Baltimore City · 21224
1001 S CLINTON ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $683,400
- Land use
- Residential (R)
- Year built
- 1920
- Last sale
- May 29, 2025
Assessment
| Owner | CARRIER, TIMOTHY |
|---|---|
| Land use | Residential (R) |
| Total assessment | $683,400 (cycle 2026) |
| Last sale | May 29, 2025 — $700,000 |
| Year built | 1920 |
| Zoning | R-8 |
| Vacant | — |
Permits
5| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | Upgrade service to 200 amp, install 20 new circuits, install 6 liw voltage as per code | — | Mar 7, 2025 |
| COM2024 | INSTALL (1) 40000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE), (3) 100 CFM EXHAUST SYSTEMS , (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY) AS PER CODE. | $13,650 | Jan 24, 2025 |
| COM2024 | INSTALL (1) # BACKFLOW PREVENTION DEVICE (<2" DIAMETER), (1) # ELECTRIC WATER HEATER, (11) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 60000 BTU FUEL-BURNING EQUIP, (1) 40000 BTU FUEL-BURNING EQUIP AS PER CODE. | $5,000 | Dec 23, 2024 |
| COM2024 | NON-STRUCTURAL DEMO & REMOVAL OF PLASTER, DRYWALL, WINDOWS, DOORS, NON-BEARING WALLS, ROOFING & FLOOR MATERIAL, & REMOVAL OF DEBRIS AND EQUIP. REMOVE FLOOR JOISTS FOR NEW STAIRS’ FRAMING. NEW FIRST FLOOR REAR ADDITION. (15’-0” X 9’-6”), PARTIAL REBUILD SECOND FLOOR. (15’-0” X 9’-6”), NEW ROOF TOP DECK (15’-0” X 18’-0) NEW INTERIOR FRAMING & DRYWALL (2X4STUDS AT 16"O.C.) FOR 1ST AND 2ND FLOOR. NEW 3'-0" WIDE INTERIOR STAIRS (7.75"MAX RISERS & 10" MIN. TREADS) AND HANGERS. NEW FLOOR FINISHING, NEW INTERIOR DOORS (6), NEW EXTERIOR DOORS(3), NEW WINDOWS(18), NEW SIDINGS AND NEW RUBBER ROOF OVER EXISTING ROOF. EXISTING WINDOWS AND DOORS SAME SIZES AND LOCATIONS. NEW CONCRETE PATIO. NEW INSULATION (R49 FOR ROOF, R21 FOR EXTERIOR WALLS). (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.) AS PER PLANS PER CODE | $95,000 | Dec 6, 2024 |
| COM2024 | UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. EXISTING BASEMENT HEIGHT = 6'-0", PROPOSED HEIGHT = 8'-0". NEW 4" CONCRETE SLAB ON 4" GRAVEL. AS PER PLANS AND AS PER CODE. | $5,000 | Dec 6, 2024 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 8, 2026 · 85 m · 1007 S HIGHLAND AVE
- permit: BRCMJul 8, 2026 · 146 m · 3201 DILLON ST
- violation: HCD-Maintenance StructureJul 4, 2026 · 133 m · 3229 O DONNELL ST
- permit: BRCMJun 30, 2026 · 50 m · 1008 S CLINTON ST
- permit: BRCMJun 29, 2026 · 48 m · 1006 S CLINTON ST
- violation: HCD-Sanitation PropertyJun 28, 2026 · 139 m
- violation: HCD-Sanitation PropertyJun 27, 2026 · 130 m · 3430 DILLON ST
- violation: PM 305.2.2Jun 11, 2026 · 131 m · 3430 DILLON ST
- permit: BRCMJun 10, 2026 · 48 m · 1006 S CLINTON ST
- permit: BRCMJun 10, 2026 · 48 m · 1006 S CLINTON ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.