Baltimore City · 21230
1117 HAUBERT ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $202,800
- Land use
- Residential (R)
- Year built
- 1890
- Last sale
- Mar 17, 2021
Assessment
| Owner | KUKICH, ALEXANDER |
|---|---|
| Land use | Residential (R) |
| Total assessment | $202,800 (cycle 2026) |
| Last sale | Mar 17, 2021 — $122,500 |
| Year built | 1890 |
| Zoning | R-8 |
| Vacant | — |
Permits
10| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2021 | USE AS A SINGLE-FAMILY DWELLING. | — | Oct 1, 2021 |
| COM2021 | INSTALL (1) 70000 BTU AIR-CON SYSTEM, HEAT PUMP AS PER CODE. | $5,000 | Jul 1, 2021 |
| COM2021 | INSTALL (1) # ELECTRIC WATER HEATER, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (10) # PLUMBING FIXTURES, (1) # GAS TEST, (2) 130 BTU FUEL-BURNING EQUIP AS PER CODE. | $7,500 | Jul 1, 2021 |
| COM2021 | INSTALL (22) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (10) # LOW VOLTAGE AS PER CODE. | $4,000 | Jun 29, 2021 |
| COM2021 | INSTALL (1) 70000 BTU AIR-CON SYSTEM, HEAT PUMP AS PER CODE. | $5,000 | Jun 28, 2021 |
| COM2021 | Extend Original Permit.(original permit:COM2021-00087:SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: NON-STRUCTURAL DEMO & REMOVAL OF PLASTER, DRYWALL, WINDOWS, DOORS, NON-BEARING WALLS, ROOFING & FLOOR MATERIAL, & REMOVAL OF DEBRIS AND EQUIP. REMOVE FIRST AND SECOND FLOOR REAR WALL. REMOVE FLOOR JOISTS FOR NEW STAIRS’ FRAMING. NEW FIRST FLOOR REAR ADDITION. (12’-0'' X 13’-8”), NEW SECOND FLOOR ADDITION. (12’-0'' X 28’-8”) & NEW ROOF TOP DECK. (12'-0''X 16'-0'') PER BMZA2020-209, NEW INTERIOR FRAMING & DRYWALL (2X4STUDS AT 16''O.C.) FOR BASEMENT, 1ST & 2ND FLOOR. NEW 3'-0'' WIDE INTERIOR STAIRS (7.75''MAX RISERS & 10'' MIN. TREADS) AND HANGERS. NEW FLOOR FINISHING, NEW INTERIOR DOORS(14), NEW EXTERIOR DOORS(3), NEW WINDOWS(7), NEW SIDINGS AND NEW RUBBER ROOF OVER EXISTING ROOF. EXISTING WINDOWS AND DOORS SAME SIZES AND LOCATIONS. NEW CONCRETE REAR YARD. NEW INSULATION (R49 FOR ROOF, R21 FOR EXTERIOR WALLS). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.), (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN A CEILING HEIGHT OF 7', 2. ALL HALLWAYS/STAIRCASE WILL MAINTAIN A 36''MIN WIDTH, 3. ALL BEDROOMS WILL MAINTAIN 70SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT IF MORE THAN 1, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF FIXTURES, 5. ROOF TOP DECK WILL MAINTAIN SETBACK OF 8'/2'MAX AT PLANE MIDPOINT ON ROOF LINE, 6. ADDITION WILL MAINTAIN PROPER FIRE RELATING/NO OPENINGS WITHIN 5' OF PROPERTY LINE, 7. ALL WORK WILL BE DONE WITHIN PROPERTY LINES OF 1117 HAUBERT)) Original Permit Description:(COM2021-00087) SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: NON-STRUCTURAL DEMO & REMOVAL OF PLASTER, DRYWALL, WINDOWS, DOORS, NON-BEARING WALLS, ROOFING & FLOOR MATERIAL, & REMOVAL OF DEBRIS AND EQUIP. REMOVE FIRST AND SECOND FLOOR REAR WALL. REMOVE FLOOR JOISTS FOR NEW STAIRS’ FRAMING. NEW FIRST FLOOR REAR ADDITION. (12’-0'' X 13’-8”), NEW SECOND FLOOR ADDITION. (12’-0'' X 28’-8”) & NEW ROOF TOP DECK. (12'-0''X 16'-0'') PER BMZA2020-209, NEW INTERIOR FRAMING & DRYWALL (2X4STUDS AT 16''O.C.) FOR BASEMENT, 1ST & 2ND FLOOR. NEW 3'-0'' WIDE INTERIOR STAIRS (7.75''MAX RISERS & 10'' MIN. TREADS) AND HANGERS. NEW FLOOR FINISHING, NEW INTERIOR DOORS(14), NEW EXTERIOR DOORS(3), NEW WINDOWS(7), NEW SIDINGS AND NEW RUBBER ROOF OVER EXISTING ROOF. EXISTING WINDOWS AND DOORS SAME SIZES AND LOCATIONS. NEW CONCRETE REAR YARD. NEW INSULATION (R49 FOR ROOF, R21 FOR EXTERIOR WALLS). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.), (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN A CEILING HEIGHT OF 7', 2. ALL HALLWAYS/STAIRCASE WILL MAINTAIN A 36''MIN WIDTH, 3. ALL BEDROOMS WILL MAINTAIN 70SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT IF MORE THAN 1, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF FIXTURES, 5. ROOF TOP DECK WILL MAINTAIN SETBACK OF 8'/2'MAX AT PLANE MIDPOINT ON ROOF LINE, 6. ADDITION WILL MAINTAIN PROPER FIRE RELATING/NO OPENINGS WITHIN 5' OF PROPERTY LINE, 7. ALL WORK WILL BE DONE WITHIN PROPERTY LINES OF 1117 HAUBERT) | — | Jun 21, 2021 |
| COM2021 | INSTALL (14) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 35000 BTU FUEL-BURNING EQUIP, (1) 75000 BTU FUEL-BURNING EQUIP, (1) 199000 BTU FUEL-BURNING EQUIP AS PER CODE. | $500 | Apr 20, 2021 |
| COM2021 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: UNDERPINNING OF EXISTING BASEMENT AREAS 55’-6”X 11'-2''. EXISTING BASEMENT HEIGHT IS 5'-0'' AND NEW HEIGHT SHALL BE 7'-7''. ''UNDERPINNING OF FOUNDATION WALLS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION'' ALL WORK SHALL BE IN ACCORDANCE WITH BALTIMORE CITY BUILDING CODES AND PER SUBMITTED PLANS. | $12,000 | Mar 25, 2021 |
| COM2021 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: NON-STRUCTURAL DEMO & REMOVAL OF PLASTER, DRYWALL, WINDOWS, DOORS, NON-BEARING WALLS, ROOFING & FLOOR MATERIAL, & REMOVAL OF DEBRIS AND EQUIP. REMOVE FIRST AND SECOND FLOOR REAR WALL. REMOVE FLOOR JOISTS FOR NEW STAIRS’ FRAMING. NEW FIRST FLOOR REAR ADDITION. (12’-0'' X 13’-8”), NEW SECOND FLOOR ADDITION. (12’-0'' X 28’-8”) & NEW ROOF TOP DECK. (12'-0''X 16'-0'') PER BMZA2020-209, NEW INTERIOR FRAMING & DRYWALL (2X4STUDS AT 16''O.C.) FOR BASEMENT, 1ST & 2ND FLOOR. NEW 3'-0'' WIDE INTERIOR STAIRS (7.75''MAX RISERS & 10'' MIN. TREADS) AND HANGERS. NEW FLOOR FINISHING, NEW INTERIOR DOORS(14), NEW EXTERIOR DOORS(3), NEW WINDOWS(7), NEW SIDINGS AND NEW RUBBER ROOF OVER EXISTING ROOF. EXISTING WINDOWS AND DOORS SAME SIZES AND LOCATIONS. NEW CONCRETE REAR YARD. NEW INSULATION (R49 FOR ROOF, R21 FOR EXTERIOR WALLS). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.), (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN A CEILING HEIGHT OF 7', 2. ALL HALLWAYS/STAIRCASE WILL MAINTAIN A 36''MIN WIDTH, 3. ALL BEDROOMS WILL MAINTAIN 70SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT IF MORE THAN 1, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF FIXTURES, 5. ROOF TOP DECK WILL MAINTAIN SETBACK OF 8'/2'MAX AT PLANE MIDPOINT ON ROOF LINE, 6. ADDITION WILL MAINTAIN PROPER FIRE RELATING/NO OPENINGS WITHIN 5' OF PROPERTY LINE, 7. ALL WORK WILL BE DONE WITHIN PROPERTY LINES OF 1117 HAUBERT) | $90,000 | Jan 11, 2021 |
| BMZ2020 | construct a two-story rear addition (1st floor 12' x 13'-8", 2nd floor 12' x 28'-8") and a rooftop deck (12' x 16'). | — | Oct 16, 2020 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJun 30, 2026 · 93 m · 1135 HULL ST
- permit: BRCMJun 17, 2026 · 136 m · 1210 HULL ST
- violation: HCD-Sanitation PropertyJun 16, 2026 · 81 m · 1154 HULL ST
- violation: SW-Dirty AlleyMay 28, 2026 · 137 m · 1209 HULL ST
- violation: HCD-Zoning InvestigationMay 27, 2026 · 35 m
- violation: PM 305.2.2May 6, 2026 · 60 m · 1143 HAUBERT ST
- violation: HCD-Illegal DumpingMay 6, 2026 · 127 m · 1203 HULL ST
- violation: HCD-Sanitation PropertyApr 27, 2026 · 60 m · 1143 HAUBERT ST
- violation: PM 305.9Feb 13, 2026 · 124 m · 1201 HAUBERT ST
- violation: 13 4-5Jan 20, 2026 · 117 m · 1152 COOKSIE ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.