Baltimore City · 21226

5500 CHEMICAL RD

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$15,544,100
Land use
Industrial (I)
Year built
2019
Last sale
Apr 8, 1974

This owner holds 6 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerW. R. GRACE & CO.
Land useIndustrial (I)
Total assessment$15,544,100 (cycle 2026)
Last saleApr 8, 1974
Year built2019
ZoningMI
Vacant

Permits

16
TypeDescriptionCostIssued
COM2024BFPE INTERNATIONAL WILL PROVIDE PARTS, DOCUMENTATION AND LABOR FOR THE INSTALL OF NEW NOTIFIER INSPIRE SERIES FIRE ALARM SYSTEM. AS PER PLANS AS PER CODE. $19,863Oct 8, 2024
COM2024MODIFY THE EXISTING FOAM FIRE SUPPRESSION SYSTEM AT THE WR GRACE MAGNAPORE FACILITY TO ACCEPT NEW AR-SFFF CONCENTRATE. AS PART OF THIS CHANGE, THE EXISTING 1,500 GALLON TANK BLADDER, PROPORTIONER AND FOAM CONCENTRATE WILL BE REPLACED WITH NEW. AFTER COMPLETING ALL THE REQUIRED SYSTEM MODIFICATIONS THE SYSTEM WILL BE FLUSHED TO REMOVE ANY AND ALL REMAINING CONTAMINATES FROM THE PREVIOUS CONCENTRATE. SPRINKLERS TO BE REPLACED WITH APPROVED TYPE FOR NFF-331 AR-SFFF FOAM. 310 HEADS. SPRINKLER SIZING SHOWN ON DRAWINGS AND HAVE BEEN CALCULATED PER AREA. AS PER PLANS AS PER CODE.$150,000Oct 8, 2024
COM2024MODIFY THE EXISTING FOAM FIRE SUPPRESSION SYSTEM AT THE WR GRACE OMC FACILITY TO ACCEPT NEW AR-SFFF CONCENTRATE. AS PART OF THIS CHANGE, THE EXISTING 400 GALLON TANK, PROPORTIONER AND FOAM CONCENTRATE WILL BE REPLACED WITH NEW. THE FOAM CONCENTRATE SUPPLY LINE AND BLADDER TANK WATER INLET LINE WILL BE REPLACED AT THE TIME OF INSTALLATION. AFTER COMPLETING ALL THE REQUIRED SYSTEM MODIFICATIONS THE SYSTEM WILL BE FLUSHED TO REMOVE ANY AND ALL REMAINING CONTAMINATES FROM THE PREVIOUS CONCENTRATE. AS PER PLANS AS PER CODE. $275,950Sep 26, 2024
COM2024MODIFY THE EXISTING FOAM FIRE SUPPRESSION SYSTEM AT THE WR GRACE HYDRO/SPHERES FACILITY TO ACCEPT NEW AR-SFFF CONCENTRATE. AS PART OF THIS CHANGE, THE TANK BLADDER, PROPORTIONER AND FOAM CONCENTRATE WILL BE REPLACED WITH NEW. AFTER COMPLETING ALL THE REQUIRED SYSTEM MODIFICATIONS THE SYSTEM WILL BE FLUSHED TO REMOVE ANY AND ALL REMAINING CONTAMINATES FROM THE PREVIOUS CONCENTRATE. AS PER PLANS AS PER CODE. $250,000Sep 25, 2024
COM2024REPLACE THE EXISTING SPRINKLERS (44 HEADS) ON SITE IN PREPARATION FOR A NEW FOAM SPRINKLER SYSTEM. THE EXISTING TEMPERATURE AND RESPONSE TIME WILL BE THE SAME FOR THIS CHANGE. ALL NEW SPRINKLERS WILL HAVE A WHITE PAINTED FINISH FOR CORROSION INHIBITING PROPERTIES. SMALL SECTIONS OF THE EXISTING PIPE WILL BE REPLACED 1-1 WHERE SHOWN ON EACH LEVEL. NO OTHER CHANGES WILL BE MADE TO THE EXISTING SYSTEM. AS PER PLANS AS PER CODE.$275,950Sep 24, 2024
COM2024THE EXISTING SPRINKLERS ON SITE IN PREPARATION FOR A NEW FOAM SPRINKLER SYSTEM. THE EXISTING TEMPERATURE AND RESPONSE TIME WILL BE THE SAME FOR THIS CHANGE. ALL NEW SPRINKLERS (310 HEADS) WILL HAVE A WHITE PAINTED FINISH FOR CORROSION INHIBITING PROPERTIES. SMALL SECTIONS OF THE EXISTING PIPE WILL BE REPLACED 1-1 WHERE SHOWN ON EACH LEVEL. NO OTHER CHANGES WILL BE MADE TO THE EXISTING SYSTEM. AS PER PLANS AS PER CODE. $612,950Sep 24, 2024
COM2024BFPE WILL REPLACE THE EXISTING SPRINKLERS ON SITE IN PREPARATION FOR A NEW FOAM SPRINKLER SYSTEM (247 HEADS). THE EXISTING TEMPERATURE AND RESPONSE TIME WILL BE THE SAME FOR THIS CHANGE. ALL NEW SPRINKLERS WILL HAVE A WHITE PAINTED FINISH FOR CORROSION INHIBITING PROPERTIES. $424,964Sep 24, 2024
COM2023INSTALL FIRE ALARM DEVICES AS PER PLANS AS PER CODE.$22,000Jun 17, 2024
COM2023SUPPLY AND INSTALL MATERIAL FOR SPRINKLER MONITORING PANEL REPLACEMENTS IN BUILDINGS 146 AND 197. THE NEW SYSTEMS BEING INSTALLED WILL BE A NOTIFIER INSPIRE N16E WITH A CLSS GATEWAY COMMUNICATOR. ALL EXISTING SLC DEVICES WILL BE REPLACED ON A ONE FOR ONE BASIS (LIST OF MATERIAL FOR ALL EQUIPMENT BEING INSTALLED) AS PER PLANS AS PER CODE. $27,094Nov 14, 2023
COM2020INSTALL (6) # SPRINKLERS, RELOCATION ( # HEADS), (44) # REPLACE SPRINKLER HEADS AS PER CODE.$6,980Jul 14, 2020
COM2020INSTALLATION OF A NEW ELECTRIC SUBSTATION, INSTALLATION OF EXTERIOR SUPPORTING STANCHIONS FOR EXISTING MECHANICAL PIPING, INSTALLATION OF NEW PUMPS AND SUPPORTING PROCESS PIPING AS PER PLANS AS PER CODE.$3,844,000Jun 9, 2020
USE2019USE PORTION OF PREMISES FOR A COMBINED HEAT & POWER PLANT FOR GENERATING 5MW ELECTRICITY AND HOT WATER FOR SITE USE. Feb 20, 2020
COM2019set 3 utility poles (digging involved) lash 15kv cable (200a) to pole line, drops from switchgear building to substation as per plans as per code.$36,000Jun 11, 2019
COM2018construct new 46' x 34' control room building, 70 l.f. new steel pipe rack, 440 s.f new cone dryer, install new ticl4 tank and thermal oxidizer along with new fire box and knockout vessel and 125 l.f. 8"-water main relocation as per plans as per code.$2,500,000Jun 10, 2019
COM2019amend permit: add contractor . extend original permit.(original permit:com2018-00245:construction of a 66'-8" x 38'-8" generator building and a 24'-4" x 19'-9" electrical building along with associated access drive, vertical exhaust stack pad, ncr pad, pipe bridge foundation, hvac pads, door pads, grading and esc measures as per plans as per code.) original permit description:(com2018-00245) construction of a 66'-8" x 38'-8" generator building and a 24'-4" x 19'-9" electrical building along with associated access drive, vertical exhaust stack pad, ncr pad, pipe bridge foundation, hvac pads, door pads, grading and esc measures as per plans as per code.Feb 8, 2019
COM2019amend permit: change contractor . extend original permit.(original permit:com2018-00245:construction of a 66'-8" x 38'-8" generator building and a 24'-4" x 19'-9" electrical building along with associated access drive, vertical exhaust stack pad, ncr pad, pipe bridge foundation, hvac pads, door pads, grading and esc measures as per plans as per code.) original permit description:(com2018-00245) construction of a 66'-8" x 38'-8" generator building and a 24'-4" x 19'-9" electrical building along with associated access drive, vertical exhaust stack pad, ncr pad, pipe bridge foundation, hvac pads, door pads, grading and esc measures as per plans as per code.Feb 8, 2019

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Records marked with * are matched by address, not a direct account link. Data is informational only.