Baltimore City · 21224
4501 E LOMBARD ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $1,147,800
- Land use
- Industrial (I)
- Year built
- 1950
- Last sale
- Jan 25, 2017
Assessment
| Owner | GRP 4501 LOMBARD, LLC |
|---|---|
| Land use | Industrial (I) |
| Total assessment | $1,147,800 (cycle 2026) |
| Last sale | Jan 25, 2017 — $1,085,000 |
| Year built | 1950 |
| Zoning | I-2 |
| Vacant | — |
Permits
7| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2021 | INSTALL FIRE ALARM AS PER PLANS AS PER CODE. | $20,000 | Mar 23, 2021 |
| COM2021 | SCOPE OF WORK: ALTERATIONS TO INCLUDE: SPRINKLER WORK, RELIANCE'S WORK CONSISTS OF RELOCATING 20 SPRINKLERS TO ACCOMMODATE NEW INTERIOR LAYOUT. LAYOUT SHALL BE ORDINARY HAZARD OCCUPANCY IN STORAGE ROOMS AND LIGHT HAZARD OCCUPANCY IN OFFICES, BREAKROOM AND RESTROOMS PER NFPA 13. AS PER CODE. | $9,900 | Feb 5, 2021 |
| COM2019 | INTERIOR RENOVATIONS TO EXISTING ONE-STORY VEHICLE MAINTENANCE FACULTY FOR A NEW TENANT, RENOVATIONS INCLUDE SPACE LAYOUT FOR (5) OFFICES, (1) BREAKROOM, (1) MEN'S ROOM, AND (1) WOMEN'S ROOM, (EXISTING USE IS STORAGE, BUSINESS USE IS AN ACCESSORY TO THE STORAGE USE; USE WILL REMAIN. THE BUILDING IS FULLY SPRINKLERED) AS PER PLANS AS PER CODE. | $200,000 | Dec 10, 2020 |
| COM2019 | install (3) # branch circuits/feeders , (3) # fixtures/devices, (8) # low voltage as per code. | $500 | Nov 13, 2019 |
| COM2019 | scope of work:--paving--provide and install a new gasoline 10,000 gallon ul 2085 fireguard protected tank with two new fuel dispensers, the tank will be supported by a new concrete pad with two concrete drive pads on each side, the current proposed location is paved with asphalt, this tank will supply gasoline fuel to md mobility contract vehicles, all of the fuel piping shall be above ground schedule 40 steel piping for the two dispensers and the remote fill, the tank has two methods of overfill protection – primary is an overfill valve which will stop the fuel flow at 95% volume, the secondary is an audible alarm that will alert the driver at 90% and 95% to stop the fuel transfer per nfpa requirements, the tank will be surrounded by 4" concrete filled steel bollards, the tank will have an automatic tank gauging system monitoring the level and the secondary of the tank for a leak as per plans as per code. (all work is being performed by maryland department of the environment oil control certified tank tech - andrew cignatta mdic 2018-1640) | $177,000 | Oct 28, 2019 |
| COM2019 | provide and install fire alarm system per drawings and submittal # 101514 as per plans/ as per code. | $3,000 | Jun 28, 2019 |
| USE2019 | to use portion of the premise for parking mobility operation buses. | — | May 10, 2019 |
Violations
2| Kind | Category | Status | Date |
|---|---|---|---|
| service_request | HCD-Illegal Dumping | Closed (Transferred) | Jul 6, 2026 |
| service_request | HCD-Illegal Dumping | Closed (Transferred) | May 28, 2026 |
Inspections
0No inspections on record.
Nearby recent activity
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.