplicate) | Mar 19, 2026 |
| service_request | SW-Dirty Alley | Closed | Feb 20, 2026 |
| vacant_building_notice | Vacant | open | May 31, 2019 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Illegal DumpingJul 6, 2026 · 24 m · 3100 WINDSOR AVE
- violation: HCD-Sanitation PropertyJul 6, 2026 · 105 m
- violation: SW-Dirty AlleyJun 29, 2026 · 145 m · 3201 ELGIN AVE
- violation: HCD-Sanitation PropertyJun 26, 2026 · 132 m
- violation: PM 305.2.2Jun 22, 2026 · 46 m · 3019 POPLAR TERR
- violation: PM 306.2Jun 22, 2026 · 46 m · 3019 POPLAR TERR
- violation: HCD-Sanitation PropertyJun 19, 2026 · 47 m
- violation: SW-HGWJun 16, 2026 · 95 m · 2213 N ELLAMONT ST
- violation: SW-HGWJun 16, 2026 · 111 m
- violation: HCD-Sanitation PropertyJun 11, 2026 · 124 m · 3200 WINDSOR AVE
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.