Baltimore City · 21223

13 S CAREY ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$60,000
Land use
Residential (R)
Year built
1900
Last sale
Dec 23, 2025

Assessment

OwnerGUZARO, FRANCISO EDGAR DE PAZ
Land useResidential (R)
Total assessment$60,000 (cycle 2026)
Last saleDec 23, 2025 — $32,500
Year built1900
ZoningR-8
Vacant

Permits

3
TypeDescriptionCostIssued
BRCM200 AMPS SERVICE 10 CIRCUITS 25 FIXTURES, 9 PLUMBING FIXTURES WATER AND WASTE INTERIOR RECONSTRUCTION, 2.5 HEAT PUMP DUCT WORK.$5,000May 19, 2026
BRCMSCOPE OF WORK: -------- INTERIOR/EXTERIOR ALTERATIONS -------- - REPLACE 3 EXTERIOR DOOR, REPLACE 7 WINDOWS (same size and locations), REPLACE FLOORING/ KITCHEN CABINETS. - RELOCATE STAIRS AND COMPLETE INTERIOR FRAMING. - REPLACE DAMAGE JOISTS AND DAMAGE EXTERIOR 2X4 WOOD STUDS. - PAINT INTERIOR AS NEEDED, REPLACE PANELING AND INSTALL DRYWALL AS NEEDED. --------- EXTERIOR ALTERATIONS --------- - REPLACE ROOFING. REPLACE ROOFING DAMAGE TRUSES AS NEEDED. ADD REAR ADDITION AS PER CODE AND AS PER PLANS, REPAIR REAR AND FRONT RAILING REPAIR REAR SIDING - AS PER THE DEPARTMENT OF PLANNING: REPLACEMENT WINDOWS SHALL COMPLY WITH REGULATIONS ON PAGE 21 OF THE BROADWAY EAST URBAN RENEWAL PLAN AND THE SIZE OF THE WINDOW AND DOOR OPENINGS SHALL NOT BE ALTERED OR REDUCED IN SIZE IN ANY WAY "ALL WINDOWS MUST BE TIGHT FITTING AND HAVE SASHES. AS PER PLANS AND AS PER CODE. ********* 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7'. 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36". 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT. 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) ********** ********* SEPARATE PERMITS WILL BE PULLED FOR MEP WORK. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance Comments Approved as per CHAP Authorization to Proceed. Complete the following scope of work at the front façade: At the 1st floor, replace the door with a 4-panel wood door with Baltimore bullnose trim. Replace windows at 1st, 2nd, and 3rd floors with 4/4 wood or aluminum clad wood windows with Baltimore bullnose trim. Doors and windows to fit the existing masonry openings without additional framing or filler. At the roofline, install metal half-round gutter and replace downspout with a full-round metal downspout to match existing. Install one black exterior lantern sconce adjacent to the main entryway. Door to be painted with Sherwin Williams SW6258 – Tricorn Black. Gutters, downspouts, windows, and windows trim with Sherwin Williams SW7005 – Pure White. Complete the following scope of work at the side elevation: At the 2nd floor, replace the window with one white 1/1 double hung window. Vinyl window should not be wrapped in metal after installation. Window to fit the existing masonry openings with no additional framing or filler. Complete the following scope of work at the rear elevation: At the 1st floor, replace the door with one 6-panel fiberglass door. At the 2nd floor, replace the window with one white 1/1 double hung window. Door and windows to fit the existing masonry openings with no additional framing or filler. At the 3rd floor, construct one (10’ x 11’), vertical addition with two white 1/1 double hung windows facing the alley and clad with cementitious smooth-lap horizontal siding. Vinyl windows should not be wrapped in metal after installation. Install one black exterior lantern sconce adjacent to the main entryway. At grade, level, re-grade, and repair concrete pad with concrete to match existing. Cementitious smooth-lap horizontal siding to be painted with Sherwin Williams SW0055 – Light French Gray. Complete the following work at the roof: Install new roof torch-down modified bitumen roofing membrane at the main block and new addition to match existing. All work to be completed as per information/plans/specs in CHAP files except where this ATP supersedes.$50,000Mar 14, 2026
BRCMThis Project consists of Category I- Interior / Non-Structural demolition work. The scope includes Removal of debris and deteriorated interior materials. Removal of non-load-bearing partitions, finishes, flooring, trim and non-structural elements. Cleaning of interior spaces and removal of hazardous loose materials. The exterior envelope of the building will remain intact; all work will be executed in compliance with BALTIMORE CITY CODE.$5,000Dec 1, 2025

Violations

3
KindCategoryStatusFineBalanceDate
service_requestHCD-CCE Building Permit ComplaintClosedJun 10, 2026
citationBC 123.8.1P$1,000$0May 6, 2024
citationBC 123.8.1P$1,000$0Jan 11, 2024

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.