Baltimore City · 21229
818 LYNDHURST ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $139,000
- Land use
- Residential (R)
- Year built
- 1938
- Last sale
- Jun 23, 2025
Assessment
| Owner | FAJARDO, MARIANGELA |
|---|---|
| Land use | Residential (R) |
| Total assessment | $139,000 (cycle 2026) |
| Last sale | Jun 23, 2025 — $220,000 |
| Year built | 1938 |
| Zoning | R-6 |
| Vacant | — |
Permits
9| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2024 | Extend Original Permit.(original permit:COM2024-57249: ******** GOOD DAY, MY INTENTION IN SENDING THIS MESSAGE IS TO INFORM ABOUT MY PLAN TO MAKE ALTERATIONS TO THE SPACES AND RECONFIGURE THE ARCHITECTURAL DESIGN TO ENHANCE THE COMFORT OF THE RESIDENTS. I AM ATTACHING THE CURRENT PLANS, DEMOLITION PLANS, AND THE RECONFIGURATION PROPOSAL. THESE CHANGES HAVE BEEN PLANNED AFTER DEMOLISHING AND ENSURING THAT THEY CAN BE CARRIED OUT WITHOUT COMPROMISING THE STRUCTURAL INTEGRITY OF THIS ROW HOUSE. THE PROPOSAL HAS BEEN DESIGNED WITHOUT AFFECTING THE STRUCTURE, TAKING ALL NECESSARY PRECAUTIONS TO PRESERVE THE ADJACENT WALL. ****** SCOPE OF WORK: ------ INTERIOR/EXTERIOR ALTERATIONS ------- BASEMENT: THE TASKS TO BE CARRIED OUT IN THE BASEMENT INCLUDE COVERING THE FOUNDATION WALL BY ADDING A WOODEN AND DRYWALL WALL AROUND ITS ENTIRE INTERIOR PERIMETER (FURRING). ADDITIONALLY, WE WILL PAINT THE FLOOR WITH SUITABLE PAINT. GROUND FLOOR: THE TASKS FOR THE GROUND FLOOR INCLUDE REPLACING AND UPDATING DOORS AND WINDOWS, ADDING A NEW HALF BATHROOM, CONFIRMING THE KITCHEN LAYOUT, CHANGING THE FLOORING, OVERLAYING THE PERIMETER WALL WITH WOOD AND DRYWALL, ADDING MOLDINGS, AND PAINTING. SECOND FLOOR: THE TASKS FOR THE SECOND FLOOR INCLUDE REPLACING AND UPDATING DOORS AND WINDOWS, ADDING A NEW BATHROOM, CHANGING THE FLOORING, OVERLAYING THE PERIMETER WALL WITH WOOD AND DRYWALL, ADDING MOLDINGS, AND PAINTING. AS PER PLANS AND AS PER CODE.) Original Permit Description:(COM2024-57249) ******** GOOD DAY, MY INTENTION IN SENDING THIS MESSAGE IS TO INFORM ABOUT MY PLAN TO MAKE ALTERATIONS TO THE SPACES AND RECONFIGURE THE ARCHITECTURAL DESIGN TO ENHANCE THE COMFORT OF THE RESIDENTS. I AM ATTACHING THE CURRENT PLANS, DEMOLITION PLANS, AND THE RECONFIGURATION PROPOSAL. THESE CHANGES HAVE BEEN PLANNED AFTER DEMOLISHING AND ENSURING THAT THEY CAN BE CARRIED OUT WITHOUT COMPROMISING THE STRUCTURAL INTEGRITY OF THIS ROW HOUSE. THE PROPOSAL HAS BEEN DESIGNED WITHOUT AFFECTING THE STRUCTURE, TAKING ALL NECESSARY PRECAUTIONS TO PRESERVE THE ADJACENT WALL. ****** SCOPE OF WORK: ------ INTERIOR/EXTERIOR ALTERATIONS ------- BASEMENT: THE TASKS TO BE CARRIED OUT IN THE BASEMENT INCLUDE COVERING THE FOUNDATION WALL BY ADDING A WOODEN AND DRYWALL WALL AROUND ITS ENTIRE INTERIOR PERIMETER (FURRING). ADDITIONALLY, WE WILL PAINT THE FLOOR WITH SUITABLE PAINT. GROUND FLOOR: THE TASKS FOR THE GROUND FLOOR INCLUDE REPLACING AND UPDATING DOORS AND WINDOWS, ADDING A NEW HALF BATHROOM, CONFIRMING THE KITCHEN LAYOUT, CHANGING THE FLOORING, OVERLAYING THE PERIMETER WALL WITH WOOD AND DRYWALL, ADDING MOLDINGS, AND PAINTING. SECOND FLOOR: THE TASKS FOR THE SECOND FLOOR INCLUDE REPLACING AND UPDATING DOORS AND WINDOWS, ADDING A NEW BATHROOM, CHANGING THE FLOORING, OVERLAYING THE PERIMETER WALL WITH WOOD AND DRYWALL, ADDING MOLDINGS, AND PAINTING. AS PER PLANS AND AS PER CODE. | — | Aug 29, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2024-54187:INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (5) 100 CFM EXHAUST SYSTEMS , (1) 90000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.) Original Permit Description:(COM2024-54187) INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (5) 100 CFM EXHAUST SYSTEMS , (1) 90000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | — | Aug 20, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2024-53312:INSTALL (1) 50000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP, (16) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 50000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2024-53312) INSTALL (1) 50000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP, (16) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 50000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Aug 1, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2024-54154:INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (30) # BRANCH CIRCUITS/FEEDERS , (55) # FIXTURES/DEVICES, (35) # FIXTURES/DEVICES, (8) # LOW VOLTAGE AS PER CODE.) Original Permit Description:(COM2024-54154) INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (30) # BRANCH CIRCUITS/FEEDERS , (55) # FIXTURES/DEVICES, (35) # FIXTURES/DEVICES, (8) # LOW VOLTAGE AS PER CODE. | — | Aug 1, 2024 |
| COM2024 | ******** GOOD DAY, MY INTENTION IN SENDING THIS MESSAGE IS TO INFORM ABOUT MY PLAN TO MAKE ALTERATIONS TO THE SPACES AND RECONFIGURE THE ARCHITECTURAL DESIGN TO ENHANCE THE COMFORT OF THE RESIDENTS. I AM ATTACHING THE CURRENT PLANS, DEMOLITION PLANS, AND THE RECONFIGURATION PROPOSAL. THESE CHANGES HAVE BEEN PLANNED AFTER DEMOLISHING AND ENSURING THAT THEY CAN BE CARRIED OUT WITHOUT COMPROMISING THE STRUCTURAL INTEGRITY OF THIS ROW HOUSE. THE PROPOSAL HAS BEEN DESIGNED WITHOUT AFFECTING THE STRUCTURE, TAKING ALL NECESSARY PRECAUTIONS TO PRESERVE THE ADJACENT WALL. ****** SCOPE OF WORK: ------ INTERIOR/EXTERIOR ALTERATIONS ------- BASEMENT: THE TASKS TO BE CARRIED OUT IN THE BASEMENT INCLUDE COVERING THE FOUNDATION WALL BY ADDING A WOODEN AND DRYWALL WALL AROUND ITS ENTIRE INTERIOR PERIMETER (FURRING). ADDITIONALLY, WE WILL PAINT THE FLOOR WITH SUITABLE PAINT. GROUND FLOOR: THE TASKS FOR THE GROUND FLOOR INCLUDE REPLACING AND UPDATING DOORS AND WINDOWS, ADDING A NEW HALF BATHROOM, CONFIRMING THE KITCHEN LAYOUT, CHANGING THE FLOORING, OVERLAYING THE PERIMETER WALL WITH WOOD AND DRYWALL, ADDING MOLDINGS, AND PAINTING. SECOND FLOOR: THE TASKS FOR THE SECOND FLOOR INCLUDE REPLACING AND UPDATING DOORS AND WINDOWS, ADDING A NEW BATHROOM, CHANGING THE FLOORING, OVERLAYING THE PERIMETER WALL WITH WOOD AND DRYWALL, ADDING MOLDINGS, AND PAINTING. AS PER PLANS AND AS PER CODE. | $30,000 | Mar 5, 2024 |
| COM2024 | DEMOLISH 11'-8'' THE WALL THAT SEPARATES THE KITCHEN WITH THE DINING ROOM AND A HALF-BATHROOM WALL 3'-4'' AND 3'-1''BETWEEN THE KITTCHEN AND THE LIVING ROOM THIS WALL IS NOT A SUPPORT WALL. AS PER PLANS AND AS PER CODE. | $30,000 | Feb 15, 2024 |
| COM2024 | INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (5) 100 CFM EXHAUST SYSTEMS , (1) 90000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $2,000 | Feb 8, 2024 |
| COM2024 | INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (30) # BRANCH CIRCUITS/FEEDERS , (55) # FIXTURES/DEVICES, (35) # FIXTURES/DEVICES, (8) # LOW VOLTAGE AS PER CODE. | $1,000 | Feb 6, 2024 |
| COM2024 | INSTALL (1) 50000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP, (16) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 50000 BTU FUEL-BURNING EQUIP AS PER CODE. | $2,000 | Jan 31, 2024 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 9, 2026 · 91 m · 733 LYNDHURST ST
- violation: HCD-Sanitation PropertyJul 9, 2026 · 103 m · 3806 CRANSTON AVE
- violation: HCD-Sanitation PropertyJul 9, 2026 · 107 m · 3804 CRANSTON AVE
- violation: HCD-Sanitation PropertyJul 9, 2026 · 129 m · 4016 CRANSTON AVE
- violation: HCD-Sanitation PropertyJul 9, 2026 · 137 m · 4020 CRANSTON AVE
- violation: HCD-Sanitation PropertyJul 7, 2026 · 39 m · 3909 WOODRIDGE RD
- violation: SW-Dirty AlleyJul 7, 2026 · 56 m · 3917 WOODRIDGE RD
- violation: HCD-Sanitation PropertyJul 6, 2026 · 50 m · 830 LYNDHURST ST
- violation: HCD-Sanitation PropertyJul 6, 2026 · 69 m · 836 LYNDHURST ST
- violation: HCD-Sanitation PropertyJul 1, 2026 · 148 m · 4017 CRANSTON AVE
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.