Baltimore City · 21215
2400 LOYOLA NORTHWAY
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $1,761,700
- Land use
- Apartments (M)
- Year built
- 1966
- Last sale
- Nov 13, 2020
Assessment
| Owner | GREENSPRING OVERLOOK |
|---|---|
| Land use | Apartments (M) |
| Total assessment | $1,761,700 (cycle 2026) |
| Last sale | Nov 13, 2020 — $10,000,000 |
| Year built | 1966 |
| Zoning | R-6 |
| Vacant | — |
Permits
5| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2020 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2019-02129:INTERIOR/EXTERIOR ALTERATIONS FOR THE RENOVATION OF 189 GARDEN APARTMENTS, COMPLETE PLUMBING SYSTEM REPLACEMENT, HVAC EQUIPMENT AND LIGHT FIXTURE REPLACEMENT, ACCESSIBLE UNIT ALTERATIONS TO BRING INTO FULL COMPLIANCE, SITE ACCESSIBILITY ALTERATIONS TO BRING INTO FULL COMPLIANCE, NEW FINISHES IN COMMON AREAS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. THE RETAINING WALL CONSTRUCTION PLAN MUST BE PROVIDED TO THE PLAN EXAMINING DEPARTMENT FOR APPROVAL BEFORE ITS CONSTRUCTION STARTS. ) Original Permit Description:(COM2019-02129) INTERIOR/EXTERIOR ALTERATIONS FOR THE RENOVATION OF 189 GARDEN APARTMENTS, COMPLETE PLUMBING SYSTEM REPLACEMENT, HVAC EQUIPMENT AND LIGHT FIXTURE REPLACEMENT, ACCESSIBLE UNIT ALTERATIONS TO BRING INTO FULL COMPLIANCE, SITE ACCESSIBILITY ALTERATIONS TO BRING INTO FULL COMPLIANCE, NEW FINISHES IN COMMON AREAS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. THE RETAINING WALL CONSTRUCTION PLAN MUST BE PROVIDED TO THE PLAN EXAMINING DEPARTMENT FOR APPROVAL BEFORE ITS CONSTRUCTION STARTS. | — | Sep 23, 2020 |
| COM2020 | AMEND PERMIT: ADD PLUMBER AND GAS CONTRACTOR . (ORIGINAL PERMIT:COM2019-02129:INTERIOR/EXTERIOR ALTERATIONS FOR THE RENOVATION OF 189 GARDEN APARTMENTS, COMPLETE PLUMBING SYSTEM REPLACEMENT, HVAC EQUIPMENT AND LIGHT FIXTURE REPLACEMENT, ACCESSIBLE UNIT ALTERATIONS TO BRING INTO FULL COMPLIANCE, SITE ACCESSIBILITY ALTERATIONS TO BRING INTO FULL COMPLIANCE, NEW FINISHES IN COMMON AREAS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. THE RETAINING WALL CONSTRUCTION PLAN MUST BE PROVIDED TO THE PLAN EXAMINING DEPARTMENT FOR APPROVAL BEFORE ITS CONSTRUCTION STARTS. ) Original Permit Description:(COM2019-02129) INTERIOR/EXTERIOR ALTERATIONS FOR THE RENOVATION OF 189 GARDEN APARTMENTS, COMPLETE PLUMBING SYSTEM REPLACEMENT, HVAC EQUIPMENT AND LIGHT FIXTURE REPLACEMENT, ACCESSIBLE UNIT ALTERATIONS TO BRING INTO FULL COMPLIANCE, SITE ACCESSIBILITY ALTERATIONS TO BRING INTO FULL COMPLIANCE, NEW FINISHES IN COMMON AREAS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. THE RETAINING WALL CONSTRUCTION PLAN MUST BE PROVIDED TO THE PLAN EXAMINING DEPARTMENT FOR APPROVAL BEFORE ITS CONSTRUCTION STARTS. | — | Sep 10, 2020 |
| COM2019 | INTERIOR/EXTERIOR ALTERATIONS FOR THE RENOVATION OF 189 GARDEN APARTMENTS, COMPLETE PLUMBING SYSTEM REPLACEMENT, HVAC EQUIPMENT AND LIGHT FIXTURE REPLACEMENT, ACCESSIBLE UNIT ALTERATIONS TO BRING INTO FULL COMPLIANCE, SITE ACCESSIBILITY ALTERATIONS TO BRING INTO FULL COMPLIANCE, NEW FINISHES IN COMMON AREAS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. THE RETAINING WALL CONSTRUCTION PLAN MUST BE PROVIDED TO THE PLAN EXAMINING DEPARTMENT FOR APPROVAL BEFORE ITS CONSTRUCTION STARTS. | $9,971,760 | May 7, 2020 |
| COM2020 | INSTALL (3) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $2,500 | Feb 27, 2020 |
| COM2020 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: REPLACEMENT OF SLIDING GLASS DOOR (8' WITH 3' SIDE LIGHT) AND MASTER BEDROOM WINDOW (51'' X 61'') FOR REPAIR FROM FIRE DAMAGE. UNIT IS LOCATED IN BUILDING 2404 LOYOLA NORTHWOODS, UNIT #102. (SAME SIZE AND LOCATION), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. | $2,000 | Jan 21, 2020 |
Violations
1| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | BC 123.8.2 | O | $250 | $375 | Apr 10, 2026 |
Inspections
1| Type | Status |
|---|---|
| Initial | OPEN |
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 8, 2026 · 120 m · 2505 QUANTICO AVE
- violation: PM 305.2.2Jul 7, 2026 · 137 m · 2518 QUANTICO AVE
- violation: HCD-Zoning InvestigationJul 5, 2026 · 119 m
- violation: HCD-Sanitation PropertyJun 30, 2026 · 136 m · 2518 QUANTICO AVE
- violation: HCD-Sanitation PropertyJun 29, 2026 · 101 m
- violation: HCD-Vacant BuildingJun 26, 2026 · 120 m · 2505 QUANTICO AVE
- violation: SW-HGWJun 1, 2026 · 118 m
- violation: SW-Dirty AlleyMay 29, 2026 · 47 m
- violation: SW-Dirty AlleyMay 29, 2026 · 70 m
- violation: SW-Dirty AlleyMay 29, 2026 · 80 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.