Baltimore City · 21223

1735 HOLLINS ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$82,800
Land use
Residential (R)
Year built
1870
Last sale
Apr 21, 2015

Assessment

OwnerAK INVESTMENTS LLC
Land useResidential (R)
Total assessment$82,800 (cycle 2026)
Last saleApr 21, 2015 — $51,000
Year built1870
ZoningR-8
VacantYes

Permits

15
TypeDescriptionCostIssued
BRCMInstall 3 - 200amp main breaker panels in units A, B, C basement. install 1 200amp disconnect for unit A Install 4/0 SCC & 4/0 SER cable Install rough wire 17 branch circuits in each units A, B, C basement Install 50 rough wire fixtures & devices in each unit A, B, C basement as per code.$4,500Jun 29, 2026
BRCMExterior work done per CHAP ATP, see attached ATP details. This Includes * Bricks bowing fix, lintels, * Windows and doors replacement, * Bullnose trim. * Cleaning of front steps and grafitti using gentle soap. NOTE: This is a re-issues of an older permit COM2021-01681. The work was performed a few years ago, with CHAP approval. However, the City inspection wasn't done due to covid. So we are submitting this again to have the city come and review the fixes.$10,000May 1, 2026
BRCMNSTALL (3) 24 BTU AIR-CON SYSTEM, HEAT PUMP, (3) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 50 CFM EXHAUST SYSTEMS AS PER CODE. PER CHAP: AS PER CHAP AUTHORIZATION TO PROCEED. • ALONG THE BUILDING’S RIDGELINE, PROVIDE AT THE EAST PARTY WALL THREE (3) NEW A/C CONDENSER UNITS AS REQUIRED FOR STRUCTURAL INTEGRITY AND PROPER WATERPROOFING. NEW CONDENSER UNITS TO BE SAME SIZE, COLOR, AND LOCATION AS EXISTING A/C CONDENSER UNITS. NEW A/C CONDENSER UNITS LINE SETS TO BE IN CONVENTIONAL LOCATION AND NOT HAVE ANY ELEMENT VISIBLE FROM THE STREET IN ITS ENTIRETY. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES.$5,000May 1, 2026
BRCMInstall heavy up 1- 3 stack 200amps meter housing, 3- 200amp main breaker panels in units A, B, and basement., rough wiring to code. Approved For Work Only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance.$4,500Mar 6, 2026
BCCMPlumbing for 6 bathrooms 4 kitchens 4 laundry and 4 water heaters$10,000Mar 3, 2026
BRCMWe are updating and fixing Framing in the following areas: Basement (1000 sqft) framing updates, Joists, and support beams First floor minor updates to existing framing to bring it to code 2nd floor minor updates to existing framing to bring it to code Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance.$9,000Feb 25, 2026
BCCMInstall temporary power 100 amp service$1,500Apr 8, 2025
BRCMINSTALL (3) 24 BTU AIR-CON SYSTEM, HEAT PUMP, (3) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 50 CFM EXHAUST SYSTEMS AS PER CODE. PER CHAP: AS PER CHAP AUTHORIZATION TO PROCEED. • ALONG THE BUILDING’S RIDGELINE, PROVIDE AT THE EAST PARTY WALL THREE (3) NEW A/C CONDENSER UNITS AS REQUIRED FOR STRUCTURAL INTEGRITY AND PROPER WATERPROOFING. NEW CONDENSER UNITS TO BE SAME SIZE, COLOR, AND LOCATION AS EXISTING A/C CONDENSER UNITS. NEW A/C CONDENSER UNITS LINE SETS TO BE IN CONVENTIONAL LOCATION AND NOT HAVE ANY ELEMENT VISIBLE FROM THE STREET IN ITS ENTIRETY. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance.Mar 4, 2025
COM2024REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2024-64166:SCOPE OF WORK: ----- INTERIOR ALTERATIONS ------ REPAIRING DRYWALLS WHICH HAVE AGED AND NEED TO BE REPAIRED. AS PER CODE.)Feb 15, 2025
COM2024INSTALL (3) 24 BTU AIR-CON SYSTEM, HEAT PUMP, (3) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 50 CFM EXHAUST SYSTEMS AS PER CODE. PER CHAP: AS PER CHAP AUTHORIZATION TO PROCEED. • ALONG THE BUILDING’S RIDGELINE, PROVIDE AT THE EAST PARTY WALL THREE (3) NEW A/C CONDENSER UNITS AS REQUIRED FOR STRUCTURAL INTEGRITY AND PROPER WATERPROOFING. NEW CONDENSER UNITS TO BE SAME SIZE, COLOR, AND LOCATION AS EXISTING A/C CONDENSER UNITS. NEW A/C CONDENSER UNITS LINE SETS TO BE IN CONVENTIONAL LOCATION AND NOT HAVE ANY ELEMENT VISIBLE FROM THE STREET IN ITS ENTIRETY. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES.$8,000May 28, 2024
COM2024SCOPE OF WORK: ----- INTERIOR ALTERATIONS ------ REPAIRING DRYWALLS WHICH HAVE AGED AND NEED TO BE REPAIRED. AS PER CODE.$5,000May 2, 2024
COM2021EXTERIOR WORK ONLY: ON THE FRONT FACADE, CLEAN EXISTING UNCOVERED HISTORIC BRICKS AND MARBLE SILLS USING THE GENTLEST METHODS POSSIBLE, ON THE SIDE FACADE, STRUCTURAL REPAIR OF PORTION OF EXISTING HISTORIC EXTERIOR MASONRY WALL THAT IS BOWED ON THE 2ND FLOOR, NEW WROUGHT IRON METAL RAILING TO BE INSTALLED ON THE FRONT ENTRANCE, ALL HISTORIC BRICK TO BE CLEANED USING THE GENTLEST METHODS POSSIBLE, REPOINT EXISTING UNCOVERED HISTORIC MORTAR IN ITS ENTIRETY WITH NEW MORTAR IN, REPLACE AT THE 1ST FLOOR TWO (2) EXISTING DOORS WITH NEW PAIRED WOOD DOOR APPLIED WITH BALTIMORE BULLNOSE TRIM, REPLACE AT THE BASEMENT FLOOR FOUR (4) EXISTING WINDOWS WITH NEW JELD-WEN SDL, AWNING PICTURE WOOD WINDOWS APPLIED WITH BALTIMORE BULLNOSE TRIM, ON THE 1ST, 2ND, AND 3RD FLOORS REPLACE EIGHT (8) EXISTING WINDOWS WITH NEW JELD-WEN SDL (INTERIOR AND EXTERIOR MUNTIN AND SPACER BAR), DOUBLE HUNG WOOD WINDOWS APPLIED WITH BALTIMORE BULLNOSE TRIM, ON THE SIDE FAÇADE, REPLACE AT THE 1ST, 2ND, AND 3RD FLOORS ELEVEN (11) EXISTING WINDOWS WITH NEW JELD-WEN SDL, ON THE REAR FAÇADE, RECONSTRUCT AT THE 3RD FLOOR THE EXISTING HISTORIC REAR ORIEL BAY AS REQUIRED FOR STRUCTURAL INTEGRITY AND PROPER WATERPROOFING, ON THE REAR FAÇADE, REPLACE AT THE 1ST, 2ND, AND 3RD FLOORS THREE (3) EXISTING WINDOWS WITH NEW APPROVED DOUBLE HUNG VINYL WINDOWS, ON THE REAR FAÇADE, REPLACE AT THE 4TH FLOOR THE EXISTING VINYL SIDING WITH NEW HARDIEPLANK, ALONG THE BUILDING’S RIDGELINE, REPLACE THE EXISTING RUBBER ROOFING MEMBRANE WITH NEW ROLLED RUBBER FLAT ROOF MEMBRANE, ALONG THE INTERIOR OF THE SIDE PROPERTY LINE, REPLACE THE CHAIN LINK FENCE WITH NEW 6’ HIGH VERTICAL PANELED WOOD FENCE, ON THE REAR FAÇADE, INSTALL AT THE 3RD FLOORS AND NEW ORIEL BAY TWO (2) NEW ROUND BRUSHED ALUMINUM GUTTERS AND ROUND BRUSHED ALUMINUM DOWNSPOUT, ON THE REAR FAÇADE, PROVIDE NEW PATIO, STAIRWELL, AND WALKWAY, ALONG THE BUILDING’S RIDGELINE, RESTORE THE EXISTING CHIMNEY IN ITS ENTIRETY AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR ALL WORK ON THE INTERIOR.$70,000Jun 1, 2023
BMZ2021alter interior for use as five (5) dwelling units.Sep 14, 2021
COM2020INSTALL (30) # BRANCH CIRCUITS/FEEDERS , (1) 500 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.Mar 11, 2020
COM2020AS PER CHAP:INSTALL (3) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 18000 BTU AIR-CON SYSTEM, HEAT PUMP, (3) 50 CFM EXHAUST SYSTEMS , (1) # DISTRIBUTION SYSTEM, RECONSTRUCTION ( # DIFFUSERS) AS PER CODE. (DIRECT REPLACEMENT IN THE SAME SIZE, CAPACITY, AND LOCATION). ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES.Feb 18, 2020

Violations

3
KindCategoryStatusFineBalanceDate
citationPM 305.9O$50$125Feb 11, 2026
citationBC 114.14O$500$1,000Jan 29, 2026
vacant_building_noticeVacantopenJun 22, 2015

Inspections

1
TypeStatusActionDate
EXT_WW1Not FinishedPASSApr 29, 2026

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.