Baltimore City · 21229
802 N HILTON ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $22,700
- Land use
- Residential (R)
- Year built
- 1919
- Last sale
- Oct 16, 2019
Assessment
| Owner | GATEROAD LLC |
|---|---|
| Land use | Residential (R) |
| Total assessment | $22,700 (cycle 2026) |
| Last sale | Oct 16, 2019 — $2,500 |
| Year built | 1919 |
| Zoning | R-7 |
| Vacant | — |
Permits
11| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2021 | USE AS A SINGLE-FAMILY DWELLING. | — | Nov 26, 2021 |
| COM2021 | Extend Original Permit.(original permit:COM2021-62531:INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.) Original Permit Description:(COM2021-62531) INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | — | Nov 10, 2021 |
| COM2021 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2020-77793:INSTALL (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.) AS PER CODE.) Original Permit Description:(COM2020-77793) INSTALL (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.) AS PER CODE. | — | Oct 11, 2021 |
| COM2021 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-51066:INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.) Original Permit Description:(COM2021-51066) INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | — | Sep 23, 2021 |
| COM2021 | Extend Original Permit.(original permit:COM2020-61603:SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): DEMO BURNED DRYWALL AND REMOVAL OF ALL ASSOCIATED DEBRIS, REFRAME REAR WALLS WITH ROTTED STUDS, FRAME A SMALL CLOSET IN 2 BEDROOMS, LEVEL 1ST FLOOR CEILING, ADD BLOCKING TO KITCHEN WALLS FOR CABINETRY, REFRAME CASED OPENING IN LIVING ROOM, FRAME BULKHEAD AND CHUTE FOR HVAC DUCTING, INSTALL NEW FINISHES, REPLACE WINDOWS AND DOORS (IN THE SAME SIZE AND LOCATION), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK ) Original Permit Description:(COM2020-61603) SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): DEMO BURNED DRYWALL AND REMOVAL OF ALL ASSOCIATED DEBRIS, REFRAME REAR WALLS WITH ROTTED STUDS, FRAME A SMALL CLOSET IN 2 BEDROOMS, LEVEL 1ST FLOOR CEILING, ADD BLOCKING TO KITCHEN WALLS FOR CABINETRY, REFRAME CASED OPENING IN LIVING ROOM, FRAME BULKHEAD AND CHUTE FOR HVAC DUCTING, INSTALL NEW FINISHES, REPLACE WINDOWS AND DOORS (IN THE SAME SIZE AND LOCATION), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | — | Jun 10, 2021 |
| COM2021 | INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $2,500 | Apr 24, 2021 |
| COM2021 | INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $4,500 | Jan 12, 2021 |
| COM2020 | INSTALL (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.) AS PER CODE. | $1,500 | Sep 17, 2020 |
| COM2020 | INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (7) # DISTRIBUTION SYSTEM, RECONSTRUCTION ( # DIFFUSERS), (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $6,000 | Jun 16, 2020 |
| COM2020 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): DEMO BURNED DRYWALL AND REMOVAL OF ALL ASSOCIATED DEBRIS, REFRAME REAR WALLS WITH ROTTED STUDS, FRAME A SMALL CLOSET IN 2 BEDROOMS, LEVEL 1ST FLOOR CEILING, ADD BLOCKING TO KITCHEN WALLS FOR CABINETRY, REFRAME CASED OPENING IN LIVING ROOM, FRAME BULKHEAD AND CHUTE FOR HVAC DUCTING, INSTALL NEW FINISHES, REPLACE WINDOWS AND DOORS (IN THE SAME SIZE AND LOCATION), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | $20,000 | May 26, 2020 |
| COM2019 | scope of work: interior alterations to include: interior demolition (category i): demo damaged drywall, kitchen cabs, trim, flooring and removal of all associated debris. all work will be done according to baltimore city code. demo only, separate permit will be pulled for interior renovations. | $5,000 | Nov 29, 2019 |
Violations
1| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | PM 305.2.2 | P | $50 | $0 | Jul 29, 2025 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-HGWJul 9, 2026 · 148 m · 755 LINNARD ST
- violation: HCD-Sanitation PropertyJul 8, 2026 · 148 m · 755 LINNARD ST
- violation: HCD-Sanitation PropertyJul 4, 2026 · 97 m · 731 N EDGEWOOD ST
- permit: BRCMJul 1, 2026 · 66 m · 715 DENISON ST
- violation: SW-Dirty AlleyJun 28, 2026 · 6 m · 800 N HILTON ST
- permit: BRCMJun 28, 2026 · 83 m · 707 DENISON ST
- violation: SW-HGWJun 26, 2026 · 139 m · 715 N EDGEWOOD ST
- violation: HCD-Sanitation PropertyJun 25, 2026 · 77 m
- violation: PM 305.2.2Jun 25, 2026 · 127 m · 719 N EDGEWOOD ST
- violation: HCD-Sanitation PropertyJun 25, 2026 · 142 m · 622 N HILTON ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.