Baltimore City · 21224

260 S HIGHLAND AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$153,600
Land use
Residential (R)
Year built
1900
Last sale
Dec 15, 2022

Assessment

OwnerRB2 INVESTMENTS LLC
Land useResidential (R)
Total assessment$153,600 (cycle 2026)
Last saleDec 15, 2022 — $170,000
Year built1900
ZoningR-8
Vacant

Permits

8
TypeDescriptionCostIssued
USE2023USE AS A SINGLE-FAMILY DWELLING.Sep 26, 2023
COM2023REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-90579:DEMO WORK: CATEGORY 2 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING /ROOFING & DEBRIS. NEW INTERIOR WORK: FRAMING (1,200 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (15). NEW EXTERIOR WORK: NEW 2ND FLOOR REAR ADDITION (13' X 8'-6'') (52 SQFT). ENLARGE 1ST FLOOR FRONT WINDOW TO ORIGINAL OPENING AS PER PLANS. NEW EXTERIOR DOORS (3), WINDOWS (7). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ALL EXTERIOR WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN PROPER SETBACKS) ) Original Permit Description:(COM2022-90579) DEMO WORK: CATEGORY 2 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING /ROOFING & DEBRIS. NEW INTERIOR WORK: FRAMING (1,200 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (15). NEW EXTERIOR WORK: NEW 2ND FLOOR REAR ADDITION (13' X 8'-6'') (52 SQFT). ENLARGE 1ST FLOOR FRONT WINDOW TO ORIGINAL OPENING AS PER PLANS. NEW EXTERIOR DOORS (3), WINDOWS (7). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ALL EXTERIOR WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN PROPER SETBACKS) Sep 13, 2023
COM2023 Extend Original Permit.(original permit:COM2023-54751:SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. EXISTING BASEMENT HEIGHT = 6'-0'', PROPOSED HEIGHT = 8'-0''. NEW 4'' CONCRETE SLAB ON 4'' GRAVEL, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS) Original Permit Description:(COM2023-54751) SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. EXISTING BASEMENT HEIGHT = 6'-0'', PROPOSED HEIGHT = 8'-0''. NEW 4'' CONCRETE SLAB ON 4'' GRAVEL, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANSSep 5, 2023
COM2023INSTALL (18) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (95) # FIXTURES/DEVICES AS PER CODE.$1,800Jun 7, 2023
COM2023INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (4) 50 CFM EXHAUST SYSTEMS AS PER CODE.$14,000May 11, 2023
COM2023INSTALL (18) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 35000 BTU FUEL-BURNING EQUIP, (1) 70000 BTU FUEL-BURNING EQUIP, (1) 50000 BTU FUEL PIPING (OTHER THAN 1 OR 2 FAMILY) AS PER CODE.$500Apr 3, 2023
COM2023SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. EXISTING BASEMENT HEIGHT = 6'-0'', PROPOSED HEIGHT = 8'-0''. NEW 4'' CONCRETE SLAB ON 4'' GRAVEL, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS$5,000Feb 24, 2023
COM2022DEMO WORK: CATEGORY 2 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING /ROOFING & DEBRIS. NEW INTERIOR WORK: FRAMING (1,200 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (15). NEW EXTERIOR WORK: NEW 2ND FLOOR REAR ADDITION (13' X 8'-6'') (52 SQFT). ENLARGE 1ST FLOOR FRONT WINDOW TO ORIGINAL OPENING AS PER PLANS. NEW EXTERIOR DOORS (3), WINDOWS (7). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ALL EXTERIOR WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN PROPER SETBACKS) $60,000Jan 12, 2023

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.