Baltimore City · 21215
2800 VIOLET AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $240,000
- Land use
- Residential (R)
- Year built
- 1920
- Last sale
- Oct 5, 2023
Assessment
| Owner | AGWU, UGO JOHNSON |
|---|---|
| Land use | Residential (R) |
| Total assessment | $240,000 (cycle 2026) |
| Last sale | Oct 5, 2023 — $210,000 |
| Year built | 1920 |
| Zoning | R-6 |
| Vacant | — |
Permits
10| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2023 | USE AS A SINGLE-FAMILY DWELLING. | — | Mar 10, 2023 |
| COM2023 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-84830:INSTALL (12) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2021-84830) INSTALL (12) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Jan 24, 2023 |
| COM2023 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-89723:INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 70000 BTU FUEL-BURNING EQUIP(FURNACE), (1) 800 CFM NEW DISTRIBUTION SYSTEM (OTHER THAN 1-2 FAMILY ) AS PER CODE.) Original Permit Description:(COM2021-89723) INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 70000 BTU FUEL-BURNING EQUIP(FURNACE), (1) 800 CFM NEW DISTRIBUTION SYSTEM (OTHER THAN 1-2 FAMILY ) AS PER CODE. | — | Jan 20, 2023 |
| COM2023 | AMEND PERMIT: CHANGE ELECTRICAL CONTRACTOR .REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-84251:INSTALL (25) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.) Original Permit Description:(COM2021-84251) INSTALL (25) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | — | Jan 4, 2023 |
| COM2022 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY 1): INTERIOR FRAME TO CREATE NEW PARTITION WALLS, R21 INSULATION IN THE EXTERIOR WALLS, R49 INSULATION IN THE ATTIC, DRYWALL, EXTERIOR DOORS TO BE INSTALL IN EXISTING OPENINGS, REPLACE VINYL WINDOWS TO BE INSTALL IN EXISTING OPENINGS, INTERIOR DOORS, MOLDINGS, FLOOR, TILES, CABINET, STAIR WAY NEW OAK STAIRS, COORDINATE FINAL RISER HEIGHTS WITH FINAL FLOOR WITH THE MANUFACTURE COMPANY AND THE RAIL, REPAIR SUBFLOORS, WITH 3/4 OSB, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES). ALL WORK PER CODE. | $40,000 | Nov 3, 2022 |
| COM2021 | INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 70000 BTU FUEL-BURNING EQUIP(FURNACE), (1) 800 CFM NEW DISTRIBUTION SYSTEM (OTHER THAN 1-2 FAMILY ) AS PER CODE. | $7,200 | Dec 27, 2021 |
| COM2021 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): INTERIOR FRAME ON THE PERIMETER WALLS AND TO CREATE NEW PARTITION WALLS, R21 INSULATION IN THE EXTERIOR WALLS, R49 INSULATION IN THE ATTIC, DRYWALL, EXTERIOR DOORS TO BE INSTALL IN EXISTING OPENINGS, REPLACE VINYL WINDOWS TO BE INSTALL IN EXISTING OPENINGS, INTERIOR DOORS, MOLDING, FLOOR, TILES, CABINET, STAIR WAY TO REMAIN, REPAIR SUBFLOORS WITH 3/4 OSB, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) | $30,000 | Dec 21, 2021 |
| COM2021 | INSTALL (25) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $5,000 | Dec 14, 2021 |
| COM2021 | INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $1,200 | Nov 29, 2021 |
| COM2021 | INSTALL (12) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE. | $1,100 | Nov 10, 2021 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-HGWJul 8, 2026 · 80 m · 3709 REISTERSTOWN RD
- permit: BRCMJul 7, 2026 · 121 m · 3629 REISTERSTOWN RD
- violation: HCD-Illegal DumpingJul 6, 2026 · 85 m · 3719 TOWANDA AVE
- violation: HCD-Illegal DumpingJul 6, 2026 · 91 m · 3721 TOWANDA AVE
- violation: HCD-Illegal DumpingJul 6, 2026 · 129 m · 2911 ROCKROSE AVE
- violation: HCD-Sanitation PropertyJul 6, 2026 · 129 m · 2817 ROCKROSE AVE
- violation: HCD-Illegal DumpingJul 6, 2026 · 149 m · 3738 TOWANDA AVE
- violation: HCD-Sanitation PropertyJul 2, 2026 · 132 m · 3701 OVERVIEW RD
- violation: SW-HGWJul 1, 2026 · 11 m · 2804 VIOLET AVE
- violation: SW-Dirty AlleyJul 1, 2026 · 81 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.