Baltimore City · 21230
1128 HULL ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $612,400
- Land use
- Residential (R)
- Year built
- 1900
- Last sale
- Mar 21, 2024
Assessment
| Owner | NAENY, EVELYN ALDEN |
|---|---|
| Land use | Residential (R) |
| Total assessment | $612,400 (cycle 2026) |
| Last sale | Mar 21, 2024 — $610,000 |
| Year built | 1900 |
| Zoning | R-8 |
| Vacant | — |
Permits
9| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2023 | USE AS A SINGLE FAMILY DWELLING | — | Jan 4, 2024 |
| COM2023 | Extend Original Permit.(original permit:COM2023-61516:SCOPE OF WORK:------ADDITION-----NEW 2ND FLOOR REAR ADDITION (23’X11’-6”(265 SF)-----EXTERIOR ALTERATIONS---- NEW ROOFTOP DECK (23’ X 16'), NEW EXTERIOR DOORS (1), WINDOWS (4).----INTERIOR ALTERATIONS-----NEW DEMO WORK: CATEGORY 2 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. DEMO EXISTING 2ND FLOOR REAR WALL & ROOF. NEW FLOOR & ROOF JOISTS PER PLANS. NEW INTERIOR WORK TO INCLUDE: FRAMING (300 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (17). NEW INTERIOR STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS TO ROOF. CEILING INSULATION TO BE R-49 AS PER PLANS, AS PER CODE. ) Original Permit Description:(COM2023-61516) SCOPE OF WORK:------ADDITION-----NEW 2ND FLOOR REAR ADDITION (23’X11’-6”(265 SF)-----EXTERIOR ALTERATIONS---- NEW ROOFTOP DECK (23’ X 16'), NEW EXTERIOR DOORS (1), WINDOWS (4).----INTERIOR ALTERATIONS-----NEW DEMO WORK: CATEGORY 2 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. DEMO EXISTING 2ND FLOOR REAR WALL & ROOF. NEW FLOOR & ROOF JOISTS PER PLANS. NEW INTERIOR WORK TO INCLUDE: FRAMING (300 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (17). NEW INTERIOR STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS TO ROOF. CEILING INSULATION TO BE R-49 AS PER PLANS, AS PER CODE. | — | Dec 18, 2023 |
| COM2023 | INSTALL (1) 54000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 100000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $9,800 | Jun 9, 2023 |
| COM2023 | INSTALL (16) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $2,000 | Jun 5, 2023 |
| COM2023 | INSTALL (17) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) # WATER SERVICE PIPE, NEW INTERIOR, (1) # SANITARY CONNECTION, NEW INTERIOR, (1) 65000 BTU FUEL-BURNING EQUIP, (1) 85000 BTU FUEL-BURNING EQUIP AS PER CODE. | $5,000 | May 31, 2023 |
| COM2023 | SCOPE OF WORK:------ADDITION-----NEW 2ND FLOOR REAR ADDITION (23’X11’-6”(265 SF)-----EXTERIOR ALTERATIONS---- NEW ROOFTOP DECK (23’ X 16'), NEW EXTERIOR DOORS (1), WINDOWS (4).----INTERIOR ALTERATIONS-----NEW DEMO WORK: CATEGORY 2 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. DEMO EXISTING 2ND FLOOR REAR WALL & ROOF. NEW FLOOR & ROOF JOISTS PER PLANS. NEW INTERIOR WORK TO INCLUDE: FRAMING (300 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (17). NEW INTERIOR STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS TO ROOF. CEILING INSULATION TO BE R-49 AS PER PLANS, AS PER CODE. | $30,000 | Apr 21, 2023 |
| COM2023 | DEMO WORK: CATEGORY 2 DEMO (500 SF) OF NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ NEW ROOF JOISTS, STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE), DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (11). NEW EXTERIOR WORK: NEW EXTERIOR DOORS (2), WINDOWS (6). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) | $50,000 | Mar 3, 2023 |
| BMZ2023 | construct addition at 2nd floor rear. | — | Jan 30, 2023 |
| COM2023 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY I) DEMOLITION: INTERIOR CLEAN OUT OF TRASH AND DEBRIS.REMOVAL OF NON STRUCTURAL WALLS THAT ARE FALLING DOWN WITH DAMAGED DRYWALL AND STUDS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *THIS PERMIT IS FOR INTERIOR DEMOLITION ONLY, SEPARATE PERMIT WILL BE PULLED FOR ANY INTERIOR RENOVATIONS/TENANT FITOUT | $8,000 | Jan 23, 2023 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJun 30, 2026 · 62 m · 1135 HULL ST
- permit: BRCMJun 17, 2026 · 113 m · 1210 HULL ST
- violation: HCD-Sanitation PropertyJun 16, 2026 · 55 m · 1154 HULL ST
- violation: SW-Dirty AlleyMay 28, 2026 · 109 m · 1209 HULL ST
- violation: HCD-Zoning InvestigationMay 27, 2026 · 35 m
- violation: PM 306.1May 22, 2026 · 132 m · 1216 HULL ST
- violation: HCD-Sanitation PropertyMay 10, 2026 · 128 m · 1216 HULL ST
- violation: PM 305.2.2May 6, 2026 · 46 m · 1143 HAUBERT ST
- violation: HCD-Illegal DumpingMay 6, 2026 · 98 m · 1203 HULL ST
- permit: BCCMApr 28, 2026 · 131 m · 1216 HULL ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.