Baltimore City · 21230
1156 NANTICOKE ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $221,500
- Land use
- Residential (R)
- Year built
- 1898
- Last sale
- Aug 30, 2022
Assessment
| Owner | KHOURY, LEENA MARIE |
|---|---|
| Land use | Residential (R) |
| Total assessment | $221,500 (cycle 2026) |
| Last sale | Aug 30, 2022 — $250,000 |
| Year built | 1898 |
| Zoning | R-8 |
| Vacant | — |
Permits
5| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2023 | FENCE CONSTRUCTION | $1,492 | Aug 9, 2023 |
| COM2021 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. EXISTING BASEMENT HEIGHT = 6'-0'', PROPOSED HEIGHT = 8'-0''. NEW 4'' CONCRETE SLAB ON 4'' GRAVEL. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. | $5,000 | Jun 18, 2021 |
| COM2021 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: REMOVE AND REPLACE EXISTING BASEMENT CONCRETE FLOOR 11/35 4'' GRAVEL WIRE MESS 4'' CONCRETE. ALL WORK DONE PER CODE, *NO CURBING/NO UNDERPINNING | $5,000 | May 7, 2021 |
| COM2021 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): INSTALLATION OF 600 SQ/FT OF NEW DRYWALL, FURRING ON PERIMETER EXTERIOR WALL ONLY IN BASEMENT (NO NEW PARTITION WALLS TO BE BUILT), POUR CONCRETE SLAB IN BASEMENT 4'' THICK 4'' GRAVEL (NO CURBING OR UNDERPINNING TO BE DONE), ALL WORK WILL BE DONE AS PER BALTIMORE CITY CODE, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | $3,500 | Feb 17, 2021 |
| COM2019 | reinstate original permit.(original permit:com2016-07317:category 11 --structural alterations- interior work 1032 sq.ft. relocate staircase, install new hardwork, floors, drywall replacement of sub-floor ***no work in basement as per code/sketch) original permit description:(com2016-07317) category 11 --structural alterations- interior work 1032 sq.ft. relocate staircase, install new hardwork, floors, drywall replacement of sub-floor ***no work in basement as per code/sketch | — | May 3, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 9, 2026 · 137 m · 1209 CARROLL ST
- permit: BRCMJul 7, 2026 · 29 m · 1140 NANTICOKE ST
- violation: SW-Dirty AlleyJul 7, 2026 · 118 m · 1200 CLEVELAND ST
- violation: SW-Dirty AlleyJul 6, 2026 · 95 m · 1118 CLEVELAND ST
- violation: SW-Dirty AlleyJul 6, 2026 · 95 m · 1118 CLEVELAND ST
- violation: SW-Dirty AlleyJul 6, 2026 · 95 m · 1118 CLEVELAND ST
- violation: SW-Dirty AlleyJul 6, 2026 · 121 m · 1101 CARROLL ST
- violation: SW-Dirty AlleyJul 5, 2026 · 95 m · 1118 CLEVELAND ST
- violation: HCD-Maintenance StructureJul 3, 2026 · 127 m · 1100 W CROSS ST
- permit: BRCMJul 2, 2026 · 91 m · 1131 CARROLL ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.