Baltimore City · 21230
1401 RIDGELY ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $2,995,800
- Land use
- Industrial (I)
- Year built
- 1963
- Last sale
- Jan 11, 2023
Assessment
| Owner | CHECKERSPOT PROPERTIES LLC |
|---|---|
| Land use | Industrial (I) |
| Total assessment | $2,995,800 (cycle 2026) |
| Last sale | Jan 11, 2023 — $2,600,000 |
| Year built | 1963 |
| Zoning | C-4 |
| Vacant | — |
Permits
13| Type | Description | Cost | Issued |
|---|---|---|---|
| BUSE | CONTINUE USE FOR/A A BREWERY WITH A TAPROOM AND KITCHEN AND OUTDOOR PATIO ON PRIVATE PROPERTY. ADDING LIVE ENTERTAINMENT PER CITY COUNCIL ORDINANCE 26-101. | — | Jun 5, 2026 |
| BCCM | Commercial rooftop solar installation including two separate interconnections. Interconnection 1 is 168.885 kW DC / 120 kW AC and interconnection 2 is 56.295 kW DC / 45.6 kW AC. System is attached to the roof through a pre-engineered racking system. Equipment used for system is below: Solar Panel - 556x Trina Solar TSM-405DEG15MC.20(II) 405w solar panel Inverters - 1x SE120kUS (277/480v) on interconnection 1 & 4x SE11400H-US (240v) on interconnection 2 Unirac Gridflex racking. Your licensed electrical contractor must be added before the work on this permit can begin. As per plans as per code | $48,392 | Jul 30, 2025 |
| BUSE | TO USE PORTION AS A COMMERCIAL CARRYOUT KITCHEN LICENSED UNDER A NEW ENTITY. | — | Jun 27, 2025 |
| USE2023 | BREWERY WITH A TAPROOM AND KITCHEN AND OUTDOOR PATIO ON PRIVATE PROPERTY WHERE BEER BREWED ON PREMISES IS SERVED. REFERENCE BUILDING PERMIT # COM2022 - 03400 | — | Feb 27, 2024 |
| COM2023 | INSTALL FIRE ALARM SYSTEM AS PER PLANS AS PER CODE. (ADDRESS KNOWN AS 1401 RIDGELY ST) | $12,995 | Aug 23, 2023 |
| COM2023 | INSTALL (50) # LOW VOLTAGE AS PER CODE. | $5,000 | Aug 22, 2023 |
| COM2023 | AMEND PERMIT: ADD HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2022-03400:EXISTING WAREHOUSE BUILDING WITH EXISTING INTERIOR MEZZANINE TO BE USED FOR A NEW BREWERY AND BAR AREA, PROPOSED WORK TO INCLUDE: DEMOLITION OF INTERIOR WALLS, DOORS IN WAREHOUSE AREA AND EXISTING BUILDOUT ON MEZZANINE, EXISTING MEZZANINE STRUCTURE TO REMAIN, INTERIOR LAYOUT TO BE MODIFIED FOR NEW BREWERY AND BAR AREAS, PRODUCTION AREA AND BAR AREA TO RECEIVE BUILDING ROOMS, RESTROOMS AND A SMALL COMMERCIAL KITCHEN. EXISTING MEZZANINE TO RECEIVE NEW RESTROOM FIXTURES, SEATING AREA FOR PATRONS, AND NEW ADA METAL STAIRS, BAR DESIGN AND CONSTRUCTION, COOLER AREA, AND ALL PROCESSING EQUIPMENT IS DESIGN BUILD BY OTHERS, EXISTING EXTERIOR WALL OPENINGS TO BE INFILLED WITH NEW WALL INFILL, WINDOWS OR DOORS, NEW EXTERIOR ADA COMPLIANT RAMPS AND STAIRS TO BE INSTALLED AT BUILDING ENTRANCES FOR EGRESS, RELOCATION OF EXISTING MECHANICAL UNITS AS BAR AREA WILL BE CONDITIONED, PRODUCTION AREA WILL NOT BE A CONDITIONED SPACE, EXISTING ELECTRICAL POWER AND PLUMBING INFRASTRUCTURE TO BE REUSED, MECHANICAL AND ELECTRICAL TO REFLECT NEW PLAN, STRUCTURAL SCOPE TO INCLUDE ADDITIONAL SUPPORTS FOR MEZZANINE STABILITY, NEW SLOPED CONCRETE SLABS FOR PRODUCTION AREA, ROOF REINFORCEMENT FOR NEW EQUIPMENT AND AREAS AROUND THE BUILDING THAT REQUIRE REPAIR AND/OR STABILIZING AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS.) Original Permit Description:(COM2022-03400) EXISTING WAREHOUSE BUILDING WITH EXISTING INTERIOR MEZZANINE TO BE USED FOR A NEW BREWERY AND BAR AREA, PROPOSED WORK TO INCLUDE: DEMOLITION OF INTERIOR WALLS, DOORS IN WAREHOUSE AREA AND EXISTING BUILDOUT ON MEZZANINE, EXISTING MEZZANINE STRUCTURE TO REMAIN, INTERIOR LAYOUT TO BE MODIFIED FOR NEW BREWERY AND BAR AREAS, PRODUCTION AREA AND BAR AREA TO RECEIVE BUILDING ROOMS, RESTROOMS AND A SMALL COMMERCIAL KITCHEN. EXISTING MEZZANINE TO RECEIVE NEW RESTROOM FIXTURES, SEATING AREA FOR PATRONS, AND NEW ADA METAL STAIRS, BAR DESIGN AND CONSTRUCTION, COOLER AREA, AND ALL PROCESSING EQUIPMENT IS DESIGN BUILD BY OTHERS, EXISTING EXTERIOR WALL OPENINGS TO BE INFILLED WITH NEW WALL INFILL, WINDOWS OR DOORS, NEW EXTERIOR ADA COMPLIANT RAMPS AND STAIRS TO BE INSTALLED AT BUILDING ENTRANCES FOR EGRESS, RELOCATION OF EXISTING MECHANICAL UNITS AS BAR AREA WILL BE CONDITIONED, PRODUCTION AREA WILL NOT BE A CONDITIONED SPACE, EXISTING ELECTRICAL POWER AND PLUMBING INFRASTRUCTURE TO BE REUSED, MECHANICAL AND ELECTRICAL TO REFLECT NEW PLAN, STRUCTURAL SCOPE TO INCLUDE ADDITIONAL SUPPORTS FOR MEZZANINE STABILITY, NEW SLOPED CONCRETE SLABS FOR PRODUCTION AREA, ROOF REINFORCEMENT FOR NEW EQUIPMENT AND AREAS AROUND THE BUILDING THAT REQUIRE REPAIR AND/OR STABILIZING AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | — | May 26, 2023 |
| COM2023 | INSTALL (28) # LOW VOLTAGE AS PER CODE. | $6,995 | Apr 24, 2023 |
| COM2023 | AMEND PERMIT: ADD GAS CONTRACTOR .(ORIGINAL PERMIT:COM2022-03400:EXISTING WAREHOUSE BUILDING WITH EXISTING INTERIOR MEZZANINE TO BE USED FOR A NEW BREWERY AND BAR AREA, PROPOSED WORK TO INCLUDE: DEMOLITION OF INTERIOR WALLS, DOORS IN WAREHOUSE AREA AND EXISTING BUILDOUT ON MEZZANINE, EXISTING MEZZANINE STRUCTURE TO REMAIN, INTERIOR LAYOUT TO BE MODIFIED FOR NEW BREWERY AND BAR AREAS, PRODUCTION AREA AND BAR AREA TO RECEIVE BUILDING ROOMS, RESTROOMS AND A SMALL COMMERCIAL KITCHEN. EXISTING MEZZANINE TO RECEIVE NEW RESTROOM FIXTURES, SEATING AREA FOR PATRONS, AND NEW ADA METAL STAIRS, BAR DESIGN AND CONSTRUCTION, COOLER AREA, AND ALL PROCESSING EQUIPMENT IS DESIGN BUILD BY OTHERS, EXISTING EXTERIOR WALL OPENINGS TO BE INFILLED WITH NEW WALL INFILL, WINDOWS OR DOORS, NEW EXTERIOR ADA COMPLIANT RAMPS AND STAIRS TO BE INSTALLED AT BUILDING ENTRANCES FOR EGRESS, RELOCATION OF EXISTING MECHANICAL UNITS AS BAR AREA WILL BE CONDITIONED, PRODUCTION AREA WILL NOT BE A CONDITIONED SPACE, EXISTING ELECTRICAL POWER AND PLUMBING INFRASTRUCTURE TO BE REUSED, MECHANICAL AND ELECTRICAL TO REFLECT NEW PLAN, STRUCTURAL SCOPE TO INCLUDE ADDITIONAL SUPPORTS FOR MEZZANINE STABILITY, NEW SLOPED CONCRETE SLABS FOR PRODUCTION AREA, ROOF REINFORCEMENT FOR NEW EQUIPMENT AND AREAS AROUND THE BUILDING THAT REQUIRE REPAIR AND/OR STABILIZING AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS.) Original Permit Description:(COM2022-03400) EXISTING WAREHOUSE BUILDING WITH EXISTING INTERIOR MEZZANINE TO BE USED FOR A NEW BREWERY AND BAR AREA, PROPOSED WORK TO INCLUDE: DEMOLITION OF INTERIOR WALLS, DOORS IN WAREHOUSE AREA AND EXISTING BUILDOUT ON MEZZANINE, EXISTING MEZZANINE STRUCTURE TO REMAIN, INTERIOR LAYOUT TO BE MODIFIED FOR NEW BREWERY AND BAR AREAS, PRODUCTION AREA AND BAR AREA TO RECEIVE BUILDING ROOMS, RESTROOMS AND A SMALL COMMERCIAL KITCHEN. EXISTING MEZZANINE TO RECEIVE NEW RESTROOM FIXTURES, SEATING AREA FOR PATRONS, AND NEW ADA METAL STAIRS, BAR DESIGN AND CONSTRUCTION, COOLER AREA, AND ALL PROCESSING EQUIPMENT IS DESIGN BUILD BY OTHERS, EXISTING EXTERIOR WALL OPENINGS TO BE INFILLED WITH NEW WALL INFILL, WINDOWS OR DOORS, NEW EXTERIOR ADA COMPLIANT RAMPS AND STAIRS TO BE INSTALLED AT BUILDING ENTRANCES FOR EGRESS, RELOCATION OF EXISTING MECHANICAL UNITS AS BAR AREA WILL BE CONDITIONED, PRODUCTION AREA WILL NOT BE A CONDITIONED SPACE, EXISTING ELECTRICAL POWER AND PLUMBING INFRASTRUCTURE TO BE REUSED, MECHANICAL AND ELECTRICAL TO REFLECT NEW PLAN, STRUCTURAL SCOPE TO INCLUDE ADDITIONAL SUPPORTS FOR MEZZANINE STABILITY, NEW SLOPED CONCRETE SLABS FOR PRODUCTION AREA, ROOF REINFORCEMENT FOR NEW EQUIPMENT AND AREAS AROUND THE BUILDING THAT REQUIRE REPAIR AND/OR STABILIZING AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | — | Mar 30, 2023 |
| COM2023 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2022-03400:EXISTING WAREHOUSE BUILDING WITH EXISTING INTERIOR MEZZANINE TO BE USED FOR A NEW BREWERY AND BAR AREA, PROPOSED WORK TO INCLUDE: DEMOLITION OF INTERIOR WALLS, DOORS IN WAREHOUSE AREA AND EXISTING BUILDOUT ON MEZZANINE, EXISTING MEZZANINE STRUCTURE TO REMAIN, INTERIOR LAYOUT TO BE MODIFIED FOR NEW BREWERY AND BAR AREAS, PRODUCTION AREA AND BAR AREA TO RECEIVE BUILDING ROOMS, RESTROOMS AND A SMALL COMMERCIAL KITCHEN. EXISTING MEZZANINE TO RECEIVE NEW RESTROOM FIXTURES, SEATING AREA FOR PATRONS, AND NEW ADA METAL STAIRS, BAR DESIGN AND CONSTRUCTION, COOLER AREA, AND ALL PROCESSING EQUIPMENT IS DESIGN BUILD BY OTHERS, EXISTING EXTERIOR WALL OPENINGS TO BE INFILLED WITH NEW WALL INFILL, WINDOWS OR DOORS, NEW EXTERIOR ADA COMPLIANT RAMPS AND STAIRS TO BE INSTALLED AT BUILDING ENTRANCES FOR EGRESS, RELOCATION OF EXISTING MECHANICAL UNITS AS BAR AREA WILL BE CONDITIONED, PRODUCTION AREA WILL NOT BE A CONDITIONED SPACE, EXISTING ELECTRICAL POWER AND PLUMBING INFRASTRUCTURE TO BE REUSED, MECHANICAL AND ELECTRICAL TO REFLECT NEW PLAN, STRUCTURAL SCOPE TO INCLUDE ADDITIONAL SUPPORTS FOR MEZZANINE STABILITY, NEW SLOPED CONCRETE SLABS FOR PRODUCTION AREA, ROOF REINFORCEMENT FOR NEW EQUIPMENT AND AREAS AROUND THE BUILDING THAT REQUIRE REPAIR AND/OR STABILIZING AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS.) Original Permit Description:(COM2022-03400) EXISTING WAREHOUSE BUILDING WITH EXISTING INTERIOR MEZZANINE TO BE USED FOR A NEW BREWERY AND BAR AREA, PROPOSED WORK TO INCLUDE: DEMOLITION OF INTERIOR WALLS, DOORS IN WAREHOUSE AREA AND EXISTING BUILDOUT ON MEZZANINE, EXISTING MEZZANINE STRUCTURE TO REMAIN, INTERIOR LAYOUT TO BE MODIFIED FOR NEW BREWERY AND BAR AREAS, PRODUCTION AREA AND BAR AREA TO RECEIVE BUILDING ROOMS, RESTROOMS AND A SMALL COMMERCIAL KITCHEN. EXISTING MEZZANINE TO RECEIVE NEW RESTROOM FIXTURES, SEATING AREA FOR PATRONS, AND NEW ADA METAL STAIRS, BAR DESIGN AND CONSTRUCTION, COOLER AREA, AND ALL PROCESSING EQUIPMENT IS DESIGN BUILD BY OTHERS, EXISTING EXTERIOR WALL OPENINGS TO BE INFILLED WITH NEW WALL INFILL, WINDOWS OR DOORS, NEW EXTERIOR ADA COMPLIANT RAMPS AND STAIRS TO BE INSTALLED AT BUILDING ENTRANCES FOR EGRESS, RELOCATION OF EXISTING MECHANICAL UNITS AS BAR AREA WILL BE CONDITIONED, PRODUCTION AREA WILL NOT BE A CONDITIONED SPACE, EXISTING ELECTRICAL POWER AND PLUMBING INFRASTRUCTURE TO BE REUSED, MECHANICAL AND ELECTRICAL TO REFLECT NEW PLAN, STRUCTURAL SCOPE TO INCLUDE ADDITIONAL SUPPORTS FOR MEZZANINE STABILITY, NEW SLOPED CONCRETE SLABS FOR PRODUCTION AREA, ROOF REINFORCEMENT FOR NEW EQUIPMENT AND AREAS AROUND THE BUILDING THAT REQUIRE REPAIR AND/OR STABILIZING AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | — | Mar 24, 2023 |
| COM2023 | AMEND PERMIT: ADD PLUMBER CONTRACTOR . (ORIGINAL PERMIT:COM2022-03400:EXISTING WAREHOUSE BUILDING WITH EXISTING INTERIOR MEZZANINE TO BE USED FOR A NEW BREWERY AND BAR AREA, PROPOSED WORK TO INCLUDE: DEMOLITION OF INTERIOR WALLS, DOORS IN WAREHOUSE AREA AND EXISTING BUILDOUT ON MEZZANINE, EXISTING MEZZANINE STRUCTURE TO REMAIN, INTERIOR LAYOUT TO BE MODIFIED FOR NEW BREWERY AND BAR AREAS, PRODUCTION AREA AND BAR AREA TO RECEIVE BUILDING ROOMS, RESTROOMS AND A SMALL COMMERCIAL KITCHEN. EXISTING MEZZANINE TO RECEIVE NEW RESTROOM FIXTURES, SEATING AREA FOR PATRONS, AND NEW ADA METAL STAIRS, BAR DESIGN AND CONSTRUCTION, COOLER AREA, AND ALL PROCESSING EQUIPMENT IS DESIGN BUILD BY OTHERS, EXISTING EXTERIOR WALL OPENINGS TO BE INFILLED WITH NEW WALL INFILL, WINDOWS OR DOORS, NEW EXTERIOR ADA COMPLIANT RAMPS AND STAIRS TO BE INSTALLED AT BUILDING ENTRANCES FOR EGRESS, RELOCATION OF EXISTING MECHANICAL UNITS AS BAR AREA WILL BE CONDITIONED, PRODUCTION AREA WILL NOT BE A CONDITIONED SPACE, EXISTING ELECTRICAL POWER AND PLUMBING INFRASTRUCTURE TO BE REUSED, MECHANICAL AND ELECTRICAL TO REFLECT NEW PLAN, STRUCTURAL SCOPE TO INCLUDE ADDITIONAL SUPPORTS FOR MEZZANINE STABILITY, NEW SLOPED CONCRETE SLABS FOR PRODUCTION AREA, ROOF REINFORCEMENT FOR NEW EQUIPMENT AND AREAS AROUND THE BUILDING THAT REQUIRE REPAIR AND/OR STABILIZING AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS.) Original Permit Description:(COM2022-03400) EXISTING WAREHOUSE BUILDING WITH EXISTING INTERIOR MEZZANINE TO BE USED FOR A NEW BREWERY AND BAR AREA, PROPOSED WORK TO INCLUDE: DEMOLITION OF INTERIOR WALLS, DOORS IN WAREHOUSE AREA AND EXISTING BUILDOUT ON MEZZANINE, EXISTING MEZZANINE STRUCTURE TO REMAIN, INTERIOR LAYOUT TO BE MODIFIED FOR NEW BREWERY AND BAR AREAS, PRODUCTION AREA AND BAR AREA TO RECEIVE BUILDING ROOMS, RESTROOMS AND A SMALL COMMERCIAL KITCHEN. EXISTING MEZZANINE TO RECEIVE NEW RESTROOM FIXTURES, SEATING AREA FOR PATRONS, AND NEW ADA METAL STAIRS, BAR DESIGN AND CONSTRUCTION, COOLER AREA, AND ALL PROCESSING EQUIPMENT IS DESIGN BUILD BY OTHERS, EXISTING EXTERIOR WALL OPENINGS TO BE INFILLED WITH NEW WALL INFILL, WINDOWS OR DOORS, NEW EXTERIOR ADA COMPLIANT RAMPS AND STAIRS TO BE INSTALLED AT BUILDING ENTRANCES FOR EGRESS, RELOCATION OF EXISTING MECHANICAL UNITS AS BAR AREA WILL BE CONDITIONED, PRODUCTION AREA WILL NOT BE A CONDITIONED SPACE, EXISTING ELECTRICAL POWER AND PLUMBING INFRASTRUCTURE TO BE REUSED, MECHANICAL AND ELECTRICAL TO REFLECT NEW PLAN, STRUCTURAL SCOPE TO INCLUDE ADDITIONAL SUPPORTS FOR MEZZANINE STABILITY, NEW SLOPED CONCRETE SLABS FOR PRODUCTION AREA, ROOF REINFORCEMENT FOR NEW EQUIPMENT AND AREAS AROUND THE BUILDING THAT REQUIRE REPAIR AND/OR STABILIZING AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | — | Mar 23, 2023 |
| COM2022 | EXISTING WAREHOUSE BUILDING WITH EXISTING INTERIOR MEZZANINE TO BE USED FOR A NEW BREWERY AND BAR AREA, PROPOSED WORK TO INCLUDE: DEMOLITION OF INTERIOR WALLS, DOORS IN WAREHOUSE AREA AND EXISTING BUILDOUT ON MEZZANINE, EXISTING MEZZANINE STRUCTURE TO REMAIN, INTERIOR LAYOUT TO BE MODIFIED FOR NEW BREWERY AND BAR AREAS, PRODUCTION AREA AND BAR AREA TO RECEIVE BUILDING ROOMS, RESTROOMS AND A SMALL COMMERCIAL KITCHEN. EXISTING MEZZANINE TO RECEIVE NEW RESTROOM FIXTURES, SEATING AREA FOR PATRONS, AND NEW ADA METAL STAIRS, BAR DESIGN AND CONSTRUCTION, COOLER AREA, AND ALL PROCESSING EQUIPMENT IS DESIGN BUILD BY OTHERS, EXISTING EXTERIOR WALL OPENINGS TO BE INFILLED WITH NEW WALL INFILL, WINDOWS OR DOORS, NEW EXTERIOR ADA COMPLIANT RAMPS AND STAIRS TO BE INSTALLED AT BUILDING ENTRANCES FOR EGRESS, RELOCATION OF EXISTING MECHANICAL UNITS AS BAR AREA WILL BE CONDITIONED, PRODUCTION AREA WILL NOT BE A CONDITIONED SPACE, EXISTING ELECTRICAL POWER AND PLUMBING INFRASTRUCTURE TO BE REUSED, MECHANICAL AND ELECTRICAL TO REFLECT NEW PLAN, STRUCTURAL SCOPE TO INCLUDE ADDITIONAL SUPPORTS FOR MEZZANINE STABILITY, NEW SLOPED CONCRETE SLABS FOR PRODUCTION AREA, ROOF REINFORCEMENT FOR NEW EQUIPMENT AND AREAS AROUND THE BUILDING THAT REQUIRE REPAIR AND/OR STABILIZING AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | $350,000 | Feb 24, 2023 |
| COM2022 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF INTERIOR DRYWALL AND NON-BEARING WALLS, AND REMOVAL OF DEBRIS USING A DUMPSTER. THE TOTAL SQUARE FOOTAGE WHERE DEMO WILL OCCUR IS 4,000 SQ FT, BUT JUST REMOVAL OF THE DRYWALL AND WALLS, SO APPROXIMATELY 200 - 300 LINEAR FEET. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *THIS PERMIT IS FOR INTERIOR DEMOLITION ONLY, SEPARATE PERMIT WILL BE PULLED FOR ANY INTERIOR RENOVATIONS/TENANT FITOUT | $6,000 | Oct 5, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.