Baltimore City · 21230
8 E CHURCHILL ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $183,500
- Land use
- Residential (R)
- Year built
- —
- Last sale
- Jan 18, 2012
Assessment
| Owner | SHUKIE, JOHN C |
|---|---|
| Land use | Residential (R) |
| Total assessment | $183,500 (cycle 2026) |
| Last sale | Jan 18, 2012 — $100,000 |
| Year built | — |
| Zoning | R-8 |
| Vacant | — |
Permits
6| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | PLUMBING REMODELING | $2,500 | Aug 21, 2025 |
| BRCM | install new lights and devices-2 circuits 63 fixtures | $3,500 | Aug 21, 2025 |
| BRCM | Ductwork for two rooms and a bathroom fan, along with the replacement of a 2-ton heat pump. | $5,000 | Aug 20, 2025 |
| BRCM | NEW PLUMBING WATER AND DRAIN FOR A FULL BATHROOM TUB, TOILET AND SINK | $2,500 | Aug 14, 2025 |
| BRCM | 26 recessed lights 8 switches 27 receptacles | $3,000 | Aug 14, 2025 |
| COM2024 | ADDING ADDITIONAL FINISHED SPACED TO AN EXISTING GARAGE/CARRIAGE HOUSE. Per Chap: ATP: APPROVED AS PER CHAP AUTHORIZATION TO PROCEED. CONSTRUCT ON THE 2ND FLOOR, AN ONE-STORY STUCCO ADDITION WITH A PAIRED 1/1 DOUBLE-HUNG VINYL WINDOW AND SIX-LIGHT DOOR ON THE FRONT FAÇADE WHICH WILL BE SET BACK MORE THAN FOUR FEET FROM THE CHURCHILL STREET FACADE. INSTALL GUTTERS AND DOWNSPOUT ON THE FRONT FAÇADE. AT THE 1ST FLOOR, REPLACE THE EXISTING GARAGE DOOR WITH ONE NEW 16-PANEL NON-INSULATED STEEL GARAGE DOOR. LOWER EXISTING 1ST FLOOR SCUPPER TO ACCOMMODATE NEW DRAINAGE, AT THE 2ND FLOOR. ON THE EXISTING CHURCHILL STREET FAÇADE, RETAIN EXISTING BRICK ROWLOCK AND INSET BRICK PANELS ABOVE GARAGE DOOR IN THEIR ENTIRETY. ON THE REAR ELEVATION THAT FACES THE COURTYARD, CONSTRUCT NEW BRICK WALL ON EXISTING BRICK WALL. MATCH THE NEW BRICK TO THE EXISTING BRICK AS CLOSELY AS POSSIBLE. INSTALL NEW BLACK DECORATIVE OUTDOOR WALL SCONCE(S) ADJACENT TO NEW GARAGE DOOR AND DOOR AT THE 2ND FLOOR. NEW WINDOWS, DOOR, AND GARAGE DOOR TO BE WHITE. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. | — | Mar 11, 2025 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Sanitation PropertyJun 30, 2026 · 82 m · 38 E MONTGOMERY ST
- violation: HCD-Sanitation PropertyJun 22, 2026 · 110 m
- violation: HCD-Illegal DumpingJun 17, 2026 · 107 m
- violation: SW-Dirty AlleyJun 12, 2026 · 129 m
- violation: HCD-Sanitation PropertyJun 9, 2026 · 115 m
- violation: HCD-Illegal DumpingJun 8, 2026 · 107 m · 45 E HENRIETTA ST
- violation: HCD-Sanitation PropertyJun 6, 2026 · 104 m · 43 E HENRIETTA ST
- violation: SW-Dirty AlleyJun 6, 2026 · 116 m · 20 W MONTGOMERY ST
- violation: HCD-Illegal DumpingJun 3, 2026 · 129 m · 900 LIGHT ST
- violation: HCD-Sanitation PropertyMay 22, 2026 · 65 m · 2 E MONTGOMERY ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.