Baltimore City · 21225
3001 S HANOVER ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $103,744,700
- Land use
- Commercial (C)
- Year built
- 1978
- Last sale
- Jun 29, 1959
Assessment
| Owner | SOUTH BALTIMORE GENERAL HOSPITAL |
|---|---|
| Land use | Commercial (C) |
| Total assessment | $103,744,700 (cycle 2026) |
| Last sale | Jun 29, 1959 |
| Year built | 1978 |
| Zoning | H |
| Vacant | — |
Permits
showing 50 of 78| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | SCOPE OF WORK: ------ EXTERIOR ALTERATIONS ----- - (1) Install 12'-0" X 18'-0" steel platform on roof. - (2) Install equipment cabinets on proposed platform. - (3) Install 2 roof penetrating mounts. - (4) Install 6 antennas. - (5) Install 9 RRHs. - (6) Install 2 NEMA boxes.- (7) Install 4 slack boxes. - (8) Install 1 DC50. - (9) Install components supporting antennas' operation AS PER PLANS AND AS PER CODE. | $345 | Jun 8, 2026 |
| COM2023 | INSTALLATION OF (2) NEW NOVEC 1230 FIRE SUPPRESSION SYSTEM TO PROTECT FILING 425 & HUDDLE 427 ROOMS AT PAREXEL. THIS SYSTEM WILL UTILIZE ONE CONTROL PANEL TO ALLOW FOR SPERATE ZONING OF EACH SPACE. MAX PIPE SIZE USED WILL BE 1-1/4". TOTAL OF (2) NOZZLES AS PER PLANS AS PER CODE. | — | Sep 24, 2025 |
| COM2024 | SGCOPE OF WORK: --------- GRADING ----- ASSOCIATED WITH: APPROXIMATELY 9.3 AC OF TIDAL WETLANDS AND A GRAVEL SHORELINE IMMEIDATELY OFFSHORE OF MEDSTAR HARBOR HOSPITAL. THE PROPOSED WETLAND WILL COVER CREATE NEW LOW MARSH, HIGH MARSH, SUPRATIDAL AREAS. ANY INVASIVE PHRAGMITES AND LITTER THAT IS CURRENTLY PRESENT AT THE PROJECT SITE WILL BE REMOVED AS PER PLANS AS PER CODE. ******(THE PROJECT IS PART OF THE GREATER REIMAGINE MIDDLE BRANCH AND MIDDLE BRANCH RESILIENCY INITIATIVE, A COMMUNITY-DRIVEN INITIATIVE TO CONNECT SOUTH BALTIMORE TO THE SHORELINE. PROJECT GOALS INCLUDE: 1) RESTORING DEGRADED MARSH, 2) HABITAT CREATION, AND 3) IMPROVING WATER QUALITY) ********* | — | Jun 17, 2025 |
| COM2024 | WORK CONSISTS OF MODIFYING THE EXISTING WET FIRE SPRINKLER SYSTEM BY ADDING 9, RELOCATING 35, AND PLUGGING FIRE SPRINKLER TO ACCOMMODATE THE NEW INTERIOR ALTERATIONS. ALL WORK SHALL CONFORM TO THE REGULATIONS OF NFPA 13-2016 AND BALTIMORE CITY FIRE CODE. PLANS AND EQUIPMENT SUBMITTAL PROVIDED. AS PER PLANS AS PER CODE. | $25,500 | Jan 23, 2025 |
| COM2024 | INSTALL FIRE ALARM AS PER PLANS AS PER CODE. | $9,050 | Dec 19, 2024 |
| COM2024 | INSTALL (53) # LOW VOLTAGE AS PER CODE. | $7,600 | Nov 6, 2024 |
| COM2024 | AZIMUTH CHANGES/REQUIRES ANTENNA MOUNT MODIFICATION AS PER PLANS AS PER CODE. IF INSTALLING SUPPRESSION SYSTEM IN EQUIPMENT CABINET, THEN SEPARATE PERMIT IS REQUIRED. | $15,000 | Oct 23, 2024 |
| COM2024 | INSTALL (33) # LOW VOLTAGE AS PER CODE. | $12,000 | Sep 23, 2024 |
| COM2024 | RENOVATION OF AN EXISTING SPECIAL CARE NURSERY TO INCLUDE FIVE DOUBLE OCCUPANCY, AND ASSOCIATED SUPPORT SPACES. INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, INTERIOR DOORS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, AND LOW VOLTAGE. AS PER PLANS AS PER CODE. | $1,817,700 | Aug 22, 2024 |
| COM2024 | AMEND COM2023-03465 PLANS 2023-2863 FIRE SUPPRESSION ISSUED 2/7/24 SIZE OF RANGE CHANGED AS PER PLANS AS PER CODE. | $500 | May 22, 2024 |
| COM2024 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-01008:INSTALL FIRE ALARM AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-01008) INSTALL FIRE ALARM AS PER PLANS AS PER CODE. | — | May 16, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2023-57557:INSTALL (484) # LOW VOLTAGE AS PER CODE.) Original Permit Description:(COM2023-57557) INSTALL (484) # LOW VOLTAGE AS PER CODE. | — | Apr 2, 2024 |
| USE2023 | USE ADDITION TO EXISTING MEDSTAR HARBOR HOSPITAL AS AN IMAGING SUITE HOUSING A 7T MRI, CONTROL ROOM FOR MONITORING MRI OPERATIONS, AN EQUIPMENT ROOM TO HOUSE ALL PERTINENT EQUIPMENT TO THE FUNCTIONALITY OF THE SPACE, A PATIENT WAITING ROOM, A BATHROOM, AND A MECHANICAL ROOM FOR PLUMBING ITEMS SUCH AS A SEWAGE EJECTION PIT. | — | Feb 11, 2024 |
| COM2024 | INSTALL (70) # LOW VOLTAGE AS PER CODE. *NOT FIRE ALARM RELATED | $9,000 | Feb 8, 2024 |
| COM2023 | RE PIPE EXISTING WET CHEMICAL FIRE SYSTEM FOR NEW FRYERS AS PER PLANS AS PER CODE. | $3,240 | Feb 7, 2024 |
| COM2023 | AIR SAMPLING SMOKE DETECTION SYSTEM, PROVIDING AND INSTALLING ALL EQUIPMENT FOR A NEW AIR SAMPLING SMOKE DETECTION SYSTEM. THIS INCLUDES A VESDA DETECTOR, POWER SUPPLY, AND ASSOCIATED PIPING. THE 120VAC POWER FOR THE POWER SUPPLY IS TO BE PROVIDED BY ANOTHER CONTRACTOR, THE PRE-ACTION SYSTEM WILL MONITOR THE VESDA DETECTOR FOR ALERT, ACTION, FIRE1, FIRE2, AND TROUBLE. THE WIRING AND PROGRAMMING OF THE BASE BUILDING FIRE ALARM SYSTEM, INCLUDING MODIFICATION OF THE BASE BUILDING ANNUNCIATOR IF APPLICABLE, IS TO BE PROVIDED BY ANOTHER CONTRACTOR AS PER PLANS AS PER CODE. | $53,980 | Dec 27, 2023 |
| COM2023 | TAPPING INTO THE EXISTING WET PIPE SYSTEM TO RUN A NEW MAIN TO PROVIDE A NEW TOTALPAC SYSTEM (56 HEADS) FOR THE NEW MRI BUILDING ADDITION AS PER PLANS AS PER CODE. | $53,980 | Dec 5, 2023 |
| COM2023 | INSTALL (3) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $219,240.67 | Nov 27, 2023 |
| COM2023 | MODIFY EXISTING WET FIRE SPRINKLER SYSTEM BY ADDING 8 AND RELOCATING 43 SPRINKLERS TO ACCOMODATE NEW INT ALT. ALL WORK SHALL BE UNDER NFPA 13-2016 AS PER PLANS PER CODE. TOTAL AREA OF WORK 21894 FT². MIXED LIGHT AND ORDINARY HAZARD OCCUPANCIES (MATCH EXISTING) AS PER PLANS AS PER CODE. | $67,000 | Nov 16, 2023 |
| COM2023 | INSTALL (5) # LOW VOLTAGE AS PER CODE. | $29,000 | Oct 6, 2023 |
| COM2023 | INSTALL (10) # LOW VOLTAGE AS PER CODE. | $7,286.54 | Sep 26, 2023 |
| COM2023 | INSTALL FIRE ALARM AS PER PLANS AS PER CODE. | $30,120 | Aug 18, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2023-57557:INSTALL (484) # LOW VOLTAGE AS PER CODE.) Original Permit Description:(COM2023-57557) INSTALL (484) # LOW VOLTAGE AS PER CODE. | — | Aug 10, 2023 |
| COM2023 | FIRE ALARM AS PER PLANS AS PER CODE. | $6,505 | Aug 10, 2023 |
| COM2023 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2022-01817:REMOVE 12 EXISTING ANTENNAS. REMOVE 6 EXISTING RRH'S. INSTALL 8 PROPOSED ANTENNAS. INSTALL 9 PROPOSED RRH'S AS PER PLANS AS PER CODE. IF INSTALLING SUPPRESSION SYSTEM IN EQUIPMENT CABINET, THEN SEPARATE PERMIT IS REQUIRED.) Original Permit Description:(COM2022-01817) REMOVE 12 EXISTING ANTENNAS. REMOVE 6 EXISTING RRH'S. INSTALL 8 PROPOSED ANTENNAS. INSTALL 9 PROPOSED RRH'S AS PER PLANS AS PER CODE. IF INSTALLING SUPPRESSION SYSTEM IN EQUIPMENT CABINET, THEN SEPARATE PERMIT IS REQUIRED. | — | Jul 13, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2022-01817:REMOVE 12 EXISTING ANTENNAS. REMOVE 6 EXISTING RRH'S. INSTALL 8 PROPOSED ANTENNAS. INSTALL 9 PROPOSED RRH'S AS PER PLANS AS PER CODE. IF INSTALLING SUPPRESSION SYSTEM IN EQUIPMENT CABINET, THEN SEPARATE PERMIT IS REQUIRED.) Original Permit Description:(COM2022-01817) REMOVE 12 EXISTING ANTENNAS. REMOVE 6 EXISTING RRH'S. INSTALL 8 PROPOSED ANTENNAS. INSTALL 9 PROPOSED RRH'S AS PER PLANS AS PER CODE. IF INSTALLING SUPPRESSION SYSTEM IN EQUIPMENT CABINET, THEN SEPARATE PERMIT IS REQUIRED. | — | Jun 21, 2023 |
| COM2022 | FIRE ALARM ONLY AS PER PLANS AS PER CODE. | $20,000 | Apr 7, 2023 |
| COM2023 | MODIFY EXISTING WET SPRINKLER SYSTEM ON THE 4TH FLOOR BY ADDING 17 AND RELOCATING 102 SPRINKLERS FOR CODE COMPLIANT COVERAGE PER NFPA 13-2016. MATCH EXISTING LIGHT AND ORDINARY HAZARD AS PER PLANS PER CODE. | $42,000 | Mar 28, 2023 |
| COM2023 | INSTALL (141) # LOW VOLTAGE AS PER CODE. | $9,000 | Mar 20, 2023 |
| COM2023 | INSTALL (484) # LOW VOLTAGE AS PER CODE. | $236,326 | Mar 17, 2023 |
| COM2023 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2022-02429:DEMOLITION OF APPROX 1540SQFT - FRAME AND EIFS 1.5T MRI SUITE AND THE CONSTRUCTION OF A NEW 2,938 SQFT ADDITION FOR A 7T MRI SUITE. THE NEW STRUCTURE WILL BE BUILT ON DEEP FOUNDATIONS AND WILL HAVE MASONRY BEARING WALLS, MASONRY VENEER AND CONCRETE CORE PLANK ROOF STRUCTURE, NEW MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION SYSTEMS WILL BE INSTALLED IN THE NEW SPACE. AN EMERGENCY GENERATOR AND MECHANICAL EQUIPMENT WILL BE INSTALLED ON THE SITE AS PART OF THE PROJECT AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS.) Original Permit Description:(COM2022-02429) DEMOLITION OF APPROX 1540SQFT - FRAME AND EIFS 1.5T MRI SUITE AND THE CONSTRUCTION OF A NEW 2,938 SQFT ADDITION FOR A 7T MRI SUITE. THE NEW STRUCTURE WILL BE BUILT ON DEEP FOUNDATIONS AND WILL HAVE MASONRY BEARING WALLS, MASONRY VENEER AND CONCRETE CORE PLANK ROOF STRUCTURE, NEW MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION SYSTEMS WILL BE INSTALLED IN THE NEW SPACE. AN EMERGENCY GENERATOR AND MECHANICAL EQUIPMENT WILL BE INSTALLED ON THE SITE AS PART OF THE PROJECT AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | — | Mar 8, 2023 |
| COM2022 | SCOPE OF WORK:----LEVEL III INTERIOR ALTERATIONS---FULL FLOOR RENOVATION (21,894) OF THE 7TH FLOOR AT MEDSTAR HOSPITAL FOR PAREXEL AS PER PLANS AS PER CODE. | $2,700,000 | Mar 3, 2023 |
| COM2023 | INSTALL (14) # LOW VOLTAGE AS PER CODE. | $5,000 | Mar 2, 2023 |
| COM2023 | AMEND PERMIT: ADD PLUMBER AND HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2022-02429:DEMOLITION OF APPROX 1540SQFT - FRAME AND EIFS 1.5T MRI SUITE AND THE CONSTRUCTION OF A NEW 2,938 SQFT ADDITION FOR A 7T MRI SUITE. THE NEW STRUCTURE WILL BE BUILT ON DEEP FOUNDATIONS AND WILL HAVE MASONRY BEARING WALLS, MASONRY VENEER AND CONCRETE CORE PLANK ROOF STRUCTURE, NEW MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION SYSTEMS WILL BE INSTALLED IN THE NEW SPACE. AN EMERGENCY GENERATOR AND MECHANICAL EQUIPMENT WILL BE INSTALLED ON THE SITE AS PART OF THE PROJECT AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS.) Original Permit Description:(COM2022-02429) DEMOLITION OF APPROX 1540SQFT - FRAME AND EIFS 1.5T MRI SUITE AND THE CONSTRUCTION OF A NEW 2,938 SQFT ADDITION FOR A 7T MRI SUITE. THE NEW STRUCTURE WILL BE BUILT ON DEEP FOUNDATIONS AND WILL HAVE MASONRY BEARING WALLS, MASONRY VENEER AND CONCRETE CORE PLANK ROOF STRUCTURE, NEW MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION SYSTEMS WILL BE INSTALLED IN THE NEW SPACE. AN EMERGENCY GENERATOR AND MECHANICAL EQUIPMENT WILL BE INSTALLED ON THE SITE AS PART OF THE PROJECT AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | — | Feb 28, 2023 |
| COM2022 | DEMOLITION OF APPROX 1540SQFT - FRAME AND EIFS 1.5T MRI SUITE AND THE CONSTRUCTION OF A NEW 2,938 SQFT ADDITION FOR A 7T MRI SUITE. THE NEW STRUCTURE WILL BE BUILT ON DEEP FOUNDATIONS AND WILL HAVE MASONRY BEARING WALLS, MASONRY VENEER AND CONCRETE CORE PLANK ROOF STRUCTURE, NEW MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION SYSTEMS WILL BE INSTALLED IN THE NEW SPACE. AN EMERGENCY GENERATOR AND MECHANICAL EQUIPMENT WILL BE INSTALLED ON THE SITE AS PART OF THE PROJECT AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | $4,300,000 | Feb 21, 2023 |
| COM2023 | INSTALL (40) # LOW VOLTAGE AS PER CODE. | $28,460 | Feb 8, 2023 |
| COM2023 | INSTALL 170 LOW VOLTAGE FOR DATA AND VOICE ONLY (COMPUTER AND PHONE) AS PER CODE. | $79,000 | Jan 30, 2023 |
| COM2022 | SCOPE OF WORK:-----GRADING AND PAVING-----CONSTRUCTION OF TEMPORARY HAUL ROAD, PERMANENT WALKWAY AND CONCRETE PADS FOR HVAC AND ELECTRICAL EQUIPMENT, LANDSCAPING, AND MISCELLANEOUS SITE IMPROVEMENTS FOR PROPOSED BUILDING ADDITION AS PER PLANS AS PER CODE. | $1,000 | Jan 23, 2023 |
| COM2022 | AMEND PERMIT: ADD GAS CONTRACTOR . (ORIGINAL PERMIT:COM2022-02896:INTERIOR DEMOLITION AND RENOVATION OF THE FOURTH FLOOR OF MEDSTAR HARBOR HOSPITAL'S OUTPATIENT BUILDING, BUSINESS OCCUPANCY. AREA OF WORK IS 9,998 SQUARE FEET AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-02896) INTERIOR DEMOLITION AND RENOVATION OF THE FOURTH FLOOR OF MEDSTAR HARBOR HOSPITAL'S OUTPATIENT BUILDING, BUSINESS OCCUPANCY. AREA OF WORK IS 9,998 SQUARE FEET AS PER PLANS AS PER CODE. | — | Dec 16, 2022 |
| COM2022 | INTERIOR DEMOLITION AND RENOVATION OF THE FOURTH FLOOR OF MEDSTAR HARBOR HOSPITAL'S OUTPATIENT BUILDING, BUSINESS OCCUPANCY. AREA OF WORK IS 9,998 SQUARE FEET AS PER PLANS AS PER CODE. | $953,654 | Dec 15, 2022 |
| COM2022 | INSTALL (8) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $25,000 | Aug 30, 2022 |
| COM2022 | REMOVE 12 EXISTING ANTENNAS. REMOVE 6 EXISTING RRH'S. INSTALL 8 PROPOSED ANTENNAS. INSTALL 9 PROPOSED RRH'S AS PER PLANS AS PER CODE. IF INSTALLING SUPPRESSION SYSTEM IN EQUIPMENT CABINET, THEN SEPARATE PERMIT IS REQUIRED. | $15,000 | Aug 9, 2022 |
| COM2022 | BFPE INTERNATIONAL IS PROVIDING AND INSTALLING ALL EQUIPMENT FOR THE FIRE SUPPRESSION SYSTEM AS PER PLANS AS PER CODE. | $34,925 | Apr 26, 2022 |
| COM2021 | SCOPE OF WORK:----INTERIOR ALTERATIONS---MODIFICATION (EXPANSION) OF THE EXISTING FIRE PUMP ROOM AND REPLACEMENT OF THE BUILDING FIRE PUMP SYSTEM, LEVEL 2 ALTERATION PER IEB, THE FIRE PUMP ROOM ENCLOSURE WILL BE CONSTRUCTED AS 2-HOUR FIRE BARRIER WITH 90-MIN DOORS AS PER PLANS AS PER CODE. | $800,000 | Apr 22, 2022 |
| COM2020 | FIRELINE IS INSTALLING A NEW WET SPRINKLER SYSTEM (69 HEADS) ON THE FIRST FLOOR OF THE GRUEHN BUILDING AS PER PLANS AS PER CODE. | $20,000 | Dec 15, 2021 |
| COM2021 | INSTALL (1) # GAS TEST AS PER CODE. (BGE RELOCATING GAS METER FROM INSIDE BUILDING TO EXTERIOR. FCM WILL EXTEND (2) HOUSE LINES TO NEW METER LOCATION. (1) 8'' AND (1) 4'' WELD STEEL LINE RUN APPROX 180 FEET. FCM IS CONTRACTED BY BGE TO COMPLETE THIS WORK; SERVICE UPGRADE) | $96,000 | Jul 29, 2021 |
| COM2020 | INSTALL FIRE ALARM DEVICES AS PER PLANS AS PER CODE. | $6,171 | Jun 11, 2021 |
| COM2020 | ADD 21, PLUG 3, AND RELOCATE 75 SPRINKLERS IN ORDER TO ACCOMMODATE THE NEW INTERIOR LAYOUT. LARGEST NEW PIPE 1''. FIRE PUMP TEST ATTACHED. AS PER PLAN AS PER CODE. | $29,900 | May 12, 2021 |
| COM2021 | INSTALL (50) # LOW VOLTAGE AS PER CODE. | $26,246 | Mar 16, 2021 |
| COM2021 | AMEND PERMIT: ADD HVAC CONTRACTOR .(ORIGINAL PERMIT:COM2020-02281:SCOPE OF WORK:--EXTERIOR ALTERATIONS--REPLACEMENT OF MRI EQUIPMENT THROUGH AN EXISTING REMOVABLE EXTERIOR WALL; RECONFIGURATION OF HVAC SYSTEMS; REPLACEMENT OF LIGHTING; UPDATES TO SELECT PLUMBING LOCATIONS FOR EQUIPMENT -- AS PER PLANS -- AS PER CODE.) Original Permit Description:(COM2020-02281) SCOPE OF WORK:--EXTERIOR ALTERATIONS--REPLACEMENT OF MRI EQUIPMENT THROUGH AN EXISTING REMOVABLE EXTERIOR WALL; RECONFIGURATION OF HVAC SYSTEMS; REPLACEMENT OF LIGHTING; UPDATES TO SELECT PLUMBING LOCATIONS FOR EQUIPMENT -- AS PER PLANS -- AS PER CODE. | — | Jan 15, 2021 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.