Baltimore City · 21223
322 S BRUCE ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $15,000
- Land use
- Residential (R)
- Year built
- 1915
- Last sale
- Dec 11, 2025
Assessment
| Owner | ANGEL CONSTRUCTION INVESTMENT LLC |
|---|---|
| Land use | Residential (R) |
| Total assessment | $15,000 (cycle 2026) |
| Last sale | Dec 11, 2025 — $17,000 |
| Year built | 1915 |
| Zoning | R-8 |
| Vacant | Yes |
Permits
5| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | Scope of work: complete Alteration. (category 1 Interior Demolition through-out) Nonstructural drywall to accommodate R21 wall Insulation and R49 attic insulation, Install 1/2" sheetrock (Walls and Ceilings), spackle finish and Paint. Laminate all Floors with waterproof Vinyl Flooring. Install ceramic Tiles in all Bathroom floors and partial walls. Install 6 Replacement Windows In Existing Frames. Install 3 Entrance Doors (No change in size). In stall 12 Interior Closet Doors. Install All new Kitchen Cabinets and countertops. All work will be completed according to code. Replace 4 damages floor joists, frame bulk heads using 2x4 around duct and plumbing pipes Approved For Work Only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. Separate permit will be required for electrical, mechanical, and plumbing work. As per code | $5,000 | Jun 8, 2026 |
| BRCM | 200 AMPS SERVICE,10 CICUITS 25 FIXTURES, 9 PLUMBING FIXTURES, WATER AND WASTE INTERIOR RECONTRUCTIONS, 2.5 HEAT PUMP DUCT WORK | $5,000 | Mar 2, 2026 |
| BRCM | THE SCOPE OF WORK FOR THE PROJECT CONSISTS OF THE PERFORMANCE OF LIMITED DEMOLITION, REPLACEMENTS, NEW CONSTRUCTION, AND ALL NECESSARY MODIFICATIONS REQUIRED TO COMPLETE THE PROJECT IN ACCORDANCE WITH THE PROPOSED PLANS. IN THE BASEMENT LEVEL, NO DEMOLITION OF EXISTING WALLS WILL BE PERFORMED; ONLY THE EXISTING DOORS AND WINDOWS WILL BE REMOVED AND REPLACED WITH NEW UNITS IN ACCORDANCE WITH THE EXISTING AND PROPOSED DESIGN. NEW INTERIOR PARTITIONS WILL BE CONSTRUCTED TO CREATE THE PROPOSED SPACES, INCLUDING THE MECHANICAL ROOM, LAUNDRY, OFFICE, BEDROOMS, CLOSETS, AND BATHROOMS, IN ADDITION TO THE INSTALLATION OF NEW DOORS, WINDOWS, BATHROOM FIXTURES, AND THE MODIFICATION OF MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS TO MATCH THE NEW LAYOUT. REQUIRED STRUCTURAL ADJUSTMENTS WILL ALSO BE COMPLETED TO PROPERLY INTEGRATE THE STAIR SYSTEM AND ALL STRUCTURAL REINFORCEMENTS INDICATED IN THE STRUCTURAL PLANS. ON THE GROUND FLOOR, NO DEMOLITION OF STRUCTURAL WALLS WILL BE PERFORMED; HOWEVER, DUE TO FIRE DAMAGE TO THE EXISTING ROOF, THE ROOF SYSTEM WILL BE COMPLETELY DEMOLISHED AND REPLACED WITH A NEW ROOF SYSTEM IN ACCORDANCE WITH THE PROPOSED PLANS, INCLUDING NEW FRAMING, JOISTS, HEADERS, AND STRUCTURAL REINFORCEMENTS AS REQUIRED. ON THIS LEVEL, ALL EXISTING DOORS AND WINDOWS WILL BE REMOVED AND REPLACED WITH NEW UNITS PER THE PROPOSED DESIGN. NEW INTERIOR PARTITIONS WILL BE CONSTRUCTED TO DEFINE THE LIVING ROOM, DINING ROOM, KITCHEN, BEDROOMS, CLOSETS, AND CIRCULATION AREAS, INCLUDING THE INSTALLATION OF NEW KITCHEN CABINETS AND THE PREPARATION OF CONNECTIONS FOR APPLIANCES AND SERVICES. ON THE UPPER FLOOR, NO DEMOLITION OF EXISTING WALLS WILL BE PERFORMED; HOWEVER, SIMILAR TO THE LOWER LEVEL, THE EXISTING ROOF IS FIRE DAMAGED AND WILL BE FULLY DEMOLISHED AND REPLACED WITH A NEW ROOF SYSTEM IN ACCORDANCE WITH THE PROPOSED PLANS, INCLUDING NEW FRAMING, STRUCTURAL REINFORCEMENTS, AND REQUIRED SLOPES. ON THIS LEVEL, EXISTING WINDOWS WILL BE REPLACED WITH NEW UNITS, INCLUDING THE INSTALLATION OF EGRESS WINDOWS WHERE SPECIFIED. NEW INTERIOR PARTITIONS WILL BE CONSTRUCTED TO CREATE THE PROPOSED LAYOUT, INCLUDING BEDROOMS, FULL BATHROOMS, CLOSETS, AND CIRCULATION AREAS, ALONG WITH THE INSTALLATION OF NEW DOORS, BATHROOM FIXTURES, AND FINISHES AS SHOWN IN THE PROJECT DOCUMENTS. THE PROJECT AS A WHOLE INCLUDES THE REMOVAL AND REPLACEMENT OF DAMAGED DOORS, WINDOWS, AND ROOF SYSTEMS, THE CONSTRUCTION OF NEW STRUCTURAL AND ARCHITECTURAL SYSTEMS, THE INSTALLATION OF NEW INTERIOR PARTITIONS, THE MODIFICATION OF BUILDING SYSTEMS, AND THE COMPLETION OF ALL WORK NECESSARY TO FULLY TRANSFORM THE PROPERTY ACROSS ALL THREE LEVELS, IN FULL COMPLIANCE WITH THE PROPOSED PLANS, TECHNICAL SPECIFICATIONS, AND APPLICABLE CODES AND REGULATIONS, ENSURING PROPER FUNCTIONALITY, STRUCTURAL SAFETY, AND APPROVED DESIGN INTENT. Separate permit will be required for electrical, mechanical, and plumbing work. As per plans and as per code. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. | $85,000 | Feb 6, 2026 |
| BRCM | Scope of Work: A non-structural demolition will be performed throughout the residence, which will include the removal of all interior drywall, all existing flooring (carpet, tile, and other finishes), all bathroom fixtures, all kitchen and bathroom cabinets, non-structural partition walls, the concrete slab of the basement as required, all interior and exterior doors, all windows, and all bathroom tile. Additionally, we want to remove all debris generated by the fire. No structural elements will be altered, and all debris will be properly removed and disposed of in accordance with the Baltimore City codes. | $12,200 | Dec 2, 2025 |
| BRCM | SCOPE OF WORK: ---- INTERIOR/EXTERIOR ALTERATIONS -------: INTERIOR DEMOLITION (CATEGORY I): RENOVATE EXISTING KITCHEN, NEW HARDWOOD FLOORING, INSTALL NEW DRYWALL, PAINT THE ENTIRE HOUSE, INSTALL NEW 6 WINDOWS SAME SIZE AND PLACE, REPLACE 2 EXTERIOR DOORS SAME SIZE AND PLACE, FURRING ON PERIMETER WALLS AND BULK HEADS (FRAMING USING 2X4 NO NEW PARTITION WALLS WILL BE BUILT), INSTALL R49 AND R21 INSULATION IN CEILING AND WALLS. -----EXTERIOR ALTERATIONS ---- INSTALL NEW RUBBER ROOF (NO STRUCTURAL ALTERNATIONS TO THE ROOF). Replace rear fence planks same size and location 20 ft 1x6x6 Repair front and rear steps same size and location and install handrails ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. *******SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK ******* Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. | $20,000 | Sep 23, 2025 |
Violations
4| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| service_request | SW-Dirty Alley | Closed | — | — | Jun 8, 2026 |
| vacant_building_notice | Vacant | open | — | — | Feb 2, 2026 |
| citation | BC 123.8.1 | P | $1,000 | $0 | Aug 14, 2025 |
| citation | BC 123.8.1 | P | $1,000 | $0 | Apr 2, 2024 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Zoning InvestigationJul 9, 2026 · 79 m
- violation: SW-Dirty AlleyJul 9, 2026 · 88 m · 1805 RAMSAY ST
- violation: HCD-Sanitation PropertyJul 9, 2026 · 140 m
- violation: SW-HGWJul 6, 2026 · 133 m · 1831 RAMSAY ST
- violation: VacantJul 6, 2026 · 133 m · 209 S FULTON AVE
- violation: HCD-Vacant BuildingJul 2, 2026 · 133 m · 1831 RAMSAY ST
- violation: SW-Dirty AlleyJul 1, 2026 · 128 m · 211 S FULTON AVE
- violation: HCD-Vacant BuildingJul 1, 2026 · 133 m · 209 S FULTON AVE
- violation: HCD-Vacant BuildingJun 30, 2026 · 57 m · 303 S FULTON AVE
- violation: SW-HGWJun 30, 2026 · 131 m · 1741 WILKENS AVE
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.