Baltimore City · 21223
1623 FREDERICK AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $74,800
- Land use
- Residential (R)
- Year built
- 1860
- Last sale
- Jun 27, 2023
Assessment
| Owner | AZZA INVESTMENT, LLC |
|---|---|
| Land use | Residential (R) |
| Total assessment | $74,800 (cycle 2026) |
| Last sale | Jun 27, 2023 |
| Year built | 1860 |
| Zoning | R-8 |
| Vacant | Yes |
Permits
13| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2023 | Extend Original Permit.(original permit:COM2019-73825:PER CHAP: ATP: UNION SQUARE - APPROVED AS PER CHAP ATP: AT FRONT: REBUILD FIRST FLOOR STOREFRONT IN CEMENT BOARD PAINTED GRAY AND WHITE TRIM DETAILING WITH TRANSOMS ABOVE STOREFRONT WINDOWS RETAINING AND REPAIRING EXISTING STOREFRONT CORNICE; INSTALL NEW WOOD SINGLE LIGHT ENTRY DOOR WITH TRANSOM; INSTALL SIX NEW ONE-OVER-ONE JELD WEN WOOD WINDOWS WITH BALTIMORE BULLNOSE TRIM AT SECOND AND THIRD FLOORS TO FIT ORIGINAL OPENINGS; REPAIR/REPLACE WINDOW SILLS AS NEEDED; REMOVE PAINT FROM MASONRY; REPOINT/REPAIR MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COMPOSITION, TEXTURE, COLOR, TOOLING AND MORTAR JOINT WIDTH; RETAIN AND REPAIR ROOFTOP CORNICE. AT REAR: RECONSTRUCT REAR WALL; INSTALL HALF-LITE DOORS AT SECOND FLOOR AND THIRD FLOOR; INSTALL FOUR VINYL ONE-OVER-ONE WINDOWS AT SECOND AND THIRD FLOORS; CONSTRUCT WOOD DECKS WITH RAILINGS ACROSS WIDTH OF BUILDING AT SECOND AND THIRD FLOORS; INSTALL K-STYLE GUTTER AND DOWNSPOUTS; APPLY STUCCO TO REAR WALL. AT ROOF: REPLACE/REBUILD ROOF FRAMING AND INSTALL NEW RUBBER ROOF. AT GARAGE: INSTALL NEW JELD WEN NO. 5 CARRIAGE STYLE GARAGE DOOR WITH WINDOW. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ALL INTERIOR FIXTURES, FITTINGS, FINISHES, AND FRAMING WILL BE REMOVED. WE WILL REFRAME THE BUILDING USING 2X12 MICROLAM LVL BEAM JOIST, WITH MIDSPAN BLOCKING. ALL OF THE WALLS WILL BE FRAMED USING 2X4 WOOD FRAMING, WITH R-21 INSULATION. WE WILL REPLACE THE STAIR WITH A CODE COMPLIANT STAIR WITH TREADS THAT ARE 11'' IN DEPTH AND RISERS THAT 7-3/4''. ) Original Permit Description:(COM2019-73825) PER CHAP: ATP: UNION SQUARE - APPROVED AS PER CHAP ATP: AT FRONT: REBUILD FIRST FLOOR STOREFRONT IN CEMENT BOARD PAINTED GRAY AND WHITE TRIM DETAILING WITH TRANSOMS ABOVE STOREFRONT WINDOWS RETAINING AND REPAIRING EXISTING STOREFRONT CORNICE; INSTALL NEW WOOD SINGLE LIGHT ENTRY DOOR WITH TRANSOM; INSTALL SIX NEW ONE-OVER-ONE JELD WEN WOOD WINDOWS WITH BALTIMORE BULLNOSE TRIM AT SECOND AND THIRD FLOORS TO FIT ORIGINAL OPENINGS; REPAIR/REPLACE WINDOW SILLS AS NEEDED; REMOVE PAINT FROM MASONRY; REPOINT/REPAIR MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COMPOSITION, TEXTURE, COLOR, TOOLING AND MORTAR JOINT WIDTH; RETAIN AND REPAIR ROOFTOP CORNICE. AT REAR: RECONSTRUCT REAR WALL; INSTALL HALF-LITE DOORS AT SECOND FLOOR AND THIRD FLOOR; INSTALL FOUR VINYL ONE-OVER-ONE WINDOWS AT SECOND AND THIRD FLOORS; CONSTRUCT WOOD DECKS WITH RAILINGS ACROSS WIDTH OF BUILDING AT SECOND AND THIRD FLOORS; INSTALL K-STYLE GUTTER AND DOWNSPOUTS; APPLY STUCCO TO REAR WALL. AT ROOF: REPLACE/REBUILD ROOF FRAMING AND INSTALL NEW RUBBER ROOF. AT GARAGE: INSTALL NEW JELD WEN NO. 5 CARRIAGE STYLE GARAGE DOOR WITH WINDOW. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ALL INTERIOR FIXTURES, FITTINGS, FINISHES, AND FRAMING WILL BE REMOVED. WE WILL REFRAME THE BUILDING USING 2X12 MICROLAM LVL BEAM JOIST, WITH MIDSPAN BLOCKING. ALL OF THE WALLS WILL BE FRAMED USING 2X4 WOOD FRAMING, WITH R-21 INSULATION. WE WILL REPLACE THE STAIR WITH A CODE COMPLIANT STAIR WITH TREADS THAT ARE 11'' IN DEPTH AND RISERS THAT 7-3/4''. | — | Jul 6, 2023 |
| COM2023 | INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (1) 200 AMPS NEW ELECTRICAL METERS, (27) # BRANCH CIRCUITS/FEEDERS , (70) # FIXTURES/DEVICES, (123) # FIXTURES/DEVICES AS PER CODE. | $15,000 | Feb 5, 2023 |
| COM2022 | AMEND PERMIT: CHANGE PRIME CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-73825:PER CHAP: ATP: UNION SQUARE - APPROVED AS PER CHAP ATP: AT FRONT: REBUILD FIRST FLOOR STOREFRONT IN CEMENT BOARD PAINTED GRAY AND WHITE TRIM DETAILING WITH TRANSOMS ABOVE STOREFRONT WINDOWS RETAINING AND REPAIRING EXISTING STOREFRONT CORNICE; INSTALL NEW WOOD SINGLE LIGHT ENTRY DOOR WITH TRANSOM; INSTALL SIX NEW ONE-OVER-ONE JELD WEN WOOD WINDOWS WITH BALTIMORE BULLNOSE TRIM AT SECOND AND THIRD FLOORS TO FIT ORIGINAL OPENINGS; REPAIR/REPLACE WINDOW SILLS AS NEEDED; REMOVE PAINT FROM MASONRY; REPOINT/REPAIR MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COMPOSITION, TEXTURE, COLOR, TOOLING AND MORTAR JOINT WIDTH; RETAIN AND REPAIR ROOFTOP CORNICE. AT REAR: RECONSTRUCT REAR WALL; INSTALL HALF-LITE DOORS AT SECOND FLOOR AND THIRD FLOOR; INSTALL FOUR VINYL ONE-OVER-ONE WINDOWS AT SECOND AND THIRD FLOORS; CONSTRUCT WOOD DECKS WITH RAILINGS ACROSS WIDTH OF BUILDING AT SECOND AND THIRD FLOORS; INSTALL K-STYLE GUTTER AND DOWNSPOUTS; APPLY STUCCO TO REAR WALL. AT ROOF: REPLACE/REBUILD ROOF FRAMING AND INSTALL NEW RUBBER ROOF. AT GARAGE: INSTALL NEW JELD WEN NO. 5 CARRIAGE STYLE GARAGE DOOR WITH WINDOW. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ALL INTERIOR FIXTURES, FITTINGS, FINISHES, AND FRAMING WILL BE REMOVED. WE WILL REFRAME THE BUILDING USING 2X12 MICROLAM LVL BEAM JOIST, WITH MIDSPAN BLOCKING. ALL OF THE WALLS WILL BE FRAMED USING 2X4 WOOD FRAMING, WITH R-21 INSULATION. WE WILL REPLACE THE STAIR WITH A CODE COMPLIANT STAIR WITH TREADS THAT ARE 11'' IN DEPTH AND RISERS THAT 7-3/4''. ) Original Permit Description:(COM2019-73825) PER CHAP: ATP: UNION SQUARE - APPROVED AS PER CHAP ATP: AT FRONT: REBUILD FIRST FLOOR STOREFRONT IN CEMENT BOARD PAINTED GRAY AND WHITE TRIM DETAILING WITH TRANSOMS ABOVE STOREFRONT WINDOWS RETAINING AND REPAIRING EXISTING STOREFRONT CORNICE; INSTALL NEW WOOD SINGLE LIGHT ENTRY DOOR WITH TRANSOM; INSTALL SIX NEW ONE-OVER-ONE JELD WEN WOOD WINDOWS WITH BALTIMORE BULLNOSE TRIM AT SECOND AND THIRD FLOORS TO FIT ORIGINAL OPENINGS; REPAIR/REPLACE WINDOW SILLS AS NEEDED; REMOVE PAINT FROM MASONRY; REPOINT/REPAIR MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COMPOSITION, TEXTURE, COLOR, TOOLING AND MORTAR JOINT WIDTH; RETAIN AND REPAIR ROOFTOP CORNICE. AT REAR: RECONSTRUCT REAR WALL; INSTALL HALF-LITE DOORS AT SECOND FLOOR AND THIRD FLOOR; INSTALL FOUR VINYL ONE-OVER-ONE WINDOWS AT SECOND AND THIRD FLOORS; CONSTRUCT WOOD DECKS WITH RAILINGS ACROSS WIDTH OF BUILDING AT SECOND AND THIRD FLOORS; INSTALL K-STYLE GUTTER AND DOWNSPOUTS; APPLY STUCCO TO REAR WALL. AT ROOF: REPLACE/REBUILD ROOF FRAMING AND INSTALL NEW RUBBER ROOF. AT GARAGE: INSTALL NEW JELD WEN NO. 5 CARRIAGE STYLE GARAGE DOOR WITH WINDOW. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ALL INTERIOR FIXTURES, FITTINGS, FINISHES, AND FRAMING WILL BE REMOVED. WE WILL REFRAME THE BUILDING USING 2X12 MICROLAM LVL BEAM JOIST, WITH MIDSPAN BLOCKING. ALL OF THE WALLS WILL BE FRAMED USING 2X4 WOOD FRAMING, WITH R-21 INSULATION. WE WILL REPLACE THE STAIR WITH A CODE COMPLIANT STAIR WITH TREADS THAT ARE 11'' IN DEPTH AND RISERS THAT 7-3/4''. | — | Dec 28, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2019-73825:PER CHAP: ATP: UNION SQUARE - APPROVED AS PER CHAP ATP: AT FRONT: REBUILD FIRST FLOOR STOREFRONT IN CEMENT BOARD PAINTED GRAY AND WHITE TRIM DETAILING WITH TRANSOMS ABOVE STOREFRONT WINDOWS RETAINING AND REPAIRING EXISTING STOREFRONT CORNICE; INSTALL NEW WOOD SINGLE LIGHT ENTRY DOOR WITH TRANSOM; INSTALL SIX NEW ONE-OVER-ONE JELD WEN WOOD WINDOWS WITH BALTIMORE BULLNOSE TRIM AT SECOND AND THIRD FLOORS TO FIT ORIGINAL OPENINGS; REPAIR/REPLACE WINDOW SILLS AS NEEDED; REMOVE PAINT FROM MASONRY; REPOINT/REPAIR MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COMPOSITION, TEXTURE, COLOR, TOOLING AND MORTAR JOINT WIDTH; RETAIN AND REPAIR ROOFTOP CORNICE. AT REAR: RECONSTRUCT REAR WALL; INSTALL HALF-LITE DOORS AT SECOND FLOOR AND THIRD FLOOR; INSTALL FOUR VINYL ONE-OVER-ONE WINDOWS AT SECOND AND THIRD FLOORS; CONSTRUCT WOOD DECKS WITH RAILINGS ACROSS WIDTH OF BUILDING AT SECOND AND THIRD FLOORS; INSTALL K-STYLE GUTTER AND DOWNSPOUTS; APPLY STUCCO TO REAR WALL. AT ROOF: REPLACE/REBUILD ROOF FRAMING AND INSTALL NEW RUBBER ROOF. AT GARAGE: INSTALL NEW JELD WEN NO. 5 CARRIAGE STYLE GARAGE DOOR WITH WINDOW. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ALL INTERIOR FIXTURES, FITTINGS, FINISHES, AND FRAMING WILL BE REMOVED. WE WILL REFRAME THE BUILDING USING 2X12 MICROLAM LVL BEAM JOIST, WITH MIDSPAN BLOCKING. ALL OF THE WALLS WILL BE FRAMED USING 2X4 WOOD FRAMING, WITH R-21 INSULATION. WE WILL REPLACE THE STAIR WITH A CODE COMPLIANT STAIR WITH TREADS THAT ARE 11'' IN DEPTH AND RISERS THAT 7-3/4''. ) Original Permit Description:(COM2019-73825) PER CHAP: ATP: UNION SQUARE - APPROVED AS PER CHAP ATP: AT FRONT: REBUILD FIRST FLOOR STOREFRONT IN CEMENT BOARD PAINTED GRAY AND WHITE TRIM DETAILING WITH TRANSOMS ABOVE STOREFRONT WINDOWS RETAINING AND REPAIRING EXISTING STOREFRONT CORNICE; INSTALL NEW WOOD SINGLE LIGHT ENTRY DOOR WITH TRANSOM; INSTALL SIX NEW ONE-OVER-ONE JELD WEN WOOD WINDOWS WITH BALTIMORE BULLNOSE TRIM AT SECOND AND THIRD FLOORS TO FIT ORIGINAL OPENINGS; REPAIR/REPLACE WINDOW SILLS AS NEEDED; REMOVE PAINT FROM MASONRY; REPOINT/REPAIR MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COMPOSITION, TEXTURE, COLOR, TOOLING AND MORTAR JOINT WIDTH; RETAIN AND REPAIR ROOFTOP CORNICE. AT REAR: RECONSTRUCT REAR WALL; INSTALL HALF-LITE DOORS AT SECOND FLOOR AND THIRD FLOOR; INSTALL FOUR VINYL ONE-OVER-ONE WINDOWS AT SECOND AND THIRD FLOORS; CONSTRUCT WOOD DECKS WITH RAILINGS ACROSS WIDTH OF BUILDING AT SECOND AND THIRD FLOORS; INSTALL K-STYLE GUTTER AND DOWNSPOUTS; APPLY STUCCO TO REAR WALL. AT ROOF: REPLACE/REBUILD ROOF FRAMING AND INSTALL NEW RUBBER ROOF. AT GARAGE: INSTALL NEW JELD WEN NO. 5 CARRIAGE STYLE GARAGE DOOR WITH WINDOW. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ALL INTERIOR FIXTURES, FITTINGS, FINISHES, AND FRAMING WILL BE REMOVED. WE WILL REFRAME THE BUILDING USING 2X12 MICROLAM LVL BEAM JOIST, WITH MIDSPAN BLOCKING. ALL OF THE WALLS WILL BE FRAMED USING 2X4 WOOD FRAMING, WITH R-21 INSULATION. WE WILL REPLACE THE STAIR WITH A CODE COMPLIANT STAIR WITH TREADS THAT ARE 11'' IN DEPTH AND RISERS THAT 7-3/4''. | — | Apr 26, 2022 |
| COM2022 | INSTALL (2) 100000 BTU AIR-CON SYSTEM, HEAT PUMP AS PER CODE. | $8,000 | Apr 14, 2022 |
| COM2022 | INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP AS PER CODE. | $8,000 | Apr 6, 2022 |
| COM2022 | INSTALL (12) # PLUMBING FIXTURES, (1) 48000 BTU FUEL-BURNING EQUIP, (1) 80000 BTU FUEL-BURNING EQUIP, (1) 200000 BTU FUEL-BURNING EQUIP, (1) BTU GAS PIPEING, (1) # GAS TEST AS PER CODE. | $16,000 | Mar 31, 2022 |
| COM2022 | INSTALL (19) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (1) 200 AMPS ENLARGE ELECTRICAL METERS, (105) # FIXTURES/DEVICES AS PER CODE. | $2,500 | Mar 5, 2022 |
| COM2021 | AA CONV: Full Description Loaded as Comment | — | Oct 20, 2021 |
| COM2021 | INSTALL (11) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER AS PER CODE. | $20,000 | May 17, 2021 |
| COM2021 | INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (137) # FIXTURES/DEVICES AS PER CODE. | $7,500 | Apr 22, 2021 |
| COM2021 | Extend Original Permit.(original permit:COM2019-73825:PER CHAP: ATP: UNION SQUARE - APPROVED AS PER CHAP ATP: AT FRONT: REBUILD FIRST FLOOR STOREFRONT IN CEMENT BOARD PAINTED GRAY AND WHITE TRIM DETAILING WITH TRANSOMS ABOVE STOREFRONT WINDOWS RETAINING AND REPAIRING EXISTING STOREFRONT CORNICE; INSTALL NEW WOOD SINGLE LIGHT ENTRY DOOR WITH TRANSOM; INSTALL SIX NEW ONE-OVER-ONE JELD WEN WOOD WINDOWS WITH BALTIMORE BULLNOSE TRIM AT SECOND AND THIRD FLOORS TO FIT ORIGINAL OPENINGS; REPAIR/REPLACE WINDOW SILLS AS NEEDED; REMOVE PAINT FROM MASONRY; REPOINT/REPAIR MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COMPOSITION, TEXTURE, COLOR, TOOLING AND MORTAR JOINT WIDTH; RETAIN AND REPAIR ROOFTOP CORNICE. AT REAR: RECONSTRUCT REAR WALL; INSTALL HALF-LITE DOORS AT SECOND FLOOR AND THIRD FLOOR; INSTALL FOUR VINYL ONE-OVER-ONE WINDOWS AT SECOND AND THIRD FLOORS; CONSTRUCT WOOD DECKS WITH RAILINGS ACROSS WIDTH OF BUILDING AT SECOND AND THIRD FLOORS; INSTALL K-STYLE GUTTER AND DOWNSPOUTS; APPLY STUCCO TO REAR WALL. AT ROOF: REPLACE/REBUILD ROOF FRAMING AND INSTALL NEW RUBBER ROOF. AT GARAGE: INSTALL NEW JELD WEN NO. 5 CARRIAGE STYLE GARAGE DOOR WITH WINDOW. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ALL INTERIOR FIXTURES, FITTINGS, FINISHES, AND FRAMING WILL BE REMOVED. WE WILL REFRAME THE BUILDING USING 2X12 MICROLAM LVL BEAM JOIST, WITH MIDSPAN BLOCKING. ALL OF THE WALLS WILL BE FRAMED USING 2X4 WOOD FRAMING, WITH R-21 INSULATION. WE WILL REPLACE THE STAIR WITH A CODE COMPLIANT STAIR WITH TREADS THAT ARE 11'' IN DEPTH AND RISERS THAT 7-3/4''. ) Original Permit Description:(COM2019-73825) PER CHAP: ATP: UNION SQUARE - APPROVED AS PER CHAP ATP: AT FRONT: REBUILD FIRST FLOOR STOREFRONT IN CEMENT BOARD PAINTED GRAY AND WHITE TRIM DETAILING WITH TRANSOMS ABOVE STOREFRONT WINDOWS RETAINING AND REPAIRING EXISTING STOREFRONT CORNICE; INSTALL NEW WOOD SINGLE LIGHT ENTRY DOOR WITH TRANSOM; INSTALL SIX NEW ONE-OVER-ONE JELD WEN WOOD WINDOWS WITH BALTIMORE BULLNOSE TRIM AT SECOND AND THIRD FLOORS TO FIT ORIGINAL OPENINGS; REPAIR/REPLACE WINDOW SILLS AS NEEDED; REMOVE PAINT FROM MASONRY; REPOINT/REPAIR MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COMPOSITION, TEXTURE, COLOR, TOOLING AND MORTAR JOINT WIDTH; RETAIN AND REPAIR ROOFTOP CORNICE. AT REAR: RECONSTRUCT REAR WALL; INSTALL HALF-LITE DOORS AT SECOND FLOOR AND THIRD FLOOR; INSTALL FOUR VINYL ONE-OVER-ONE WINDOWS AT SECOND AND THIRD FLOORS; CONSTRUCT WOOD DECKS WITH RAILINGS ACROSS WIDTH OF BUILDING AT SECOND AND THIRD FLOORS; INSTALL K-STYLE GUTTER AND DOWNSPOUTS; APPLY STUCCO TO REAR WALL. AT ROOF: REPLACE/REBUILD ROOF FRAMING AND INSTALL NEW RUBBER ROOF. AT GARAGE: INSTALL NEW JELD WEN NO. 5 CARRIAGE STYLE GARAGE DOOR WITH WINDOW. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ALL INTERIOR FIXTURES, FITTINGS, FINISHES, AND FRAMING WILL BE REMOVED. WE WILL REFRAME THE BUILDING USING 2X12 MICROLAM LVL BEAM JOIST, WITH MIDSPAN BLOCKING. ALL OF THE WALLS WILL BE FRAMED USING 2X4 WOOD FRAMING, WITH R-21 INSULATION. WE WILL REPLACE THE STAIR WITH A CODE COMPLIANT STAIR WITH TREADS THAT ARE 11'' IN DEPTH AND RISERS THAT 7-3/4''. | — | Apr 19, 2021 |
| COM2019 | PER CHAP: ATP: UNION SQUARE - APPROVED AS PER CHAP ATP: AT FRONT: REBUILD FIRST FLOOR STOREFRONT IN CEMENT BOARD PAINTED GRAY AND WHITE TRIM DETAILING WITH TRANSOMS ABOVE STOREFRONT WINDOWS RETAINING AND REPAIRING EXISTING STOREFRONT CORNICE; INSTALL NEW WOOD SINGLE LIGHT ENTRY DOOR WITH TRANSOM; INSTALL SIX NEW ONE-OVER-ONE JELD WEN WOOD WINDOWS WITH BALTIMORE BULLNOSE TRIM AT SECOND AND THIRD FLOORS TO FIT ORIGINAL OPENINGS; REPAIR/REPLACE WINDOW SILLS AS NEEDED; REMOVE PAINT FROM MASONRY; REPOINT/REPAIR MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COMPOSITION, TEXTURE, COLOR, TOOLING AND MORTAR JOINT WIDTH; RETAIN AND REPAIR ROOFTOP CORNICE. AT REAR: RECONSTRUCT REAR WALL; INSTALL HALF-LITE DOORS AT SECOND FLOOR AND THIRD FLOOR; INSTALL FOUR VINYL ONE-OVER-ONE WINDOWS AT SECOND AND THIRD FLOORS; CONSTRUCT WOOD DECKS WITH RAILINGS ACROSS WIDTH OF BUILDING AT SECOND AND THIRD FLOORS; INSTALL K-STYLE GUTTER AND DOWNSPOUTS; APPLY STUCCO TO REAR WALL. AT ROOF: REPLACE/REBUILD ROOF FRAMING AND INSTALL NEW RUBBER ROOF. AT GARAGE: INSTALL NEW JELD WEN NO. 5 CARRIAGE STYLE GARAGE DOOR WITH WINDOW. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ALL INTERIOR FIXTURES, FITTINGS, FINISHES, AND FRAMING WILL BE REMOVED. WE WILL REFRAME THE BUILDING USING 2X12 MICROLAM LVL BEAM JOIST, WITH MIDSPAN BLOCKING. ALL OF THE WALLS WILL BE FRAMED USING 2X4 WOOD FRAMING, WITH R-21 INSULATION. WE WILL REPLACE THE STAIR WITH A CODE COMPLIANT STAIR WITH TREADS THAT ARE 11'' IN DEPTH AND RISERS THAT 7-3/4''. | $20,000 | Oct 19, 2020 |
Violations
6| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | BC 123.8.1 | O | $1,000 | $1,000 | May 20, 2026 |
| citation | BC 123.8.1 | O | $1,000 | $2,000 | Feb 23, 2026 |
| citation | BC 123.8.1 | O | $1,000 | $2,000 | Feb 25, 2025 |
| citation | BC 123.8.1 | O | $1,000 | $2,000 | Oct 4, 2024 |
| citation | BC 123.8.1 | P | $1,000 | $0 | Jan 8, 2024 |
| vacant_building_notice | Vacant | open | — | — | Dec 20, 2022 |
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 9, 2026 · 48 m · 1608 HOLLINS ST
- violation: SW-HGWJun 22, 2026 · 135 m · 1726 FREDERICK AVE
- violation: HCD-Sanitation PropertyJun 21, 2026 · 137 m · 9 N GILMOR ST
- violation: HCD-Vacant BuildingJun 18, 2026 · 110 m · 1714 W BALTIMORE ST
- violation: HCD-Illegal DumpingJun 17, 2026 · 144 m
- violation: SW-HGWJun 14, 2026 · 130 m · 5 N GILMOR ST
- violation: SW-HGWJun 14, 2026 · 134 m · 7 N GILMOR ST
- violation: HCD-Sanitation PropertyJun 14, 2026 · 135 m · 1726 FREDERICK AVE
- violation: HCD-CCE Building Permit ComplaintJun 11, 2026 · 35 m · 1626 HOLLINS ST
- violation: SW-HGWJun 10, 2026 · 136 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.