Baltimore City · 21226
3901 FORT ARMISTEAD RD
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $5,180,500
- Land use
- Industrial (I)
- Year built
- 1980
- Last sale
- Jul 14, 2023
Assessment
| Owner | MARYLAND PORT ADMINISTRATION |
|---|---|
| Land use | Industrial (I) |
| Total assessment | $5,180,500 (cycle 2026) |
| Last sale | Jul 14, 2023 |
| Year built | 1980 |
| Zoning | MI |
| Vacant | — |
Permits
3| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2022 | SCOPE OF WORK:-----GRADING-----NPDES RESTORATION PROJECT TO INCLUDE INSTALLATION OF MONITORING POINT (VAULT) ADJACENT TO KEMIRA PROPERTY NEAR MANHOLE MH-11, COMBINE FLOWS FROM MANHOLES S MH-11 AND MH-C9 AT THE MONITORING POINT AND DISCHARGE TO DOWNSTREAM MANHOLE MH-11A, ABANDON PIPING ASSOCIATED WITH MANHOLE MH-C9 DOWNSTREAM OF THE NEW MONITORING POINT USING CONCRETE FLOWABLE FILL, INSTALL NEW MANHOLE STRUCTURE IN NEUTRALIZATION BASIN AND FILL BASIN WITH LIGHTWEIGHT FOAMED CONCRETE FILL, ABANDON MANHOLES MH-C3 AND MH-C4, AND ASSOCIATED DOWNSTREAM PIPING TO MANHOLE MH-1A USING CONCRETE FLOWABLE FILL, ABANDON INLETS CB-1, CB-2, CB-3 AND LATERAL PIPING WITH CONCRETE FLOWABLE FILL, RAISE RIM ELEVATION OF MANHOLE MH-1A TO PREVENT SURFACE WATER INFILTRATION, LINE MANHOLES MH-11A, MH-1A, AND MH-1B WITH WATERPROOF LINER, AND LINE PIPING FROM NEW MONITORING POINT TO OUTFALL 001 STRUCTURE WITH CURED-IN-PLACE PIPE (CIPP), PIPE LINING INCLUDES REMOVAL OF FLOW MONITORING WEIRS DOWNSTREAM OF THE NEUTRALIZATION BASIN AND LINING THROUGH THE WEIR STRUCTURE, DO ASSOCIATED SITE GRADING AS PER PLANS AS PER CODE. | $1,500,000 | Dec 2, 2022 |
| COM2022 | SCOPE OF WORK:-----GRADING---ABANDONMENT OF STORM DRAIN MANHOLE, INLETS AND PIPING; REMOVAL OF EXISTING ASPHALT COVER, REGRADING, AND INSTALLATION OF GEOTEXTILE FABRIC AND STONE OR RIP RAP COVER; INSTALLATION OF EARTHEN AND ASPHALT BERMS, FENCE RELOCATION; MANHOLE AND STORM DRAIN PIPE REHABILITATION AS PER PLANS AS PER CODE. | $250,000 | Dec 2, 2022 |
| COM2022 | SCOPE OF WORK:----PAVING----ABANDONMENT OF STORM DRAIN INLETS AND PIPING, REMOVAL OF REMAINING ASPHALT CURBING, INSTALLATION OF A 0.15 ACRE ASPHALT OVERLAY,----FENCE---RELOCATION OF EXISTING FENCE, AND INSTALLATION OF A DRIVE-OVER, 8'' HIGH ASPHALT BERM AS PER PLANS AS PER CODE. | $50,000 | Mar 16, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.