Baltimore City · 21230
130 W CROSS ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $341,000
- Land use
- Residential (R)
- Year built
- 1900
- Last sale
- Aug 15, 2000
Assessment
| Owner | DAVIS, LINDA D. |
|---|---|
| Land use | Residential (R) |
| Total assessment | $341,000 (cycle 2026) |
| Last sale | Aug 15, 2000 — $105,000 |
| Year built | 1900 |
| Zoning | R-7 |
| Vacant | — |
Permits
3| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2023 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: REPLACE 3RD BATHROOM TUB, TUB/SHOWER DIVERTER, TOILET, SINK/VANITY COMBO. INSTALL NEW NON SLIP LAMINATE FLOORING. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $14,790 | Jan 19, 2023 |
| COM2020 | ELECTRICAL: INSTALL MOTION LIGHT @ BACK DOOR. EXTERIOR: REPAIR (35 SQ/FT)CONCRETE/BRICK @ FRONT ON PROPERTY & PAINT INTERIOR: REPAIR, FINISH AND PAINT (41 SQFT) OF GWB @ LIVING ROOM, 2ND FLR. BATH & REAR BEDROOM. 3RD FLR. BATH. REMOVE & INSTALL NEW HANDRAIL AND (2) STAIR TREAD @ 2ND-3RD FLR. STAIRS (MINIMUM HEIGHT OF HANDRAIL: 36''/NO STRUCTURAL ALTERATIONS TO BE DONE TO THE STAIRS). PLUMBING: REPLACE & INSTALL TOILET, BATHTUB, NEW DIVERTER W/HANDHELD SHOWER WAND. INSTALL (3) GRAB BARS @BATHTUB. INSTALL SLIP RESISTANT FLOOR @ BATHROOM FLOOR. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $14,700 | Dec 28, 2020 |
| COM2019 | per chaps:: at front: repaint masonry to match existing; remove and replace front door with solid wood 6-panel door (no glass) to match existing; replace gfic receptacle with weatherproof cover. at side: repaint masonry to match existing. at rear: remove and replace rear door with metal 6-panel door (no glass) to match existing; install a/c compressor unit. at roof: loose lay and heat seal bitumen single roof with new gutter and downspout. all work to be completed as per information/plans/specs in chap files. install (1) goodman 80,000 btu furnace. install (1) sealed battery co detector in furnace room. install new chimney liner to compensate furnace and water heater. | $19,200 | Mar 1, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Maintenance StructureJul 8, 2026 · 119 m
- violation: HCD-Sanitation PropertyJul 3, 2026 · 61 m · 101 W CROSS ST
- violation: SW-HGWJun 29, 2026 · 83 m · 1001 LEADENHALL ST
- violation: HCD-Sanitation PropertyJun 29, 2026 · 90 m · 119 W HAMBURG ST
- permit: BCCMJun 23, 2026 · 85 m · 101 W CROSS ST
- violation: HCD-Sanitation PropertyJun 22, 2026 · 83 m · 1001 LEADENHALL ST
- violation: HCD-Sanitation PropertyJun 6, 2026 · 61 m · 101 W CROSS ST
- permit: BCCMMay 29, 2026 · 83 m · 1001 LEADENHALL ST
- violation: HCD-Maintenance StructureMay 16, 2026 · 96 m · 20 W CROSS ST
- violation: HCD-Maintenance StructureMay 12, 2026 · 96 m · 20 W CROSS ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.