Baltimore City · 21230
454 E FORT AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $267,300
- Land use
- Commercial (C)
- Year built
- 1900
- Last sale
- Feb 24, 2022
Assessment
| Owner | MARYLAND FAMILY ASSET MANAGEMENT |
|---|---|
| Land use | Commercial (C) |
| Total assessment | $267,300 (cycle 2026) |
| Last sale | Feb 24, 2022 — $280,000 |
| Year built | 1900 |
| Zoning | C-1 |
| Vacant | — |
Permits
15| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2023 | SCOPE OF WORK: ------ INTERIOR ALTERATIONS ---- BUILD 22 UNDERPINNINGS LOWERING THE HEIGHT WITH THE PURPOSE OF LOWER THE EXISTING 5FT H CEILINGS TO A 8FT H STANDARD CEILING. AS PER PLANS AND AS PER CODE. | $30,000 | Feb 21, 2024 |
| USE2023 | USE FIRST FLOOR OF THE PREMISES AS AN OFFICE USE ONLY | — | Jan 23, 2024 |
| USE2024 | USE SECOND FLOOR FOR/AS ONE DWELLING UNIT. | — | Jan 17, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2023-63310:INTERIOR WORK RENOVATION THAT INCLUDES: IN SECOND FLOOR TO BE ADD NEW BATHROOMS, KITCHEN ONE BEDROOM, REPLACE FRAMING JOIST IN CEILING, FRAMING PERIMETER WALLS, PARTITIONS WALL, INSTALL 1 HR. FIRE RATED OF 5/8 GWB RATED BOARDS IN PARTY WALL AND 4 FT OF FIRE RATED BOARD FROM THE PARTY WALL IN THE CEILING ROOF IN SECOND FLOOR. FIRST FLOOR ADD 1 HR OF FIRE RATED BOARD THROUGHOUT. NEW INSULATION R-21 TO INSTALL IN WALLS, R-49 INSULATION IN SECOND FLOOR CEILING. -NEW DRYWALL INSTALL THROUGHOUT THE SECOND FLOOR. -NEW FLO0RING LVT, PAINTING THROUGHOUT. AS PER PLANS AND AS PER CODE.) Original Permit Description:(COM2023-63310) INTERIOR WORK RENOVATION THAT INCLUDES: IN SECOND FLOOR TO BE ADD NEW BATHROOMS, KITCHEN ONE BEDROOM, REPLACE FRAMING JOIST IN CEILING, FRAMING PERIMETER WALLS, PARTITIONS WALL, INSTALL 1 HR. FIRE RATED OF 5/8 GWB RATED BOARDS IN PARTY WALL AND 4 FT OF FIRE RATED BOARD FROM THE PARTY WALL IN THE CEILING ROOF IN SECOND FLOOR. FIRST FLOOR ADD 1 HR OF FIRE RATED BOARD THROUGHOUT. NEW INSULATION R-21 TO INSTALL IN WALLS, R-49 INSULATION IN SECOND FLOOR CEILING. -NEW DRYWALL INSTALL THROUGHOUT THE SECOND FLOOR. -NEW FLO0RING LVT, PAINTING THROUGHOUT. AS PER PLANS AND AS PER CODE. | — | Jan 11, 2024 |
| COM2023 | INSTALL (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # ELECTRIC WATER HEATER, (9) # PLUMBING FIXTURES AS PER CODE. | $3,000 | Aug 23, 2023 |
| COM2023 | SCOPE OF WORK: ------ INTERIOR ALTERATIONS ----- INTERIOR RENOVATION WORK THAT INCLUDES: TO INSTALL NEW 1 HR. 5/8IN X 4FT X 8FT CEILINGS & PARTY WALLS FIRE RATED DRYWALL BOARDS LAYER THROUGHOUT, FULL PAINTING, NEW LVT FLOORINGS, NEW INTERIOR DOORS, EXISTING 1/2 HALF BATH RENOVATION THAT INCLUDES: NEW TOILET, VANITY. AS PER CODE. | $10,000 | Aug 3, 2023 |
| COM2023 | INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (8) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE (<=600V), (22) # FIXTURES/DEVICES AS PER CODE. | $2,000 | Jul 25, 2023 |
| COM2023 | INSTALL (15) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $5,000 | Jul 18, 2023 |
| COM2023 | INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 70000 BTU FUEL-BURNING EQUIP(FURNACE), (1) 1000 CFM NEW DISTRIBUTION SYSTEM (OTHER THAN 1-2 FAMILY ), (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 1000 CFM NEW DISTRIBUTION SYSTEM (OTHER THAN 1-2 FAMILY ) AS PER CODE. | $10,000 | Jun 19, 2023 |
| COM2023 | INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 70000 BTU FUEL-BURNING EQUIP(FURNACE), (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP AS PER CODE. | $10,000 | Jun 8, 2023 |
| COM2023 | INTERIOR WORK RENOVATION THAT INCLUDES: IN SECOND FLOOR TO BE ADD NEW BATHROOMS, KITCHEN ONE BEDROOM, REPLACE FRAMING JOIST IN CEILING, FRAMING PERIMETER WALLS, PARTITIONS WALL, INSTALL 1 HR. FIRE RATED OF 5/8 GWB RATED BOARDS IN PARTY WALL AND 4 FT OF FIRE RATED BOARD FROM THE PARTY WALL IN THE CEILING ROOF IN SECOND FLOOR. FIRST FLOOR ADD 1 HR OF FIRE RATED BOARD THROUGHOUT. NEW INSULATION R-21 TO INSTALL IN WALLS, R-49 INSULATION IN SECOND FLOOR CEILING. -NEW DRYWALL INSTALL THROUGHOUT THE SECOND FLOOR. -NEW FLO0RING LVT, PAINTING THROUGHOUT. AS PER PLANS AND AS PER CODE. | $70,000 | May 18, 2023 |
| COM2022 | INSTALL (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY) AS PER CODE. | $0 | Nov 30, 2022 |
| COM2022 | INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP AS PER CODE. | $0 | Nov 1, 2022 |
| COM2022 | INSTALL (9) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE, NEW INTERIOR, (1) # ELECTRIC WATER HEATER, (1) # SANITARY CONNECTION, NEW INTERIOR, (1) 45000 BTU FUEL-BURNING EQUIP AS PER CODE. | $3,500 | Apr 12, 2022 |
| COM2022 | INSTALL (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (12) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $1,600 | Mar 17, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 1, 2026 · 138 m · 1400 JACKSON ST
- permit: BRCMJun 30, 2026 · 88 m · 421 E FORT AVE
- violation: HCD-Sanitation PropertyJun 29, 2026 · 110 m · 1501 BELT ST
- permit: BUSEJun 24, 2026 · 101 m · 525 E FORT AVE
- violation: SW-Dirty AlleyJun 22, 2026 · 85 m
- permit: BRCMJun 22, 2026 · 138 m · 1400 JACKSON ST
- permit: BRCMJun 17, 2026 · 96 m · 1513 HENRY ST
- permit: BRCMJun 16, 2026 · 109 m · 406 E FORT AVE
- permit: BRCMJun 8, 2026 · 122 m · 1416 JACKSON ST
- violation: HCD-Vacant BuildingJun 5, 2026 · 143 m · 1500 JACKSON ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.