Baltimore City · 21225
900 BALTIC AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $61,100
- Land use
- Industrial (I)
- Year built
- 1950
- Last sale
- May 1, 2024
Assessment
| Owner | A & S REALTY, LLC |
|---|---|
| Land use | Industrial (I) |
| Total assessment | $61,100 (cycle 2026) |
| Last sale | May 1, 2024 — $60,000 |
| Year built | 1950 |
| Zoning | I-2 |
| Vacant | — |
Permits
4| Type | Description | Cost | Issued |
|---|---|---|---|
| BUSE | Continue to use as warehouse | — | May 27, 2026 |
| COM2024 | Extend Original Permit.(original permit:COM2024-65418:INSTALL (12) # BRANCH CIRCUITS/FEEDERS , (2) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (4) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 75000 BTU FUEL-BURNING EQUIP, (1) 30000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2024-65418) INSTALL (12) # BRANCH CIRCUITS/FEEDERS , (2) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (4) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 75000 BTU FUEL-BURNING EQUIP, (1) 30000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Dec 13, 2024 |
| COM2024 | EXTERIOR: (THE ROOF AND ROOFING WERE REPLACED PRIOR TO THE DRAWING COMPLETION.) REPLACE OR REPAIR ALL DAMAGED MASONRY. REPLACE THREE WINDOWS WITH DOUBLE HUNG WINDOWS WITH INSULATED GLAZING. REMOVE ONE PERSONNEL DOOR AND DOOR FRAME LOCATED ON THE FRONT ELEVATION. FILL DOOR AND FRAME OPENING WITH MASONRY TO MATCH EXISTING. REMOVE MASONRY STEPS LOCATED BELOW THE PERSONNEL DOOR. REPAIR MASONRY STEPS LOCATED AT THE REMAINING PERSONNEL DOOR ON THE RIGHT SIDE ELEVATION. REPLACE ALL FOUR OVERHEAD DOORS AT STORAGE BAYS 1 AND 2. INTERIOR: REPAIR MASONRY STEPS LOCATED AT PERSONNEL DOOR IN THE MASONRY WALL BETWEEN STORAGE BAY 2 AND OFFICE BAY 1. REPLACE FALLEN SECOND FLOOR AND STAIRWAY, LOCATED IN BAY 1. THE SECOND FLOOR SHALL BE CONSTRUCTED OF ELEVEN AND ONE QUARTER INCH I BEAM JOIST AT 16 INCHES ON CENTER. THE SECOND FLOOR FLOORING SHALL BE THREE QUARTER INCH PLYWOOD SUBFLOOR. THE FINISH FLOOR TO BE DETERMINED BY THE OWNER, ON THE INTERIOR SURFACE OF ALL EXTERIOR WALLS SURROUNDING BAY 1, FIRST AND SECOND FLOORS, ADD TWO BY FOUR WOOD STUDS AT TWENTY FOUR INCHES ON CENTER. ADD R-20 BATT INSULATION BETWEEN WOOD STUDS. INSTALL ONE HALF INCH GYPSUM BOARD DRYWALL OVER THE STUDS. CONSTRUCT A POWDER ROOM ON THE FIRST FLOOR OF BAY 1. CONNECT PLUMBING SYSTEMS TO EXISTING PLUMBING. INSTALL TOW BY FOUR LED LIGHT FIXTURES THROUGHOUT THE PROJECT. AS PER PLANS AS PER CODE | $300,000 | Nov 27, 2024 |
| COM2024 | INSTALL (12) # BRANCH CIRCUITS/FEEDERS , (2) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (4) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 75000 BTU FUEL-BURNING EQUIP, (1) 30000 BTU FUEL-BURNING EQUIP AS PER CODE. | $12,000 | May 31, 2024 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.