Baltimore City · 21224
1401 S NEWKIRK ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $4,430,533
- Land use
- Industrial (I)
- Year built
- 1995
- Last sale
- Oct 19, 2018
Assessment
| Owner | BUILDING MATERIALS MANUFACTURING |
|---|---|
| Land use | Industrial (I) |
| Total assessment | $4,430,533 (cycle 2026) |
| Last sale | Oct 19, 2018 |
| Year built | 1995 |
| Zoning | I-2 |
| Vacant | — |
Permits
10| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2024 | SCOPE OF WORK: ------- EXTERIOR ALTERATIONS ------ NEW ENCLOSED BRIDGE OVER RAIL SYSTEM ------- GRADING ------ INCIDENTAL TO INSTALLATION OF NEW ENVIRONMENTAL EQUIPMENT AT EXISTING INDUSTRIAL FACILITY AS PER PLANS AS PER CODE. | — | Sep 8, 2025 |
| COM2023 | AMEND PERMIT: ADD GAS CONTRACTOR . (ORIGINAL PERMIT:COM2022-01407:AMEND PERMIT NO. COM2021-00478 PLANS NO 2021-215 ISSUED 7/20/2021 TO ADD A PORTION OF THE PROPOSED BRIDGE, A PORTION OF WHICH IS CURRENTLY INCLUDED IN THE BUILDING PERMIT, OVER NEWKIRK ST AS PER PLANS AS PER CODE. (THE RIGHT OF ENTRY AND CLOSING AGREEMENT HAVE BEEN COMPLETED AND EXECUTED FOR THIS WORK) ASSOCIATED WITH BRIDGE CONNECTOR TO 1610 S NEWKIRK ST AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-01407) AMEND PERMIT NO. COM2021-00478 PLANS NO 2021-215 ISSUED 7/20/2021 TO ADD A PORTION OF THE PROPOSED BRIDGE, A PORTION OF WHICH IS CURRENTLY INCLUDED IN THE BUILDING PERMIT, OVER NEWKIRK ST AS PER PLANS AS PER CODE. (THE RIGHT OF ENTRY AND CLOSING AGREEMENT HAVE BEEN COMPLETED AND EXECUTED FOR THIS WORK) ASSOCIATED WITH BRIDGE CONNECTOR TO 1610 S NEWKIRK ST AS PER PLANS AS PER CODE. | — | Jan 27, 2023 |
| COM2022 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2021-00477:MODIFICATIONS TO EXISTING WAREHOUSE AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEM.) Original Permit Description:(COM2021-00477) MODIFICATIONS TO EXISTING WAREHOUSE AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEM. | — | Dec 13, 2022 |
| COM2022 | AMEND PERMIT: ADD PLUMBER AND HVAC CONTRACTOR .(ORIGINAL PERMIT:COM2022-01407:AMEND PERMIT NO. COM2021-00478 PLANS NO 2021-215 ISSUED 7/20/2021 TO ADD A PORTION OF THE PROPOSED BRIDGE, A PORTION OF WHICH IS CURRENTLY INCLUDED IN THE BUILDING PERMIT, OVER NEWKIRK ST AS PER PLANS AS PER CODE. (THE RIGHT OF ENTRY AND CLOSING AGREEMENT HAVE BEEN COMPLETED AND EXECUTED FOR THIS WORK) ASSOCIATED WITH BRIDGE CONNECTOR TO 1610 S NEWKIRK ST AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-01407) AMEND PERMIT NO. COM2021-00478 PLANS NO 2021-215 ISSUED 7/20/2021 TO ADD A PORTION OF THE PROPOSED BRIDGE, A PORTION OF WHICH IS CURRENTLY INCLUDED IN THE BUILDING PERMIT, OVER NEWKIRK ST AS PER PLANS AS PER CODE. (THE RIGHT OF ENTRY AND CLOSING AGREEMENT HAVE BEEN COMPLETED AND EXECUTED FOR THIS WORK) ASSOCIATED WITH BRIDGE CONNECTOR TO 1610 S NEWKIRK ST AS PER PLANS AS PER CODE. | — | Dec 13, 2022 |
| COM2022 | AMEND PERMIT NO. COM2021-00478 PLANS NO 2021-215 ISSUED 7/20/2021 TO ADD A PORTION OF THE PROPOSED BRIDGE, A PORTION OF WHICH IS CURRENTLY INCLUDED IN THE BUILDING PERMIT, OVER NEWKIRK ST AS PER PLANS AS PER CODE. (THE RIGHT OF ENTRY AND CLOSING AGREEMENT HAVE BEEN COMPLETED AND EXECUTED FOR THIS WORK) ASSOCIATED WITH BRIDGE CONNECTOR TO 1610 S NEWKIRK ST AS PER PLANS AS PER CODE. | $500,000 | Jul 27, 2022 |
| COM2022 | WORK INCLUDES THE INSTALLATION OF A CONVEYOR, PALLETIZER, AND ROBOTICS SYSTEM, AS PER PLANS. THE SYSTEM IS BEING INSTALLED IN A WAREHOUSE AT 1401 S NEWKIRK (REF. PERMIT NO. 2021-214), A WAREHOUSE AT 1610 S NEWKIRK (REF. PERMIT NO. 2021-215), AND A BRIDGE OVER NEWKIRK ST. | $1,000,000 | Jun 24, 2022 |
| COM2021 | AMEND PERMIT: ADD PLUMBER AND HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2021-00477:MODIFICATIONS TO EXISTING WAREHOUSE AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEM.) Original Permit Description:(COM2021-00477) MODIFICATIONS TO EXISTING WAREHOUSE AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEM. | — | Aug 17, 2021 |
| COM2021 | MODIFICATIONS TO EXISTING WAREHOUSE AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEM. | $1,431,583 | Jun 23, 2021 |
| COM2019 | amend permit: add electrical, hvac contractor . extend original permit.(original permit:com2018-03320:construction of new accessory building for housing new switchgear for manufacturing plant, including onsite conduit installation as per plans as per code.) original permit description:(com2018-03320) construction of new accessory building for housing new switchgear for manufacturing plant, including onsite conduit installation as per plans as per code. | — | Jan 15, 2019 |
| COM2018 | construction of new accessory building for housing new switchgear for manufacturing plant, including onsite conduit installation as per plans as per code. | $700,000 | Jan 7, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.