Baltimore City · 21226

3901 ASIATIC AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$7,035,500
Land use
Commercial (C)
Year built
1920
Last sale
Jul 3, 2024

This owner holds 2 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerWAGNERS POINT PROPERTIES LLC
Land useCommercial (C)
Total assessment$7,035,500 (cycle 2026)
Last saleJul 3, 2024
Year built1920
ZoningMI
Vacant

Permits

5
TypeDescriptionCostIssued
BCCMProviding temporary electrical service for office trailers, break area for workers, and building. as per code.$0Jun 9, 2026
BCCMInstallation of switchboards, panelboards, transformers, light fixtures, wiring devices.$35,400,000May 26, 2026
BCCMTrades work only: Furnish and install temporary 200a 120/240v service on new service rack to provide temporary power to construction trailer as per code. This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewalinformation$0Dec 29, 2025
COM2024NEW CONTRUCTION OF A SUBMARINE CABLE MANUFACTURING FACILITY IN THE CURTIS BAY AREA ALONG THE PATAPSCO RIVER, IN BALTIMORE MARYLAND. THE FACILITY WAS DESIGNED IN COORDINATION WITH THE MANUFACTURING EQUIPMENT. THE FACILITY INCLUDES THE FOLLOWING BUILDINGS AND STRUCTURES: MAIN MANUFACTURING FACILITY – SINGLE-STORY MANUFACTURING SPACE WITH TWO (2) MULTI-STORY TOWERS TO ACCOMMODATE THE MANUFACTURING PROCESS AND A TWO-STORY ANCILLARY OFFICE/LOCKER/BREAKROOM SUPPORT SPACE. THE ONE-STORY BUILDING HAS OVERHEAD BRIDGE CRANES THAT TRANSVERSE LONGITUDINALLY FOR THE LENGTH OF THE BUILDING AND ELEVATED WALKWAYS ALONG THE CABLE CONVEYANCE SYSTEM AS THE CABLE MOVES FROM ONE MANUFACTURING PROCESS TO THE OTHER THROUGHOUT THE PLANT. ACCESSORY STRUCTURES – USED AS SECURITY BUILDINGS THAT WILL BE SITUATED AT THE MAIN ENTRANCE TO THE SITE AND WILL PROVIDE AS A CHECK POINT FOR DELIVERIES AND VISITORS. AS PER PLANS AS PER CODEMay 21, 2025
COM2024*********** AMEND PERMIT# COM2023-02815 (PLAN# 2023-2298) ISSUED 8/2/2024 TO DO ADDITIONAL WORK: ********* part of plan # 2024-2158 (COM2024-02446 AND COM2024-02447)********** SCOPE OF WORK: ------ GRADING ------ INSTALLATION OF THE STONE REVETMENT HAS BEEN MOVED FROM THE SITE DEVELOPMENT PHASE TO THE SITE PREPARATION PHASE REFLECTED IN THIS PLAN SET AND PERMIT APPLICATION. - INSTALLATION OF PRELIMINARY UTILITY CONNECTIONS. - PRE-INSTALLATION OF STORM DRAIN OUTFALL SECTIONS AS PART OF THE RIPRAP CONSTRUCTION. THE FULL STORM DRAIN SYSTEM WILL BE CONNECTED TO THESE OUTFALL SECTIONS IN THE SITE DEVELOPMENT PHASE TO FOLLOW. - INSTALLATION OF WATER, ELECTRICAL, AND COMMUNICATION UTILITIES AS NECESSARY TO CONNECT TO ADJACENT PUBLIC SERVICES. THESE FULL SYSTEMS WILL CONNECT TO THESE INITIAL PUBLIC UTILITY CONNECTIONS DURING THE SITE DEVELOPMENT PHASE TO FOLLOW. LOD INCREASES FROM 38.11 ACRES TO 39.39 ACRES. THE NET FILL FOR THE PROJECT INCREASES FROM 36,319 CY TO 54,975 CY. AS PER PLANS AS PER CODE.Mar 4, 2025

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.