Baltimore City · 21230
1148 CARROLL ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $51,300
- Land use
- Residential (R)
- Year built
- 1898
- Last sale
- May 20, 2025
Assessment
| Owner | SMITH, KATHLEEN K |
|---|---|
| Land use | Residential (R) |
| Total assessment | $51,300 (cycle 2026) |
| Last sale | May 20, 2025 — $290,000 |
| Year built | 1898 |
| Zoning | R-8 |
| Vacant | — |
Permits
9| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2023 | USE AS A SINGLE-FAMILY DWELLING. | — | Dec 20, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2023-64499:INSTALL (25) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (175) # FIXTURES/DEVICES, (6) # LOW VOLTAGE AS PER CODE.) Original Permit Description:(COM2023-64499) INSTALL (25) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (175) # FIXTURES/DEVICES, (6) # LOW VOLTAGE AS PER CODE. | — | Nov 29, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2023-66779:INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # DISTRIBUTION SYSTEM, RECONSTRUCTION ( # DIFFUSERS) AS PER CODE.) Original Permit Description:(COM2023-66779) INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # DISTRIBUTION SYSTEM, RECONSTRUCTION ( # DIFFUSERS) AS PER CODE. | — | Nov 29, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2023-63129:INSTALL (1) # ELECTRIC WATER HEATER, (20) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION) AS PER CODE.) Original Permit Description:(COM2023-63129) INSTALL (1) # ELECTRIC WATER HEATER, (20) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION) AS PER CODE. | — | Nov 27, 2023 |
| COM2023 | AMEND PERMIT: CHANGE PRIME CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-85106:SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: REMOVE DAMAGED PLASTER, REPAIR DRYWALL AND INSTALL NEW AS NEEDED, PAINT HOME, INSTALL NEW CABINETS, INSTALL NEW TILE FOR BATHROOMS, INSTALL NEW FLOORING, INSTALL NEW INTERIOR DOOR AND TRIM, REPLACE DAMAGED WINDOWS. *DOOR AND WINDOWS WILL BE REPLACED IN THE SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE) Original Permit Description:(COM2022-85106) SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: REMOVE DAMAGED PLASTER, REPAIR DRYWALL AND INSTALL NEW AS NEEDED, PAINT HOME, INSTALL NEW CABINETS, INSTALL NEW TILE FOR BATHROOMS, INSTALL NEW FLOORING, INSTALL NEW INTERIOR DOOR AND TRIM, REPLACE DAMAGED WINDOWS. *DOOR AND WINDOWS WILL BE REPLACED IN THE SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | — | Jun 16, 2023 |
| COM2023 | INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # DISTRIBUTION SYSTEM, RECONSTRUCTION ( # DIFFUSERS) AS PER CODE. | $3,500 | May 21, 2023 |
| COM2023 | INSTALL (25) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (175) # FIXTURES/DEVICES, (6) # LOW VOLTAGE AS PER CODE. | $6,500 | May 4, 2023 |
| COM2023 | INSTALL (1) # ELECTRIC WATER HEATER, (20) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION) AS PER CODE. | $8,000 | Apr 20, 2023 |
| COM2022 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: REMOVE DAMAGED PLASTER, REPAIR DRYWALL AND INSTALL NEW AS NEEDED, PAINT HOME, INSTALL NEW CABINETS, INSTALL NEW TILE FOR BATHROOMS, INSTALL NEW FLOORING, INSTALL NEW INTERIOR DOOR AND TRIM, REPLACE DAMAGED WINDOWS. *DOOR AND WINDOWS WILL BE REPLACED IN THE SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $50,000 | Nov 28, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 9, 2026 · 62 m · 1125 WARD ST
- violation: HCD-Sanitation PropertyJul 9, 2026 · 76 m · 1201 W OSTEND ST
- violation: HCD-Sanitation PropertyJul 9, 2026 · 95 m · 1209 CARROLL ST
- violation: HCD-Sanitation PropertyJul 8, 2026 · 78 m · 1205 W OSTEND ST
- violation: SW-Dirty AlleyJul 7, 2026 · 118 m · 1200 CLEVELAND ST
- permit: BRCMJul 7, 2026 · 139 m · 1140 NANTICOKE ST
- violation: SW-Dirty AlleyJul 6, 2026 · 92 m · 1101 CARROLL ST
- violation: HCD-Sanitation PropertyJul 6, 2026 · 104 m · 1218 CARROLL ST
- violation: SW-Dirty AlleyJul 6, 2026 · 112 m · 1118 CLEVELAND ST
- violation: SW-Dirty AlleyJul 6, 2026 · 112 m · 1118 CLEVELAND ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.