Baltimore City · 21223

1608 MCHENRY ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$15,000
Land use
Residential (R)
Year built
1920
Last sale
Jun 8, 2022

Assessment

OwnerREBUILD DEVELOPMENT LLC
Land useResidential (R)
Total assessment$15,000 (cycle 2026)
Last saleJun 8, 2022 — $5,000
Year built1920
ZoningR-8
VacantYes

Permits

10
TypeDescriptionCostIssued
BRCM2-ton heat pump and ductwork$5,000Mar 23, 2026
BRCMINTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY I) DEMOLITION: -REPLACING ALL INTERIOR AND EXTERNAL WINDOWS & DOORS, *WINDOWS AND DOORS IN THE SAME SIZE AND LOCATION -REPLACING DAMAGED DRYWALL -INSTALL NEW FLOORS, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE$25,000Oct 3, 2025
BRCMInstall (1) # 200 amps Electric Service Up to 600V, (30) # Branch Circuits/Feeders, (30) # Fixtures/Devices as per code.$4,500Sep 17, 2025
BRCMINSTALL (9) PLUMBING FIXTURES, (2) RECONSTRUCT WATER & WASTE SERVICE LINES ON PREMISES (INTERIOR WORK ONLY), (1) ELECTRIC WATER HEATER AS PER CODE.$4,000Sep 17, 2025
COM2024 Extend Original Permit.(original permit:COM2024-56421: Extend Original Permit.(original permit:COM2021-87975:DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4"RISER,11"TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36", 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) ) Original Permit Description:(COM2021-87975) DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4"RISER,11"TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36", 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) ) Original Permit Description:(COM2024-56421) Extend Original Permit.(original permit:COM2021-87975:DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4"RISER,11"TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36", 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) ) Original Permit Description:(COM2021-87975) DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4"RISER,11"TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36", 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) Oct 16, 2024
COM2024 Extend Original Permit.(original permit:COM2021-87975:DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) ) Original Permit Description:(COM2021-87975) DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) Mar 15, 2024
COM2023 Extend Original Permit.(original permit:COM2021-87975:DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) ) Original Permit Description:(COM2021-87975) DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) Jul 13, 2023
COM2022 Extend Original Permit.(original permit:COM2021-87975:DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) ) Original Permit Description:(COM2021-87975) DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) Jan 3, 2023
COM2022 Extend Original Permit.(original permit:COM2021-87975:DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) ) Original Permit Description:(COM2021-87975) DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) Jul 22, 2022
COM2021DEMO WORK: CATEGORY 3 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (18). AS PER PLANS, AS PER CODE, NEW EXTERIOR WORK: NEW REAR BASEMENT EGRESS EXIT (3' X 3') NEW DOORS (2) NEW WINDOWS (14). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) $50,000Dec 13, 2021

Violations

1
KindCategoryStatusDate
vacant_building_noticeVacantopenJul 8, 2022

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.