Assessment
| Owner | USLP ZETA BROENING LLC |
|---|---|
| Land use | Industrial (I) |
| Total assessment | $98,031,800 (cycle 2026) |
| Last sale | Oct 7, 2021 — $164,359,000 |
| Year built | 2015 |
| Zoning | I-2 |
| Vacant | — |
Permits
16| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | Add 6 A/V devices to mezzanine level | $20,000 | May 14, 2026 |
| BCCM | Removal of 1 - 4000A bolted pressure switch in MSA SWBD and replace with 1 - 4000A main breaker. Removal of 1 - 4000A bolted pressure switch in MSB SWBD and replace with 1 - 4000A main breaker. Removal of 1 - 4000A bolted pressure switch in MSC SWBD and replace with 1 - 4000A main breaker. Removal of 1 - 4000A bolted pressure switch in MSD SWBD and replace with 1 - 4000A main breaker. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. | $100,000 | Apr 27, 2026 |
| BCCM | New multi-faith (praying room with faucet and sink to wash) spaces at existing warehouse distribution facility. Interior renovation. As per plans and as per code. | $400,000 | Feb 17, 2026 |
| DEM2024 | DEMOLITION OF AN EXISTING 13 FEET X 16.5 FEET GUARD HOUSE, RAZING PERMIT ONLY AS PER CODE. ***** SEPARATE PERMIT FOR CONSTRUCTION IS REQUIRED *********** | — | Nov 21, 2025 |
| COM2022 | SCOPE OF WORK:----NEW CONSTRUCTION----EXISTING SITE WITH WAREHOUSE, FOR SITE IMPROVEMENTS ASSOCIATED WITH REMOVING THE OLD GUARD HOUSE AND REPLACING WITH A NEW PRE-ASSEMBLED GUARD HOUSE WITH AN ACCESSIBLE RESTROOM, SITE IMPROVEMENTS INCLUDE: ----GRADING/PAVING/FENCING----UTILITY ROUTING AND CONNECTIONS, FENCING, MANUAL SWING GATES, NEW CURBS AND CONCRETE PADS, TENANT EQUIPMENT INSTALLATION, CURB RAMPS, PAVEMENT STRIPING, RELOCATION OF A FEW SITE LIGHT POLES AND TREES. NO WORK PROPOSED AT THE EXISTING WAREHOUSE AS PER PLANS AS PER CODE. | — | Feb 19, 2025 |
| COM2024 | INSTALLATION OF MECHANICAL & ELECTRICAL CONVEYOR SYSTEM THAT IS CEILING HUNG AND FLOOR SUPPORTED WITHIN AN EXISTING WAREHOUSE AS PER PLANS AS PER CODE. | $1,500,000 | Dec 12, 2024 |
| COM2024 | INSTALL (50) # LOW VOLTAGE (DATA DEVICES) AS PER CODE. | $225,000 | Dec 4, 2024 |
| COM2024 | SCOPE OF WORK: -------- INTERIOR ALTERAITONS ------ INTERIOR WORKSTATION ADDITIONS WITH ELECTRICAL DROPS FROM EXISTING ELECTRICAL PANELS TO BRING STATIONS INTO SERVICE. EXISTING INTERIOR FENCING ADJUSTMENTS IF REQUIRED TO INSTALL WORKSTATIONS. AS PER PLANS AS PER CODE. ****** EXISTING SITE, STRUCTURE, BUILDING FOOTPRINT, OCCUPANCY AND OCCUPANT LOAD, FIRE PROTECTION SYSTEM, AND BUILDING CLASSIFICATION TO REMAIN AS-IS WITH NO CHANGES OR MODIFICATIONS ******** | $225,000 | Nov 7, 2024 |
| COM2024 | SCOPE OF WORK: ------ INTERIOR ALTERATIONS (EQUIPMENT SYSTEMS) ----- TENANT IMPROVEMENTS TO AN EXISTING WAREHOUSE. T.I CONSISTS OF EIGHT NEW ARSAW STATIONS AND MDR CONVEYACNE FOR THE TRANSPORT OF TOTES AS PER PLANS AS PER CODE. | $435,186 | May 16, 2024 |
| COM2023 | INSTALL (16) # FIXTURES/DEVICES, (1) # FIXTURES/DEVICES AS PER CODE. | $5,000 | Mar 31, 2023 |
| COM2020 | SCOPE OF WORK:---EQUIPMENT REPLACEMENT---REPLACING SOME CONVEYOR AT THE BWI2 AMAZON FACILITY. WE WILL BE MODIFYING THE CURRENT POWER DISTRIBUTION FOR THE CONVEYANCE AS WELL AS PER PLANS AS PER CODE. | $1,983,844 | May 10, 2021 |
| COM2021 | INSTALL (2) # BRANCH CIRCUITS/FEEDERS , (2) 200 FT CONDUITS/DUCT BANKS AS PER CODE. | $10,000 | Jan 15, 2021 |
| COM2020 | INSTALL (1) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $2,500 | Jun 9, 2020 |
| COM2019 | ADDITION OF A NEW DIVERT OFF OF EXISTING CONVEYOR SYSTEM LINE IN EXITING DISTRIBUTION WAREHOUSE PER PLANS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. | $600,000 | Jan 17, 2020 |
| COM2019 | reconfigure the parking lot to add employee parking to the north and replace existing employee parking with trailer parking, dolly strips will be added; the parking lot will be restriped; entrances will be reconfigured to accommodate the new internal movements, a green area will be created to the east to offset planting areas lost in the island demolition and reduce impervious on-site area to meet stormwater management requirements as per plans as per code. | $2,000,000 | Nov 8, 2019 |
| USE2019 | use premsies as a warehouse. | — | Jul 29, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.