Baltimore City · 21224
5501 HOLABIRD AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $30,779,933
- Land use
- Industrial (I)
- Year built
- 2015
- Last sale
- Oct 7, 2021
Assessment
| Owner | USLP ZETA HOLABIRD LLC |
|---|---|
| Land use | Industrial (I) |
| Total assessment | $30,779,933 (cycle 2026) |
| Last sale | Oct 7, 2021 — $52,339,932 |
| Year built | 2015 |
| Zoning | I-2 |
| Vacant | — |
Permits
19| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | Addition of (2) strobes and (2) horn strobes for the added Multifaith, Ablution Rooms and adjoining Lobby. | $10,000 | May 5, 2026 |
| BCCM | Modifying existing automatic wet type sprinkler system by adding (6) sprinkler heads in new room addition. Light Hazard. Largest pipe size = 1.5" | $8,835 | Apr 29, 2026 |
| BCCM | Plumbing interior bathroom renovation for an existing training room. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. | $97,000 | Apr 29, 2026 |
| BCCM | Interior renovation to existing training room. Interior modification to add ablution room and a prayer space. As per plans and as per code. | $370,000 | Apr 9, 2026 |
| BCCM | Scope of Work: Alterations to include: Remediation of damaged portions of the PV system located on the roof of the Amazon Fulfillment Center. Replace Switchgear, cable tray and cables as listed in the proposal. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. as per code as per plans | $560,720 | Mar 25, 2026 |
| BCCM | Replacement of a Trane Rooftop unit | $55,000 | Oct 23, 2025 |
| BCCM | Scope of Work: Exterior alterations to include: Sign installation: Dimensional Amazon smile logo on front facade (19'x4'-3 3/8"), all work will be done according to baltimore city code and per submitted plans | $8,000 | Sep 25, 2025 |
| BCCM | Disconnect & reconnect power to (17) Rooftop Units, (2) CRACs and (2) CRCUs, providing new feeders as necessary. | $104,000 | Sep 3, 2025 |
| BCCM | REPLACE (1) BRANCH CIRCUIT/FEEDER For RTU #20 | $3,500 | Jul 29, 2025 |
| BCCM | Disconnect & remove (17) rooftop units and replace with new, disconnect & remove (2) computer room air conditioners and replace with new | $200,000 | Jun 12, 2025 |
| COM2024 | INSTALLATION OF PLUG-N-PLAY CONVEYOR & SORTER EQUIPMENT INSIDE EXISTING SPACE, ANCHOR TO SLAB, INSTALL PREFAB CONVEYOR SUPPORTS, AND CONNECT TO EXISTING ELECTRICAL AS PER PLANS PER CODE. | $1,217,914 | Aug 25, 2024 |
| COM2023 | AMEND PERMIT COM2023-01835 AND PLAN NO. 2023-1540 ISSUED ON 10/3/23. ADDING (4) SSUS UNDER SPIRAL CHUTES AND DELETING (30) SSUS PER FIELD CONDITIONS. NEW TOTAL SPRINKLER HEAD COUNT IS (316). AS PER PLANS AS PER CODE. | $138,000 | Feb 13, 2024 |
| COM2023 | AMEND PERMIT COM2023-00995 PLANS NO.2023-827 ISSUED 6/15/23 - NO CHANGE TO ORIGINAL PROJECT SCOPE, MINOR INTERIOR ALTERATIONS TO EXISTING WAREHOUSE, INCL. ELECTRICAL RENOVATIONS TO SUPPORT NEW EQUIPMENT AS PER PLANS AS PER CODE. (ACTUAL DESIGN & INSTALLATION OF NEW EQUIPMENT IS UNDER SEPARATE PERMIT) 1. MINOR ADJUSTMENTS ON THE ELECTRICAL DESIGN PER THE NEW TENANT EQUIPMENT BACKGROUND CHANGES. 2. RELOCATION OF 122FLINEAR FEET OF 8FT TALL CHAINLINK FENCE, & THE ASSOCIATED POWER RELOCATION PER THE NEW TENANT EQUIPMENT BACKGROUND CHANGES. 3. NO FURTHER ARCHITECTURAL/ STRUCTURE SCOPE IN THIS PERMIT THAN THE (2) ITEMS ABOVE. 4. NO MECHANICAL/ PLUMBING SCOPE | $0 | Feb 2, 2024 |
| COM2023 | PROVIDE 341 NEW SPRINKLERS UNDER NEW CONVEYOR SYSTEMS IN EXISTING AMAZON FACILITY. LARGEST PIPE SIZE = 2.5'' ORDINARY HAZARD GROUP II AS PER PLANS AS PER CODE. | $138,000 | Oct 3, 2023 |
| COM2023 | INSTALL (20) # LOW VOLTAGE, (19) # UNCLASSIFIED/OTHER WORK AS PER CODE. | $70,000 | Sep 7, 2023 |
| COM2023 | INSTALLING A MHE CONVEYOR SYSTEM FOR AMAZON BWI5. THIS INCLUDES ALL CONVEYOR, WALKWAY, PLATFORM, GUARDING, CONTROL PANELS, CONTROL DEVICES, AND ALL OTHER MISC. ITEMS ASSOCIATED WITH THE CONVEYANCE SYSTEM. (WESTERN WILL BE RESPONSIBLE FOR RECEIVING AND MANAGING ALL CONVEYOR RELATED EQUIPMENT ON-SITE AND WILL HAVE A FULL-TIME SUPERVISOR ON-SITE, WESTERN WILL BE RESPONSIBLE FOR PERMIT CLOSEOUT AND SYSTEM COMMISSIONING PRIOR TO TURNOVER TO AMAZON IN OCTOBER OF 2023) AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | $11,882,824 | Jul 12, 2023 |
| COM2023 | INTERIOR TENANT IMPROVEMENT MINOR ALTERATIONS TO AN EXISTING WAREHOUSE BUILDING, WORK INCLUDES REMOVAL OF EXISTING MATERIAL HANDLING EQUIPMENT ANDREPLACEMENT WITH A NEW MATERIAL HANDLING EQUIPMENT PLATFORM AND ASSOCIATED EQUIPMENT. ELECTRICAL RENOVATIONS ARE ALSO PLANNED TO SUPPORT THE REVISED EQUIPMENT CONFIGURATION. AS PER PLANS AS PER CODE. | $3,684,917 | Jun 15, 2023 |
| COM2023 | INSTALL (3) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $3,500 | Apr 4, 2023 |
| COM2022 | SCOPE OF WORK:----INTERIOR ALTERATIONS (EQUIPMENT)----INSTALLATION OF CONVEYOR EQUIPMENT, ASSOCIATED SUPPORTS, AND ASSOCIATED ELECTRICAL WORK WITHIN EXISTING AMAZON BWI5 FACILITY. WORK CONCENTRATED BETWEEN BUILDING COLUMNS 10 - 15. NO MECHANICAL OR PLUMBING IN SCOPE. ALL WORK AS PER PLANS AS PER CODE. | $1,500,000 | Sep 2, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.