Baltimore City · 21230

11 W CROMWELL ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$65,755,700
Land use
Industrial (I)
Year built
Last sale
Jan 29, 2024

This owner holds 4 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerGS PORT COVINGTON APARTMENTS
Land useIndustrial (I)
Total assessment$65,755,700 (cycle 2026)
Last saleJan 29, 2024
Year built
ZoningPC-3
Vacant

Permits

14
TypeDescriptionCostIssued
BCCMFire alarm Installation in Area Of Refuge as per plans as per code.$10,000Jun 3, 2026
BCCMDAS Installation as per plans as per code.$15,000Apr 21, 2026
BUSEThis is for the use and occupancy of the entire West Building and would supersede the current Partial Use & Occupancy permit that has been issued for the 1st floor through 3rd floor. The passage ways to the pedestrian bridge would remain closed and locked as the pedestrian bridge would not open until the neighboring building residential areas receive Use and Occupancy. The Use & Occupancy would be for the entire 227 units of the West Building as well as all related corridors and back-of-house areas.Feb 27, 2026
BCCMInstallation of Canopy Mounted Channel Letter Signage on East Entrance and West Building Canopy Frontage$20,000Dec 1, 2025
BUSEThis is a partial use occupancy application for the 1st Floor through 3rd floor of the building for the use and occupancy of the residential units, garage, amenity, back-of-house and site areas. Includes 88 multifamily dwelling units. Access to the floors not included in this application will be blocked for non-construction personnel through the building security system locking access to the upper floors along with clear signage indicating which areas are for construction access only.Nov 20, 2025
COM2024AMEND PERMIT: ADD GAS, PLUMBING CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-01463:SCOPE OF WORK: -------NEW BUILDING----- CONSTRUCT 2 BUILDINGS: WEST BUILDING IS 5-STORY RESIDENTIAL "PODIUM" BUILDING ABOVE 1-STORY CONCRETE CONSTRUCTION INCLUDING PARKING. EAST BUILDING IS 5-STORY RESIDENTIAL "WRAPPER" BUILDING AROUND CONCRETE PARKING GARAGE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-01463) SCOPE OF WORK: -------NEW BUILDING----- CONSTRUCT 2 BUILDINGS: WEST BUILDING IS 5-STORY RESIDENTIAL "PODIUM" BUILDING ABOVE 1-STORY CONCRETE CONSTRUCTION INCLUDING PARKING. EAST BUILDING IS 5-STORY RESIDENTIAL "WRAPPER" BUILDING AROUND CONCRETE PARKING GARAGE AS PER PLANS AS PER CODE.$1,000Sep 26, 2025
COM2024FIRE ALARM INSTALLATION AS PER PLANS AS PER CODE.Aug 19, 2025
BCCMSCOPE OF WORK: ------- SIGNAGE -------- Install 1 illuminated roof top sign. AS PER PLAN AND AS PER CODE.$5,000Jul 28, 2025
COM2024[11 W CROMWELL ST] VSC TO INSTALL NEW STANDPIPE SYSTEMS, DRY SYSTEM AND FIRE PUMP TO A NEW RESIDENTIAL APARTMENT BUILDING. BUILDING CONSISTS OF (1) LEVEL OF PARKING GARAGE AND (5) LEVELS OF RESIDENTIAL LIVING SPACE. VSC TO BEGIN WORK AFTER BACKFLOW AS PER PLANS AS PER CODE.Apr 26, 2025
COM2024INSTALL (681) # LOW VOLTAGE AS PER CODE.***PER DOP: THE SITE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 8 FT AND THE FLOOD PROTECTION ELEVATION IS 9.4 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FLOOD PROTECTION ELEVATION (1.4 FT ABOVE GRADE) OR BE MADE WATERTIGHT ACCORDING TO ASCE 24.$350,052Sep 11, 2024
COM2024AMEND PERMIT: ADD MECHANICAL CONTRACTOR . (ORIGINAL PERMIT:COM2023-01463:SCOPE OF WORK: -------NEW BUILDING----- CONSTRUCT 2 BUILDINGS: WEST BUILDING IS 5-STORY RESIDENTIAL ''PODIUM'' BUILDING ABOVE 1-STORY CONCRETE CONSTRUCTION INCLUDING PARKING. EAST BUILDING IS 5-STORY RESIDENTIAL ''WRAPPER'' BUILDING AROUND CONCRETE PARKING GARAGE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-01463) SCOPE OF WORK: -------NEW BUILDING----- CONSTRUCT 2 BUILDINGS: WEST BUILDING IS 5-STORY RESIDENTIAL ''PODIUM'' BUILDING ABOVE 1-STORY CONCRETE CONSTRUCTION INCLUDING PARKING. EAST BUILDING IS 5-STORY RESIDENTIAL ''WRAPPER'' BUILDING AROUND CONCRETE PARKING GARAGE AS PER PLANS AS PER CODE.Feb 8, 2024
COM2024AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2023-01463:SCOPE OF WORK: -------NEW BUILDING----- CONSTRUCT 2 BUILDINGS: WEST BUILDING IS 5-STORY RESIDENTIAL ''PODIUM'' BUILDING ABOVE 1-STORY CONCRETE CONSTRUCTION INCLUDING PARKING. EAST BUILDING IS 5-STORY RESIDENTIAL ''WRAPPER'' BUILDING AROUND CONCRETE PARKING GARAGE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-01463) SCOPE OF WORK: -------NEW BUILDING----- CONSTRUCT 2 BUILDINGS: WEST BUILDING IS 5-STORY RESIDENTIAL ''PODIUM'' BUILDING ABOVE 1-STORY CONCRETE CONSTRUCTION INCLUDING PARKING. EAST BUILDING IS 5-STORY RESIDENTIAL ''WRAPPER'' BUILDING AROUND CONCRETE PARKING GARAGE AS PER PLANS AS PER CODE.Jan 4, 2024
COM2023SCOPE OF WORK: -------NEW BUILDING----- CONSTRUCT 2 BUILDINGS: WEST BUILDING IS 5-STORY RESIDENTIAL ''PODIUM'' BUILDING ABOVE 1-STORY CONCRETE CONSTRUCTION INCLUDING PARKING. EAST BUILDING IS 5-STORY RESIDENTIAL ''WRAPPER'' BUILDING AROUND CONCRETE PARKING GARAGE AS PER PLANS AS PER CODE.$61,750,000Dec 21, 2023
COM2022DEMOLITION AND MASS GRADING OF 1.46 ACRES, UTILITY INSTALLATION, ALL WORK WITHIN PRIVATE PROPERTY AS PER PLANS AS PER CODE.$500,000Feb 2, 2023

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.