Baltimore City · 21217
1030 N GILMOR ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $28,000
- Land use
- Residential (R)
- Year built
- 1920
- Last sale
- Dec 4, 2020
Assessment
| Owner | DESTINO BOLIVIA LLC |
|---|---|
| Land use | Residential (R) |
| Total assessment | $28,000 (cycle 2026) |
| Last sale | Dec 4, 2020 — $23,000 |
| Year built | 1920 |
| Zoning | R-8 |
| Vacant | — |
Permits
12| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | two bathroom., laundry, and kitchen | $20,000 | May 19, 2026 |
| BRCM | INSTALLATION OF A 200 AMP SERVICE, NEW BRANCH CIRCUITS, AND NEW FIXTURES AND DEVICES | $4,500 | Apr 17, 2026 |
| BRCM | TO INSTALL (1) 60000 BTU FUEL-BURNING AND (1) 24000 btu condenser as per code (Rough in was done under COM2024-59651) | $7,500 | Feb 17, 2026 |
| BRCM | INTERIOR ALTERATIONS (1000SQ/FT) TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I):REMOVAL OF THE PLASTER, TRIM, NON-STRUCTURAL WALLS, DOORS, FLOORING AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING USING 2X4 TO CREATE NEW BATHROOM ON THE FIRST FLOOR AND BATHROOM ON THE SECOND FLOOR, INSTALL NEW DRYWALL, INSTALL NEW TRIM, INSTALL NEW INTERIOR DOORS, INSTALL NEW COSMETIC FINISHES, REPAIR KITCHEN 2X6 STUD WALL. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, SEPARATE PERMITS WILL BE PULLED FOR ANY MEP WORK. AS PER PLANS AND AS PER CODE. | $50,000 | Jan 13, 2026 |
| COM2024 | SCOPE OF WORK: ELECTRICAL ALTERATIONS TO INCLUDE: HEAVY UP, INSTALLATION OF FIXTURES/DEVICES AND CIRCUITS, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $10,000 | May 7, 2024 |
| COM2024 | INSTALL (1) 60000 BTU FUEL-BURNING EQUIP(FURNACE), (2) 50 CFM EXHAUST SYSTEMS , (1) 105 CFM EXHAUST SYSTEMS , (1) 600 CFM EXHAUST SYSTEMS , (1) 400 CFM EXHAUST SYSTEMS , (75) CFM EXHAUST SYSTEMS AS PER CODE. | $4,000 | Mar 21, 2024 |
| COM2024 | INSTALL (8) # PLUMBING FIXTURES, (1) 35000 BTU FUEL-BURNING EQUIP, (1) 60000 BTU FUEL-BURNING EQUIP, (1) 45000 BTU FUEL-BURNING EQUIP AS PER CODE. | $4,000 | Mar 21, 2024 |
| COM2024 | INTERIOR ALTERATIONS (1000SQ/FT) TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I):REMOVAL OF THE PLASTER, TRIM, NON-STRUCTURAL WALLS, DOORS, FLOORING AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING USING 2X4 TO CREATE NEW BATHROOM ON THE FIRST FLOOR AND BATHROOM ON THE SECOND FLOOR, INSTALL NEW DRYWALL, INSTALL NEW TRIM, INSTALL NEW INTERIOR DOOR, INSTALL NEW COSMETIC FINISHES, REPAIR KITCHEN 2X6 STUD WALL. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, SEPARATE PERMITS WILL BE PULLED FOR ANY MEP WORK. AS PER PLANS AND AS PER CODE. | $10,000 | Jan 26, 2024 |
| COM2022 | SCOPE OF WORK: INTERIOR ALTERATIONS (1000SQ/FT) TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I):REMOVAL OF THE PLASTER, TRIM, NON-STRUCTURAL WALLS, DOORS, FLOORING AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING USING 2X4 TO CREATE NEW BATHROOM ON THE FIRST FLOOR AND BATHROOM ON THE SECOND FLOOR, INSTALL NEW DRYWALL, INSTALL NEW TRIM, INSTALL NEW INTERIOR DOOR, INSTALL NEW COSMETIC FINISHES, REPAIR KITCHEN 2X6 STUD WALL. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, SEPARATE PERMITS WILL BE PULLED FOR ANY MEP WORK. | $10,000 | Jun 16, 2022 |
| COM2021 | INSTALL (2) # PLUMBING FIXTURES, (2) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (2) # PLUMBING FIXTURES, (1) 500 BTU FUEL-BURNING EQUIP, (1) 5000 BTU FUEL-BURNING EQUIP, (1) 10000 BTU FUEL-BURNING EQUIP AS PER CODE. | $3,500 | Sep 22, 2021 |
| COM2021 | INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 75000 BTU FUEL-BURNING EQUIP(FURNACE), (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 50 CFM EXHAUST SYSTEMS AS PER CODE. | $7,800 | Jun 27, 2021 |
| COM2020 | SCOPE OF WORK: INTERIOR ALTERATIONS (APPROX. 400SQ/FT) TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I):REMOVAL OF THE PLASTER, TRIM, NON-STRUCTURAL WALLS, DOORS, FLOORING AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING USING 2X4 TO CREATE NEW FULL BATHROOM WITH SHOWER ON THE FIRST FLOOR AND RELOCATE FULL BATHROOM ON THE SECOND FLOOR, INSTALL NEW DRYWALL, INSTALL NEW TRIM, INSTALL NEW INTERIOR DOOR, INSTALL NEW COSMETIC FINISHES, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN A CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN A WIDTH OF 36''MIN, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT IF MORE THAN 1). | $10,000 | Dec 21, 2020 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-HGWJul 9, 2026 · 121 m
- violation: SW-HGWJul 9, 2026 · 128 m · 1042 N STRICKER ST
- violation: SW-HGWJul 9, 2026 · 128 m · 1032 N STRICKER ST
- violation: SW-HGWJul 9, 2026 · 128 m · 1040 N STRICKER ST
- violation: SW-HGWJul 9, 2026 · 130 m · 1026 N STRICKER ST
- violation: SW-HGWJul 9, 2026 · 131 m · 1022 N STRICKER ST
- violation: SW-HGWJul 9, 2026 · 132 m · 1020 N STRICKER ST
- violation: SW-HGWJul 9, 2026 · 135 m · 1016 N STRICKER ST
- violation: SW-HGWJul 9, 2026 · 138 m · 1012 N STRICKER ST
- violation: SW-HGWJul 9, 2026 · 139 m · 1010 N STRICKER ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.