Baltimore City · 21217

610 N FULTON AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$21,000
Land use
Residential (R)
Year built
1920
Last sale
Nov 14, 2025

Assessment

OwnerALFREDO PROPERTIES LLC
Land useResidential (R)
Total assessment$21,000 (cycle 2026)
Last saleNov 14, 2025 — $75,000
Year built1920
ZoningR-8
Vacant

Permits

4
TypeDescriptionCostIssued
BRCMGAS TEST.$5,000Jun 5, 2026
BRCM200 AMPS SERVICE,10 CICUITS 25 FIXTURES, 9 PLUMBING FIXTURES, WATER AND WASTE INTERIOR RECONTRUCTIONS, 2.5 HEAT PUMP DUCT WORK$5,000Feb 28, 2026
BRCMBuilding Permit Application 1. General Scope This project consists of the full interior renovation of all levels of the residence located at 610 N Fulton Ave. The scope includes architectural reconfiguration, interior wall construction, new room layouts, and replacement of most windows and doors. All plumbing, electrical, mechanical, and HVAC work will be submitted under separate trade permits as required. ________________________________________ 2. Staircase Modification The existing interior staircase will be removed and relocated to a new approved position. All required framing adjustments will be completed while maintaining the integrity of the primary structural elements. ________________________________________ 3. Basement Level • The basement will remain mostly open concept. • A mechanical room will be constructed. • New 4-inch exterior/interior walls will be installed as required. • Wall assemblies will consist of: o 2x4 studs o ½” gypsum board No primary structural components will be altered. ________________________________________ 4. First Floor (Main Level) The first floor layout includes: • Living room • Dining room • Half bathroom • Kitchen Wall construction: • Perimeter walls will be built using 4-inch assemblies, consisting of: o 2x4 wood studs o ½” gypsum board • Any intermediate interior partitions will be constructed using 4.5-inch assemblies, consisting of: o 2x4 studs o ½” gypsum board on both sides All finishes, cabinetry, flooring, and trim will be upgraded throughout the level. ________________________________________ 5. Second Floor The second level includes the following proposed layout: • Master bedroom with: o Walk-in closet o Full private bathroom • Two additional bedrooms, each with its own closet • One shared full bathroom for these two rooms Additional work: • A new window will be added on the rear façade, providing natural light to one of the proposed bedrooms. • All intermediate partitions will be constructed with 4.5-inch wall assemblies (2x4 studs + ½” gypsum board on both sides). ________________________________________ 6. Third Floor The third level includes: • Two bedrooms with closets • One full bathroom • Laundry area All interior partitions will be built using 4.5-inch assemblies (2x4 studs + ½” gypsum board). ________________________________________ 7. Windows and Doors Most existing windows and doors throughout the property will be removed and replaced with new units of matching dimensions and compliant with current building codes. ________________________________________ 8. Compliance All materials, assemblies, and methods will comply with the applicable sections of the Baltimore City Building Code, IRC, and all other relevant standards. No structural beams, load-bearing exterior walls, or primary structural elements will be removed as part of this renovation.$85,000Jan 2, 2026
BRCMThis project involves the selective demolition of the affected structure, including the removal of damaged beams on the roof and mezzanines, ensuring the stability of adjacent structures; the elimination of all internal and external doors, including hardware and accessories; and the removal of existing windows in This project involves the selective demolition of the affected structure, including the removal of damaged beams on the roof and mezzanines, ensuring the stability of adjacent structures; the elimination of all internal and external doors, including hardware and accessories; and the removal of existing windows in conditions that may impact site safety. Additionally, disassembly and removal of damaged structural and non-structural elements will be carried out in compliance with current safety and environmental regulations, with proper final disposal of the demolished materials. All work will be performed following best practices for safety, environmental protection, and in accordance with relevant technical standards and regulations.conditions that may impact site safety. Additionally, disassembly and removal of damaged structural and non-structural elements will be carried out in compliance with current safety and environmental regulations, with proper final disposal of the demolished materials. All work will be performed following best practices for safety, environmental protection, and in accordance with relevant technical standards and regulations.$7,500Nov 17, 2025

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.