- Total assessment
- $249,500
- Land use
- Residential (R)
- Year built
- 1898
- Last sale
- May 19, 2025
Assessment
| Owner | JACKMON, LOLITA SOPHIA |
|---|---|
| Land use | Residential (R) |
| Total assessment | $249,500 (cycle 2026) |
| Last sale | May 19, 2025 — $305,000 |
| Year built | 1898 |
| Zoning | R-8 |
| Vacant | — |
Permits
11| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2024 | TO USE PREMISES AS A SINGLE FAMILY DWELLING. | — | Sep 11, 2024 |
| COM2024 | AMEND PERMIT: CHANGE PLUMBER AND GAS CONTRACTOR . REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-82591:INSTALL (1) # ELECTRIC WATER HEATER, (1) 90000 BTU FUEL-BURNING EQUIP, (14) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 50000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2023-82591) INSTALL (1) # ELECTRIC WATER HEATER, (1) 90000 BTU FUEL-BURNING EQUIP, (14) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 50000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Jul 25, 2024 |
| COM2024 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-86193:INSTALL (22) # BRANCH CIRCUITS/FEEDERS , (120) # FIXTURES/DEVICES, (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.) Original Permit Description:(COM2023-86193) INSTALL (22) # BRANCH CIRCUITS/FEEDERS , (120) # FIXTURES/DEVICES, (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | — | Jul 23, 2024 |
| COM2024 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-85721:INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (4) 50 CFM EXHAUST SYSTEMS , (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.) Original Permit Description:(COM2023-85721) INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (4) 50 CFM EXHAUST SYSTEMS , (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | — | Jul 20, 2024 |
| COM2024 | AMEND PERMIT: CHANGE PRIME CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-55457:THE SCOPE OF WORK FOR THIS RENOVATION PROJECT INCLUDES REBUILDING A PARTY WALL, RECONFIGURING A BASEMENT FOR TWO BEDROOMS WITH CLOSETS AND EGRESS WINDOWS, TWO BATHROOMS, AND A LAUNDRY ROOM, INSTALLING A NEW KITCHEN AND POWDER ROOM ON THE FIRST FLOOR, AND RECONFIGURING THE SECOND FLOOR FOR TWO BEDROOMS WITH CLOSETS AND TWO BATHROOMS. IN ADDITION, THE PROJECT INCLUDES INSTALLING A NEW ROOFTOP PARAPET WALL AND A ROOFTOP COVERED ACCESS DOG HOUSE. THE GOAL OF THIS RENOVATION IS TO MODERNIZE AND IMPROVE THE LIVABILITY OF THE HOME. CURRENTLY, THE PROPERTY IS A SHELL. BASEMENT: REMOVE EXISTING WALLS, CEILING, AND FLOORING AS NECESSARY TO RECONFIGURE THE SPACE INSTALL FRAMING AND NEW WALLS TO CREATE TWO BEDROOMS WITH CLOSETS, A LAUNDRY ROOM, AND TWO BATHROOMS INSTALL EGRESS WINDOWS IN EACH BEDROOM INSTALL INSULATION, DRYWALL, AND FINISH WALLS AND CEILING INSTALL NEW FLOORING PARTY WALL: REMOVE THE EXISTING PARTY WALL INSTALL NEW FRAMING, INSULATION, AND DRYWALL TO REBUILD THE WALL FIRST FLOOR: REMOVE EXISTING KITCHEN AND POWDER ROOM INSTALL NEW KITCHEN CABINETS, COUNTERTOPS, AND APPLIANCES INSTALL NEW FLOORING INSTALL NEW FIXTURES AND FINISHES IN THE POWDER ROOM SECOND FLOOR: REMOVE EXISTING WALLS, CEILING, AND FLOORING AS NECESSARY TO RECONFIGURE THE SPACE INSTALL FRAMING AND NEW WALLS TO CREATE TWO BEDROOMS WITH CLOSETS AND TWO BATHROOMS INSTALL INSULATION, DRYWALL, AND FINISH WALLS AND CEILING INSTALL NEW FLOORING ROOF: INSTALL NEW ROOFTOP PARAPET WALL AROUND THE PERIMETER OF THE ROOF INSTALL A ROOFTOP COVERED ACCESS DOG HOUSE WITH A WEATHER-RESISTANT ROOF INSTALL ANY NECESSARY ROOFTOP ACCESS EQUIPMENT, SUCH AS STAIRS OR A LADDER NOTE: MECHANICAL, ELECTRICAL, AND PLUMBING PERMITS ARE TO BE OBTAINED BY OTHERS AS NEEDED.) Original Permit Description:(COM2023-55457) THE SCOPE OF WORK FOR THIS RENOVATION PROJECT INCLUDES REBUILDING A PARTY WALL, RECONFIGURING A BASEMENT FOR TWO BEDROOMS WITH CLOSETS AND EGRESS WINDOWS, TWO BATHROOMS, AND A LAUNDRY ROOM, INSTALLING A NEW KITCHEN AND POWDER ROOM ON THE FIRST FLOOR, AND RECONFIGURING THE SECOND FLOOR FOR TWO BEDROOMS WITH CLOSETS AND TWO BATHROOMS. IN ADDITION, THE PROJECT INCLUDES INSTALLING A NEW ROOFTOP PARAPET WALL AND A ROOFTOP COVERED ACCESS DOG HOUSE. THE GOAL OF THIS RENOVATION IS TO MODERNIZE AND IMPROVE THE LIVABILITY OF THE HOME. CURRENTLY, THE PROPERTY IS A SHELL. BASEMENT: REMOVE EXISTING WALLS, CEILING, AND FLOORING AS NECESSARY TO RECONFIGURE THE SPACE INSTALL FRAMING AND NEW WALLS TO CREATE TWO BEDROOMS WITH CLOSETS, A LAUNDRY ROOM, AND TWO BATHROOMS INSTALL EGRESS WINDOWS IN EACH BEDROOM INSTALL INSULATION, DRYWALL, AND FINISH WALLS AND CEILING INSTALL NEW FLOORING PARTY WALL: REMOVE THE EXISTING PARTY WALL INSTALL NEW FRAMING, INSULATION, AND DRYWALL TO REBUILD THE WALL FIRST FLOOR: REMOVE EXISTING KITCHEN AND POWDER ROOM INSTALL NEW KITCHEN CABINETS, COUNTERTOPS, AND APPLIANCES INSTALL NEW FLOORING INSTALL NEW FIXTURES AND FINISHES IN THE POWDER ROOM SECOND FLOOR: REMOVE EXISTING WALLS, CEILING, AND FLOORING AS NECESSARY TO RECONFIGURE THE SPACE INSTALL FRAMING AND NEW WALLS TO CREATE TWO BEDROOMS WITH CLOSETS AND TWO BATHROOMS INSTALL INSULATION, DRYWALL, AND FINISH WALLS AND CEILING INSTALL NEW FLOORING ROOF: INSTALL NEW ROOFTOP PARAPET WALL AROUND THE PERIMETER OF THE ROOF INSTALL A ROOFTOP COVERED ACCESS DOG HOUSE WITH A WEATHER-RESISTANT ROOF INSTALL ANY NECESSARY ROOFTOP ACCESS EQUIPMENT, SUCH AS STAIRS OR A LADDER NOTE: MECHANICAL, ELECTRICAL, AND PLUMBING PERMITS ARE TO BE OBTAINED BY OTHERS AS NEEDED. | — | Mar 21, 2024 |
| COM2023 | INSTALL (22) # BRANCH CIRCUITS/FEEDERS , (120) # FIXTURES/DEVICES, (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $15,000 | Nov 6, 2023 |
| COM2023 | INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (4) 50 CFM EXHAUST SYSTEMS , (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $10,000 | Oct 31, 2023 |
| COM2023 | INSTALL (1) # ELECTRIC WATER HEATER, (1) 90000 BTU FUEL-BURNING EQUIP, (14) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 50000 BTU FUEL-BURNING EQUIP AS PER CODE. | $5,000 | Oct 6, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2023-55457:THE SCOPE OF WORK FOR THIS RENOVATION PROJECT INCLUDES REBUILDING A PARTY WALL, RECONFIGURING A BASEMENT FOR TWO BEDROOMS WITH CLOSETS AND EGRESS WINDOWS, TWO BATHROOMS, AND A LAUNDRY ROOM, INSTALLING A NEW KITCHEN AND POWDER ROOM ON THE FIRST FLOOR, AND RECONFIGURING THE SECOND FLOOR FOR TWO BEDROOMS WITH CLOSETS AND TWO BATHROOMS. IN ADDITION, THE PROJECT INCLUDES INSTALLING A NEW ROOFTOP PARAPET WALL AND A ROOFTOP COVERED ACCESS DOG HOUSE. THE GOAL OF THIS RENOVATION IS TO MODERNIZE AND IMPROVE THE LIVABILITY OF THE HOME. CURRENTLY, THE PROPERTY IS A SHELL. BASEMENT: REMOVE EXISTING WALLS, CEILING, AND FLOORING AS NECESSARY TO RECONFIGURE THE SPACE INSTALL FRAMING AND NEW WALLS TO CREATE TWO BEDROOMS WITH CLOSETS, A LAUNDRY ROOM, AND TWO BATHROOMS INSTALL EGRESS WINDOWS IN EACH BEDROOM INSTALL INSULATION, DRYWALL, AND FINISH WALLS AND CEILING INSTALL NEW FLOORING PARTY WALL: REMOVE THE EXISTING PARTY WALL INSTALL NEW FRAMING, INSULATION, AND DRYWALL TO REBUILD THE WALL FIRST FLOOR: REMOVE EXISTING KITCHEN AND POWDER ROOM INSTALL NEW KITCHEN CABINETS, COUNTERTOPS, AND APPLIANCES INSTALL NEW FLOORING INSTALL NEW FIXTURES AND FINISHES IN THE POWDER ROOM SECOND FLOOR: REMOVE EXISTING WALLS, CEILING, AND FLOORING AS NECESSARY TO RECONFIGURE THE SPACE INSTALL FRAMING AND NEW WALLS TO CREATE TWO BEDROOMS WITH CLOSETS AND TWO BATHROOMS INSTALL INSULATION, DRYWALL, AND FINISH WALLS AND CEILING INSTALL NEW FLOORING ROOF: INSTALL NEW ROOFTOP PARAPET WALL AROUND THE PERIMETER OF THE ROOF INSTALL A ROOFTOP COVERED ACCESS DOG HOUSE WITH A WEATHER-RESISTANT ROOF INSTALL ANY NECESSARY ROOFTOP ACCESS EQUIPMENT, SUCH AS STAIRS OR A LADDER NOTE: MECHANICAL, ELECTRICAL, AND PLUMBING PERMITS ARE TO BE OBTAINED BY OTHERS AS NEEDED.) Original Permit Description:(COM2023-55457) THE SCOPE OF WORK FOR THIS RENOVATION PROJECT INCLUDES REBUILDING A PARTY WALL, RECONFIGURING A BASEMENT FOR TWO BEDROOMS WITH CLOSETS AND EGRESS WINDOWS, TWO BATHROOMS, AND A LAUNDRY ROOM, INSTALLING A NEW KITCHEN AND POWDER ROOM ON THE FIRST FLOOR, AND RECONFIGURING THE SECOND FLOOR FOR TWO BEDROOMS WITH CLOSETS AND TWO BATHROOMS. IN ADDITION, THE PROJECT INCLUDES INSTALLING A NEW ROOFTOP PARAPET WALL AND A ROOFTOP COVERED ACCESS DOG HOUSE. THE GOAL OF THIS RENOVATION IS TO MODERNIZE AND IMPROVE THE LIVABILITY OF THE HOME. CURRENTLY, THE PROPERTY IS A SHELL. BASEMENT: REMOVE EXISTING WALLS, CEILING, AND FLOORING AS NECESSARY TO RECONFIGURE THE SPACE INSTALL FRAMING AND NEW WALLS TO CREATE TWO BEDROOMS WITH CLOSETS, A LAUNDRY ROOM, AND TWO BATHROOMS INSTALL EGRESS WINDOWS IN EACH BEDROOM INSTALL INSULATION, DRYWALL, AND FINISH WALLS AND CEILING INSTALL NEW FLOORING PARTY WALL: REMOVE THE EXISTING PARTY WALL INSTALL NEW FRAMING, INSULATION, AND DRYWALL TO REBUILD THE WALL FIRST FLOOR: REMOVE EXISTING KITCHEN AND POWDER ROOM INSTALL NEW KITCHEN CABINETS, COUNTERTOPS, AND APPLIANCES INSTALL NEW FLOORING INSTALL NEW FIXTURES AND FINISHES IN THE POWDER ROOM SECOND FLOOR: REMOVE EXISTING WALLS, CEILING, AND FLOORING AS NECESSARY TO RECONFIGURE THE SPACE INSTALL FRAMING AND NEW WALLS TO CREATE TWO BEDROOMS WITH CLOSETS AND TWO BATHROOMS INSTALL INSULATION, DRYWALL, AND FINISH WALLS AND CEILING INSTALL NEW FLOORING ROOF: INSTALL NEW ROOFTOP PARAPET WALL AROUND THE PERIMETER OF THE ROOF INSTALL A ROOFTOP COVERED ACCESS DOG HOUSE WITH A WEATHER-RESISTANT ROOF INSTALL ANY NECESSARY ROOFTOP ACCESS EQUIPMENT, SUCH AS STAIRS OR A LADDER NOTE: MECHANICAL, ELECTRICAL, AND PLUMBING PERMITS ARE TO BE OBTAINED BY OTHERS AS NEEDED. | — | Oct 4, 2023 |
| COM2023 | UNDERPIN STRUCTURE PER ENGINEERED PLANS TO INCREASE CEILING HEIGHT. | $15,000 | Sep 5, 2023 |
| COM2023 | THE SCOPE OF WORK FOR THIS RENOVATION PROJECT INCLUDES REBUILDING A PARTY WALL, RECONFIGURING A BASEMENT FOR TWO BEDROOMS WITH CLOSETS AND EGRESS WINDOWS, TWO BATHROOMS, AND A LAUNDRY ROOM, INSTALLING A NEW KITCHEN AND POWDER ROOM ON THE FIRST FLOOR, AND RECONFIGURING THE SECOND FLOOR FOR TWO BEDROOMS WITH CLOSETS AND TWO BATHROOMS. IN ADDITION, THE PROJECT INCLUDES INSTALLING A NEW ROOFTOP PARAPET WALL AND A ROOFTOP COVERED ACCESS DOG HOUSE. THE GOAL OF THIS RENOVATION IS TO MODERNIZE AND IMPROVE THE LIVABILITY OF THE HOME. CURRENTLY, THE PROPERTY IS A SHELL. BASEMENT: REMOVE EXISTING WALLS, CEILING, AND FLOORING AS NECESSARY TO RECONFIGURE THE SPACE INSTALL FRAMING AND NEW WALLS TO CREATE TWO BEDROOMS WITH CLOSETS, A LAUNDRY ROOM, AND TWO BATHROOMS INSTALL EGRESS WINDOWS IN EACH BEDROOM INSTALL INSULATION, DRYWALL, AND FINISH WALLS AND CEILING INSTALL NEW FLOORING PARTY WALL: REMOVE THE EXISTING PARTY WALL INSTALL NEW FRAMING, INSULATION, AND DRYWALL TO REBUILD THE WALL FIRST FLOOR: REMOVE EXISTING KITCHEN AND POWDER ROOM INSTALL NEW KITCHEN CABINETS, COUNTERTOPS, AND APPLIANCES INSTALL NEW FLOORING INSTALL NEW FIXTURES AND FINISHES IN THE POWDER ROOM SECOND FLOOR: REMOVE EXISTING WALLS, CEILING, AND FLOORING AS NECESSARY TO RECONFIGURE THE SPACE INSTALL FRAMING AND NEW WALLS TO CREATE TWO BEDROOMS WITH CLOSETS AND TWO BATHROOMS INSTALL INSULATION, DRYWALL, AND FINISH WALLS AND CEILING INSTALL NEW FLOORING ROOF: INSTALL NEW ROOFTOP PARAPET WALL AROUND THE PERIMETER OF THE ROOF INSTALL A ROOFTOP COVERED ACCESS DOG HOUSE WITH A WEATHER-RESISTANT ROOF INSTALL ANY NECESSARY ROOFTOP ACCESS EQUIPMENT, SUCH AS STAIRS OR A LADDER NOTE: MECHANICAL, ELECTRICAL, AND PLUMBING PERMITS ARE TO BE OBTAINED BY OTHERS AS NEEDED. | $90,000 | Mar 28, 2023 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 10, 2026 · 123 m · 1332 GLYNDON AVE
- permit: BRCMJul 9, 2026 · 123 m · 1332 GLYNDON AVE
- violation: SW-HGWJul 8, 2026 · 83 m · 1322 JAMES ST
- violation: SW-Dirty AlleyJul 7, 2026 · 113 m · 1201 GLYNDON AVE
- violation: SW-HGWJul 7, 2026 · 143 m · 1203 JAMES ST
- violation: SW-HGWJul 7, 2026 · 147 m · 1201 JAMES ST
- violation: HCD-Vacant BuildingJul 6, 2026 · 83 m · 1322 JAMES ST
- violation: SW-Dirty AlleyJul 6, 2026 · 83 m · 1322 JAMES ST
- violation: HCD-CCE Building InspectionsJul 6, 2026 · 142 m · 1260 WASHINGTON BLVD
- violation: HCD-Maintenance StructureJul 5, 2026 · 81 m · 1323 GLYNDON AVE
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.