Baltimore City · 21226
3801 ASIATIC AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $6,483,000
- Land use
- Industrial (I)
- Year built
- 1930
- Last sale
- Nov 21, 2011
Assessment
| Owner | USALCO, LLC |
|---|---|
| Land use | Industrial (I) |
| Total assessment | $6,483,000 (cycle 2026) |
| Last sale | Nov 21, 2011 — $8,500,000 |
| Year built | 1930 |
| Zoning | MI |
| Vacant | — |
Permits
9| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2024 | SCOPE OF WORK: ----- GRADING ----- EXTERIOR ALTERATION FOR INSTALLATION OF UTILITIES ASSOCIATED WITH WORK TO CONSTRUCT A SUBMARINE CABLE MANUFACTURING FACILITY ON 3901 ASIATIC AVE IN THE CURTIS BAY AREA ALONG THE PATAPSCO RIVER, (THE FACILITY WAS DESIGNED IN COORDINATION WITH THE MANUFACTURING EQUIPMENT) AS PER PLANS AS PER CODE. | — | May 16, 2025 |
| USE2023 | USE PREMISES FOR TESTING AND RESEARCH LABORATORIES AND OFFICES | — | Feb 21, 2024 |
| COM2023 | [2601 CANNERY AVE] INSTALL (1) 300000 BTU FUEL-BURNING EQUIP AS PER CODE.*************** AS PER THE DEPARTMENT PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE FLOOD PROTECTION ELEVATION (FPE) IS 9.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE, BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS. | $5,000 | Aug 29, 2023 |
| COM2022 | MODIFY EXISTING NFPA13 SPRINKLER SYSTEM (71 HEADS) FOR INTERIOR ALTERATIONS OF AN EXISTING ONE STORY BUILDING AS PER PLANS AS PER CODE. | $5,325 | Jul 6, 2023 |
| COM2023 | AMEND PERMIT: ADD ONSITE CONTRACTOR (THOMAS IACOBONI)LIC# OS0007. (ORIGINAL PERMIT:COM2022-01821:SCOPE OF WORK:----INTERIOR ALTERATIONS---RENOVATION OF EXISTING PRE-ENGINEERED, ONE STORY METAL BUILDING FOR NEW RESEARCH AND DEVELOPMENT LAB AND OFFICES WITH NEW ACCESSIBLE TOILET ROOMS ON GROUND FLOOR AND A MEZZANINE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-01821) SCOPE OF WORK:----INTERIOR ALTERATIONS---RENOVATION OF EXISTING PRE-ENGINEERED, ONE STORY METAL BUILDING FOR NEW RESEARCH AND DEVELOPMENT LAB AND OFFICES WITH NEW ACCESSIBLE TOILET ROOMS ON GROUND FLOOR AND A MEZZANINE AS PER PLANS AS PER CODE. | — | Jun 27, 2023 |
| COM2023 | INSTALL NEW FIRE ALARM SYSTEM AS PER PLANS AS PER CODE. | $9,000 | Jun 26, 2023 |
| COM2023 | INSTALL (15) # LOW VOLTAGE AS PER CODE.************** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) OF 4-4.4 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 9.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (5.2-4.8 FT ABOVE THE FFE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS. | $2,000 | Jun 20, 2023 |
| COM2022 | SCOPE OF WORK:----INTERIOR ALTERATIONS---RENOVATION OF EXISTING PRE-ENGINEERED, ONE STORY METAL BUILDING FOR NEW RESEARCH AND DEVELOPMENT LAB AND OFFICES WITH NEW ACCESSIBLE TOILET ROOMS ON GROUND FLOOR AND A MEZZANINE AS PER PLANS AS PER CODE. | $1,650,000 | Dec 14, 2022 |
| COM2019 | per plans::natural grade at the site is ~ 6 ft and the flood protection elevation (pfe) for the area is 9.2 ft navd88. mechanical, electrical and plumbing components must be installed above the fpe (3.2 ft above natural grade) or be made water tight according to asce 24. install (1) 9000 btu air-con system, condensor as per code. | $3,966.5 | Jul 22, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.