Baltimore City · 21224
3219 DILLON ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $473,700
- Land use
- Residential (R)
- Year built
- 1920
- Last sale
- Oct 12, 2022
Assessment
| Owner | TICSE, ABIGAIL ELAINE |
|---|---|
| Land use | Residential (R) |
| Total assessment | $473,700 (cycle 2026) |
| Last sale | Oct 12, 2022 — $599,000 |
| Year built | 1920 |
| Zoning | R-8 |
| Vacant | — |
Permits
9| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2022 | Extend Original Permit.(original permit:COM2021-84356:NON-STRUCTURAL DEMO & REMOVAL OF PLASTER, DRYWALL, WINDOWS, DOORS, NON-BEARING WALLS, ROOFING & FLOOR MATERIAL, & REMOVAL OF DEBRIS AND EQUIP. REMOVE FLOOR JOISTS FOR NEW STAIRS’ FRAMING. NEW FIRST FLOOR ADDITION. (14’-4“X 12’-0”)NEW SECOND FLOOR ADDITION. (14’-4“X 14’-0”) NEW ROOF TOP DECK. (14'-4''X 18'-0'') NEW INTERIOR FRAMING & DRYWALL (2X4STUDS AT 16''O.C.) FOR BASEMENT, 1ST & 2ND FLOOR. NEW 3'-0'' WIDE INTERIOR STAIRS (7.75''MAX RISERS & 10'' MIN. TREADS) AND HANGERS. NEW FLOOR FINISHING, NEW INTERIOR DOORS (10), NEW EXTERIOR DOORS(3), NEW WINDOWS(7), NEW SIDINGS AND NEW RUBBER ROOF OVER EXISTING ROOF. EXISTING WINDOWS AND DOORS SAME SIZES AND LOCATIONS. NEW CONCRETE PARKING PAD. NEW INSULATION (R49 FOR ROOF, R21 FOR EXTERIOR WALLS). (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. DECK AND ADDITION WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS) ) Original Permit Description:(COM2021-84356) NON-STRUCTURAL DEMO & REMOVAL OF PLASTER, DRYWALL, WINDOWS, DOORS, NON-BEARING WALLS, ROOFING & FLOOR MATERIAL, & REMOVAL OF DEBRIS AND EQUIP. REMOVE FLOOR JOISTS FOR NEW STAIRS’ FRAMING. NEW FIRST FLOOR ADDITION. (14’-4“X 12’-0”)NEW SECOND FLOOR ADDITION. (14’-4“X 14’-0”) NEW ROOF TOP DECK. (14'-4''X 18'-0'') NEW INTERIOR FRAMING & DRYWALL (2X4STUDS AT 16''O.C.) FOR BASEMENT, 1ST & 2ND FLOOR. NEW 3'-0'' WIDE INTERIOR STAIRS (7.75''MAX RISERS & 10'' MIN. TREADS) AND HANGERS. NEW FLOOR FINISHING, NEW INTERIOR DOORS (10), NEW EXTERIOR DOORS(3), NEW WINDOWS(7), NEW SIDINGS AND NEW RUBBER ROOF OVER EXISTING ROOF. EXISTING WINDOWS AND DOORS SAME SIZES AND LOCATIONS. NEW CONCRETE PARKING PAD. NEW INSULATION (R49 FOR ROOF, R21 FOR EXTERIOR WALLS). (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. DECK AND ADDITION WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS) | — | May 6, 2022 |
| COM2022 | INSTALL (1) 150 AMPS ENLARGE ELECTRICAL METERS, (20) # BRANCH CIRCUITS/FEEDERS , (6) # LOW VOLTAGE AS PER CODE. | $5,000 | Apr 15, 2022 |
| COM2022 | INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 80000 BTU FUEL-BURNING EQUIP, (3) 100 CFM EXHAUST SYSTEMS , (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY) AS PER CODE. | $9,800 | Mar 21, 2022 |
| COM2022 | NEW FIRST FLOOR ADDITION. (4’-0“ X 14’-4”) NEW EXTERIOR DOORS(1), NEW WINDOWS(1), NEW SIDINGS. NEW INSULATION (R21 FOR EXTERIOR WALLS). (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.) ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS | $3,500 | Feb 24, 2022 |
| COM2022 | INSTALL (1) # BACKFLOW PREVENTION DEVICE (<2'' DIAMETER), (1) # ELECTRIC WATER HEATER, (11) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 70000 BTU FUEL-BURNING EQUIP, (1) 40000 BTU FUEL-BURNING EQUIP AS PER CODE. | $4,500 | Feb 18, 2022 |
| COM2022 | AMEND PERMIT: CHANGE PRIME CONTRACTOR . (ORIGINAL PERMIT:COM2021-85467:SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. EXISTING BASEMENT HEIGHT = 6'-0'', PROPOSED HEIGHT = 8'-0''. NEW 4'' CONCRETE SLAB ON 4'' GRAVEL, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS) Original Permit Description:(COM2021-85467) SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. EXISTING BASEMENT HEIGHT = 6'-0'', PROPOSED HEIGHT = 8'-0''. NEW 4'' CONCRETE SLAB ON 4'' GRAVEL, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS | — | Feb 1, 2022 |
| COM2022 | SCOPE OF WORK:-----EXTERIOR ALTERATIONS----REMOVE FORMSTONE, CLEAN AND REPOINT EXISTING BRICK PER BALTIMORE CITY CODE | $2,600 | Jan 11, 2022 |
| COM2021 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. EXISTING BASEMENT HEIGHT = 6'-0'', PROPOSED HEIGHT = 8'-0''. NEW 4'' CONCRETE SLAB ON 4'' GRAVEL, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS | $5,000 | Nov 22, 2021 |
| COM2021 | NON-STRUCTURAL DEMO & REMOVAL OF PLASTER, DRYWALL, WINDOWS, DOORS, NON-BEARING WALLS, ROOFING & FLOOR MATERIAL, & REMOVAL OF DEBRIS AND EQUIP. REMOVE FLOOR JOISTS FOR NEW STAIRS’ FRAMING. NEW FIRST FLOOR ADDITION. (14’-4“X 12’-0”)NEW SECOND FLOOR ADDITION. (14’-4“X 14’-0”) NEW ROOF TOP DECK. (14'-4''X 18'-0'') NEW INTERIOR FRAMING & DRYWALL (2X4STUDS AT 16''O.C.) FOR BASEMENT, 1ST & 2ND FLOOR. NEW 3'-0'' WIDE INTERIOR STAIRS (7.75''MAX RISERS & 10'' MIN. TREADS) AND HANGERS. NEW FLOOR FINISHING, NEW INTERIOR DOORS (10), NEW EXTERIOR DOORS(3), NEW WINDOWS(7), NEW SIDINGS AND NEW RUBBER ROOF OVER EXISTING ROOF. EXISTING WINDOWS AND DOORS SAME SIZES AND LOCATIONS. NEW CONCRETE PARKING PAD. NEW INSULATION (R49 FOR ROOF, R21 FOR EXTERIOR WALLS). (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. DECK AND ADDITION WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS) | $95,000 | Nov 17, 2021 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 8, 2026 · 39 m · 3201 DILLON ST
- permit: BRCMJul 7, 2026 · 123 m · 3121 DILLON ST
- violation: HCD-Maintenance StructureJul 4, 2026 · 115 m · 3229 O DONNELL ST
- permit: BRCMJul 2, 2026 · 123 m · 3121 DILLON ST
- violation: HCD-Sanitation PropertyJul 1, 2026 · 123 m · 3121 DILLON ST
- permit: BRCMJun 30, 2026 · 60 m · 1008 S CLINTON ST
- permit: BRCMJun 29, 2026 · 60 m · 1006 S CLINTON ST
- violation: HCD-Illegal DumpingJun 22, 2026 · 94 m
- permit: BRCMJun 10, 2026 · 60 m · 1006 S CLINTON ST
- permit: BRCMJun 10, 2026 · 60 m · 1006 S CLINTON ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.