Baltimore City · 21216
3004 BELMONT AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $9,000
- Land use
- Residential (R)
- Year built
- 1918
- Last sale
- Jul 23, 2025
Assessment
| Owner | AMERICAN DYNAMICS, LLC |
|---|---|
| Land use | Residential (R) |
| Total assessment | $9,000 (cycle 2026) |
| Last sale | Jul 23, 2025 |
| Year built | 1918 |
| Zoning | R-6 |
| Vacant | Yes |
Permits
6| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | MINOR DEMOLITION, NON-STRUCTURAL WALLS, DRYWALL, FIXTURES, TRIM, KITCHEN CABINETS, BATHROOM VANITIES, FLOORING & CARPET REMOVAL ALL ASSOCIATED DEBRIS WILL BE TAKEN OFF SITE, AS PER CODE. PERMIT IS FOR INTERIOR DEMOLITION ONLY. SEPARATE PERMITS WILL BE PULLED FOR ADDITIONAL WORK WHEN READY. | $1,500 | May 15, 2025 |
| COM2024 | SCOPE OF WORK: MINOR DEMOLITION, NON-STRUCTURAL WALLS, DRYWALL, FIXTURES, TRIM, KITCHEN CABINETS, BATHROOM VANITIES, FLOORING & CARPET REMOVAL. ALL ASSOCIATED DEBRIS WILL BE TAKEN OFF SITE. AS PER CODE PERMIT IS FOR INTERIOR DEMOLITION ONLY. SEPARATE PERMITS WILL BE PULLED FOR ADDITIONAL WORK WHEN READY. | $2,500 | Oct 1, 2024 |
| COM2024 | INSTALL (15) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION, NEW INTERIOR, (1) # WATER SERVICE PIPE, NEW INTERIOR AS PER CODE. | $6,500 | Jun 18, 2024 |
| COM2024 | INSTALL 3 INCH CORRUGATED PIPE WITH FABRIC MESH SLEEVE TO PERIMETER OF BASEMENT COVERED WITH #57 GRAVEL. INSTALL DIMPLE BOARD ALSO FOR WATER PROOFING. ALL WORK UP TO CODE. AS PER CODE. | $2,500 | Jun 7, 2024 |
| COM2024 | DEMO AND REMOVE EXISTING KITCHEN AND BATHROOMS. REMOVE EXISTING DAMAGED PLASTER AND SHEETROCK. REMOVE DAMAGED AND INSECT INFESTED STUDS. NO STRUCTURAL ALTERATION TO BE DONE. AS PER CODE. | $2,000 | Feb 26, 2024 |
| COM2023 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: REMOVE & REPLACE ROTTEN WOOD SAME SIZE & LOCATION (NO STRUCTURAL ALTERATIONS TO BE DONE TO THE PORCH): RAILING SYSTEM WILL BE MINIMUM HEIGHT: 36'', MAXIMUM SPACING: 4''. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. | $450 | May 22, 2023 |
Violations
2| Kind | Category | Status | Date |
|---|---|---|---|
| service_request | HCD-Illegal Dumping | Closed (Transferred) | Apr 20, 2026 |
| vacant_building_notice | Vacant | open | Nov 15, 2019 |
Inspections
1| Type | Status |
|---|---|
| InitialECB | OPEN |
Nearby recent activity
- violation: SW-Dirty AlleyJul 9, 2026 · 59 m
- violation: SW-HGWJul 8, 2026 · 121 m · 1409 BLOOMINGDALE RD
- violation: SW-HGWJul 6, 2026 · 81 m · 3019 PRESSTMAN ST
- violation: HCD-Maintenance StructureJul 6, 2026 · 111 m · 1405 N ROSEDALE ST
- violation: 13 4-5A.2Jul 6, 2026 · 147 m · 2901 PRESSTMAN ST
- violation: SW-HGWJul 1, 2026 · 120 m · 1407 BLOOMINGDALE RD
- violation: SW-HGWJul 1, 2026 · 123 m · 2904 BELMONT AVE
- violation: SW-HGWJul 1, 2026 · 133 m · 2900 BELMONT AVE
- violation: SW-HGWJul 1, 2026 · 134 m
- violation: SW-HGWJul 1, 2026 · 145 m · 2903 PRESSTMAN ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.