Baltimore City · 21230

1101 RUSSELL ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$309,430,000
Land use
Exempt Commercial (EC)
Year built
Last sale
May 7, 2002

This owner holds 5 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerMARYLAND STADIUM
Land useExempt Commercial (EC)
Total assessment$309,430,000 (cycle 2026)
Last saleMay 7, 2002
Year built
ZoningC-5DC
Vacant

Permits

showing 50 of 222
TypeDescriptionCostIssued
BCCMSCOPE OF WORK: ---- PAVING ----- - Expansion of the existing asphalt parking lot at Lot E: Improvements include asphalt mill and overlay, new full depth asphalt, new concrete curbs, ---- TRADES ---- - and light pole relocations. AS PER PLANS AND AS PER CODE. This property is in an Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewal$270,000Jul 10, 2026
BTEMPIt’s a 5th year food and culture festival in the parking lots of the Camden yards sports complex. Some food vendors, staging. It’s about food, music and community! We intend to have fencing. The event is 3 days. As per plans and as per code.$10,000Jun 18, 2026
BCCMElectrical main power and branch circuit wiring to new receptacles, in order to power lighting arrays for the grass at M&T Bank Stadium.$300,000Jun 12, 2026
BCCMAT&T is looking to modify an existing antenna location. This property is in an Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewal$30,000May 29, 2026
BCCMRelocate 11 sprinklers and add 1 sprinkler for ticket office renovation$5,500May 23, 2026
BCCMRemodel of Visitor Aux Locker Room; replace lights with new, replace lighting switches and outlets with new.Mar 12, 2026
BCCMTENANT IMPROVEMENT TO FACILITY'S EXISTING FIRE ALARM SYSTEM. This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewalinformation$50,000Jan 14, 2026
BUSETO USE PORTION SUITE 140 AS A FANATICS RETAIL STORE.Jan 5, 2026
BUSEuse portion of stadium, northeast section, as a retail goods establishment. {Fanatics]Jan 5, 2026
BUSEUse of portion k/a suite 526 for retail sales.Dec 29, 2025
BCCMRAI Amendment to BCCM-25-002458 to change wall mounted speaker strobes to ceiling mount This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewalinformation$30,000Dec 15, 2025
BCCMRelocate 2 sprinklers and add 1 sprinkler for concession space modification$4,800Dec 2, 2025
BCCMInstall 8 new 20 amp circuits, each with a a 20 amp 120 volt GFCI receptacle on columns for Levy Concessions as per code.$10,000Nov 6, 2025
BCCMLighting and Receptacle devices and branch circuit wiring for the fit-out of the the warm shell, becoming a Fanatics Retail Store as per code.$100,000Nov 6, 2025
BCCMTENANT IMPROVEMENT TO FACILITIES EXISTING FIRE ALARM SYSTEM.$30,000Sep 29, 2025
BCCMSprinkler system 61 heads. BFPE to tap into the existing wet system on the club level to run a new feed down to the concours level. The new feed will have an isolation valve installed in the room on the club level. The new run through the exposed concourse level will be heat traced by others. A new zone control assembly will be installed in the mechanical room with a 2" drain running outside the building. the new system will be fed from the mechanical room and provide proper coverage for the new retail space.$90,035Aug 29, 2025
BTEMPFilmwerks is building a temporary hospitality structure for the Baltimore Ravens at the M&T stadium and are reaching to see what permits, if any, are required and to secure them prior to August install. I woudl great appreciate a call back to 7035854860$200,000Aug 29, 2025
BCCM******** INTERIOR RENOVATION ON MAIN CONCOURSE LEVEL OF STADIUM TO CONCESSIONS BOOTH 153 TO INCLUDE ********* SCOPE OF WORK: ------ INTERIOR ALTERATIONS -------- STRUCTURAL, FLOORS, DOORS, WALLS, CEILINGS, -------- TRADES ------- MECHANICAL, ELECTRICAL, PLUMBING, AS PER PLANS AND AS PER CODE.$1Aug 25, 2025
BUSERetail-Change of operator at existing location. Space taken as is. Suite 113Aug 19, 2025
BUSEcontinue to use as concession stand. k/a Suite 540Aug 19, 2025
BUSETo use Suite 514 as a retail goods establishment( change in operator).Aug 19, 2025
BUSERetail-Change of operator at existing location. Space taken as is. Suite 501Aug 19, 2025
BUSEcontinue to use as concession stand. K/A Suite 126Aug 19, 2025
BUSETo use portion as a Kitchen and Bar(The Trust)Aug 12, 2025
BUSETO USE PORTION AS A KITCHEN AND BAR(The Raven Kitchen and Bar)Aug 12, 2025
BUSETo use portion as a Restaurant with 2 Bars(The Champions Club)Aug 12, 2025
BCCMNew 20 amp 277 volt circuit from relay panel to disconnect switch at Gate A.$1,500Aug 12, 2025
BCCMAdd 6 sprinklers for new auxiliary locker room$5,400Jul 23, 2025
BCCMInstallation and modification of plumbing fixtures on the third floor of M&T Bank Stadium$250,000Jul 18, 2025
BCCMInstall wet chemical fire suppression system on kitchen hood$2,940Jun 23, 2025
USE2024USE AS CONCESSION STAND #C 229- RAVENOUS CHICKENJun 20, 2025
USE2024USE PORTION AS CONCESSION STAND #C 103-FST RUSSELL ST. LINKSJun 20, 2025
BCCMRelocate 7 sprinklers and add 2 sprinklers for office renovations$5,600Jun 5, 2025
BCCMRelocate 14 sprinklers and add 13 sprinklers for new kitchen work$11,400Jun 2, 2025
BCCM********** RENOVATION OF EXISTING RACK ROOM ON 2ND FLOOR (PRESS LEVEL) OF STADIUM ********* SCOPE OF WORK: --------- LEVEL II INTERIOR ALTERATIONS --------- TO INCLUDE CAT I DEMOLITION OF EXISTING DRYWALL & FLOORING. ------- ELECTRICAL ------ NEW ELECTRICAL GEAR AND POWER TO ADDED RACKS. ADJUSTMENT TO FIRE SUPPRESSION SYSTEM, ETC TO ACCOMMODATE EXPANDED RACK ROOM. Reference BCCM-25-000914 AS PER PLANS AND AS PER CODE.May 23, 2025
BCCMscope of work: ------ level ii interior alterations -------- Renovation of existing west ticket office. Includes expansion into additional space for break space and entrance vestibule. as per plans and as per code. Reference BCCM-25-000913May 23, 2025
BCCMAuxiliary locker room in existing truck turn around. Approximately 600 SF new room built in existing service level. Room will be built from block walls and will include walkable roof with storage on top. Reference BCCM-25-000915May 19, 2025
COM2025SCOPE OF WORK: ----- ADDITION --------- NEW ADDITION/RENOVATION FOR THE WEST RETAIL BUILDING, THE TOTAL AREA OF WORK IS 5,400 SF. 2,400 SF OF ADDITION TO EXISTING M&T STADIUM AND ----- LEVEL II INTERIOR ALTERATIONS -------- 3,000 SF ASSOCIATED RENOVATION OF EXISTING STRUCTURE INSIDE THE STADIUM. ---- GRADING & PAVING ----- SITE WORK TO INCLUDE 9971 LOD, SIDEWALK, PAVING, GRADING, LANDSCAPING. ADDITION/RENOVATION TO INCLUDE STRUCTURAL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AS PER PLANS AS PER CODE. May 14, 2025
USE2024USE AS CONCESSION STAND #C 253-LST CLUB LEVEL LARGE BARMay 1, 2025
COM2025******** RENOVATION OF SIX (6) SUITES ON THE 3RD FLOOR OF THE STADIUM ************ SCOPE OF WORK: --------- LEVEL I INTERIOR ALTERATIONS ------- . THE RENOVATION WILL INCLUDE LEVEL I INTERIOR ALTERATIONS, CAT I DEMOLITION OF: EXISTING MILLWORK, FIXTURES AND PARTIAL WALLS. MINIMAL NEW WALLS/CONSTRUCTION. NEW FINISHES THROUGHOUT. NEW MILLWORK. NEW LIGHTING AND FIXTURES. NEW POWER AND PLUMBING AND TV'S. AS PER PLANS AS PER CODE. ******** SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEM. ****** Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance.Apr 9, 2025
COM2024SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS ------- CONSTRUCTION OF NEW KITCHEN ON THE 3RD FLOOR OF THE STADIUM, LEVEL II INTERIOR ALTERATIONS, MINOR DEMOLITION OF EXISTING DRYWALL & FLOORING. INSTALL NEW KITCHEN EQUIPMENT THROUGHOUT. NEW HOODS, GREASE DUCT & PLUMBING. NEW DOORS. NEW FINISHES THROUGHOUT. NEW ELECTRICAL, MECHANICAL, PLUMBING, FIRE SUPRESSION, ETC TO ACCOMODATE NEW KITCHEN. NEW STEEL AND CONCRETE. ALL WORK AS PER PLANS AS PER CODE.Apr 3, 2025
USE2024FULL-SERVICE KITCHEN LOCATED ON BLACK WING LEVELJan 28, 2025
USE2024USE AS CONCESSION STAND #C 150- FST KICKOFF CLASSICJan 28, 2025
USE2024USE AS CONCESSION STAND #C 201-LST CLUB LEVEL LARGE BARJan 28, 2025
COM2024INSTALL (3) # BRANCH CIRCUITS/FEEDERS AS PER CODE. PER 500 YEAR FLOODPLAIN: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 8 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 9.4 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (1.4 FT ABOVE NATURAL GRADE) OR BE MADE WATERTIGHT ACCORDING TO ASCE 24$7,000Jan 24, 2025
COM2024INSTALL (1) # BRANCH CIRCUITS/FEEDERS , (6) # FIXTURES/DEVICES, (1) # FIXTURES/DEVICES AS PER CODE.$5,000Jan 9, 2025
COM2024SCOPE OF WORK: ----- LEVEL II ALTERATIONS INTERIOR ---- RENOVATION OF EXISTING OFFICES ON THE SERVICE LEVEL OF THE STADIUM, WHICH INCLUDES THE FOLLOWING SCOPE OF WORK: LEVEL II INTERIOR ALTERATIONS - CATEGORY I DEMOLITION OF EXISTING FIXTURES, CEILINGS AND PARTIAL WALLS. NEW WALLS/CONSTRUCTION. NEW FINISHES THROUGHOUT. NEW MILLWORK. NEW DOORS. NEW LIGHTING AND FIXTURES. NEW PLUMBING, HVAC, PLUMBING, POWER AND TV'S. AS PER PLANS AS PER CODE.$1,000,000Dec 11, 2024
COM2024INSTALL (1) # BRANCH CIRCUITS/FEEDERS , (1) # FIXTURES/DEVICES AS PER CODE.****AS PER CHAP APWC: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 8 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 9.4 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (1.4 FT ABOVE GRADE) OR BE MADE WATERTIGHT ACCORDING TO ASCE 24$9,000Dec 2, 2024
COM2024INSTALL (3) # BRANCH CIRCUITS/FEEDERS , (12) # FIXTURES/DEVICES AS PER CODE.$5,000Dec 2, 2024
COM2024INSTALL (1) # FIXTURES/DEVICES AS PER CODE.$500Nov 22, 2024

Violations

1
KindCategoryStatusFineBalanceDate
citation *HE 6-502P$100$0Sep 3, 2025

Inspections

0

No inspections on record.

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.