Baltimore City · 21224
5100 EASTERN AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $151,541,000
- Land use
- Commercial (C)
- Year built
- 2007
- Last sale
- Oct 29, 2009
Assessment
| Owner | FSK LAND CORPORATION |
|---|---|
| Land use | Commercial (C) |
| Total assessment | $151,541,000 (cycle 2026) |
| Last sale | Oct 29, 2009 |
| Year built | 2007 |
| Zoning | H |
| Vacant | — |
Permits
showing 50 of 141| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | **** This project is to replace the existing single-ended 1,000 kVA substation serving the Burton Pavilion with a new double-ended service to support the building. The existing service is 13.2 kV fed from the campus feeders. The new service will be fed from the FSK building, 480V service. This work will be performed in multiple phases to minimize disruption to the Burton Pavilion building. The project is primarily electrical in nature and provides: ***** SCOPE OF WORK: ---- TRADES ----- - 500 kVA dry type transformers, switchgear, switchboards, and associated breakers, feeders, light fixtures, etc. ----- EXTERIOR ALTERATIONS ----- - The project does include miscellaneous architectural, structural, and mechanical work to support the electrical substation replacement. AS PER PLANS AND AS PER CODE. ****** Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. ******* | $4,000,000 | Jun 26, 2026 |
| BCCM | REVISION 1 - ORIGINAL PERMITS - BCCM-26-000060 & 251028 3RD PARTY REVIEW - RICK ARVIN ALL BRANCH LINES TO BE REPLACE WITH NEW PIPE. NO LINES ARE TO RUN OVER NEW EQUIPMENT | $500 | Jun 19, 2026 |
| BCCM | Modify Existing Fire Alarm System | $159,989 | May 21, 2026 |
| BCCM | SCOPE OF WORK: REISSUANCE OF PERMIT WORK SCOPE: REMOVE (12) EXISTING ANTENNAS, INSTALL (12) NEW ANTENNAS, AND UPGRADE/MODIFY ANCILLARY EQUIPMENT IN SUPPORT OF NEW ANTENNAS AS PER PLANS AS PER CODE. *PLANS PREVIOUSLY APPROVED ON PERMIT COM2024-03427 WITH ASSOCIATED PLANS 2024-2908 ISSUED ON 1/15/25 | $2,000 | May 5, 2026 |
| BCCM | Alteration of Patient Rooms within a larger hospital. Alterations to Mechanical, Electrical, Plumbing and Gas included. | $8,260,000 | Mar 12, 2026 |
| BCCM | BFPE WILL ADD AND RELOCATE SPRINKLER HEADS FOR THE REDESIGN OF THE TENANT SPACE | $136,570 | Feb 17, 2026 |
| BCCM | BFPE is to add and relocate sprinkler heads for the redesign of the tenant space. Existing system is to be re-used as much as possible, all material within the MRI room is to be non-ferrous. | $41,400 | Feb 10, 2026 |
| BCCM | Install new light, receptacles and provide connection and wiring to the new equipment. as per code. | $42,000 | Dec 19, 2025 |
| BCCM | SCOPE OF WORK: ------ INTERIOR ALTERATIONS (EQUIPMENT) -------- Replacement of an existing MRI with new MRI Equipment at the Johns Hopkins Bayview Medical Center Francis Scott Key Pavilion. Project includes demo and new construction for renovating the interior finishes of the MRI Scanner room and its adjacent Control room. Project will also include minor temporary interior corridor rework in order to bring the MRI Scanner into the building and to remove the old one. New work will not be moving any existing walls. AS PER PLANS AND AS PER CODE. | $1,500,000 | Dec 4, 2025 |
| BCCM | NFPA 13, modify an existing sprinkler system for new layout. | $5,163.2 | Oct 29, 2025 |
| BCCM | Johns Hopkins Facilities and Real Estate (JHFRE) would like to rehabilitate 22 storms drain and 5 sanitary sewer manholes on the Bayview Medical Campus. Proposed rehabilitation work includes replacing the manhole frame and cover, replacing manhole steps, grouting and sealing around frame and pipe openings, replacing cleanout with manhole structure, applying interior coating, and cleaning. As per plans and as per code. | $400,000 | Oct 23, 2025 |
| COM2023 | FIRE ALARM CONTROL PANEL REPLACEMENT ONLY. NO FIELD DEVICES TO BE REPLACED. SCOPE OF WORK LIMITED TO FIRE ALARM CONTROL ROOM. AS PER PLANS AS PER CODE. | — | Oct 2, 2025 |
| COM2023 | FIRE ALARM CONTROL PANEL REPLACEMENT. PANEL ONLY. NO FIELD DEVICES ARE TO BE REPLACED. SCOPE OF WORK IS LIMITED TO FIRE ALARM CONTROL ROOM AS PER PLANS AS PER CODE. | — | Sep 30, 2025 |
| BCCM | Installation of Telecom cabling. 45 dual locations, total of 100 cables | $65,000 | Sep 30, 2025 |
| BCCM | install 25 low voltage temperature control devices | $5,000 | Sep 17, 2025 |
| BCCM | Install 25 low voltage Temperature Control devices | $10,000 | Sep 17, 2025 |
| BUSE | TO USE PORTION for tenant - Johns Hopkins AI Tech (5200 EASTERN AVE, SUITE 2100) - Business/Office Use In the Mason F Lord Building on Bayview Campus - Second Floor | — | Sep 8, 2025 |
| BCCM | Install Fire Alarm System for referenced project consisting of: 1 PAD Panel, 5 Speaker Visual devices, 4 visual devices, 3 speakers, 2 smoke detctors, 1 door holder with relay. | $10,000 | Sep 3, 2025 |
| BUSE | continue to use portion of 3rd floor (FSK Building) for/as operating room. | — | Aug 13, 2025 |
| BCCM | Demo and install new switchgear, disconnects, and panel. | — | Aug 6, 2025 |
| BCCM | Install (2) new free eqress access control doors in this existing building. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. | $11,625 | Jul 30, 2025 |
| USE2024 | TO USE AS CHILD DAYCARE CENTER FOR 32 CHILDREN AGES 2 YRS-5 YRS OLD FROM 6 :00AM-8:00PM , LOCATED ON THE GROUND LEVEL OF JOHN R BURTON PAVILLION. | — | Jul 25, 2025 |
| BCCM | Demo 60 Light fixtures and install 60 new light fixtures. | $18,525 | Jul 16, 2025 |
| BCCM | SCOPE OF WORK: ------- LEVEL I ALTERATIONS ----- Associated with equipmet replacement: Alterations to existing medical use: DISASSEMBLE EXISTING TUNNEL WASHER, BEDDING DISPOSER, AUTOCLAVES, BULK AUTOCLAVE, VACUUM PUMPS AND ALL ASSOCIATED EQUIPMENT and install new. Work on basement level and includes new exterior pad, 20 sf, for pump module. AS PER PLANS AND AS PER CODE. | $50,000 | Jul 14, 2025 |
| COM2025 | PROVIDE FOR INTEGRATION OF NEW DEVICES IN SUITE TO EXISTING FIRE ALARM SYSTEM. | — | Jul 2, 2025 |
| BCCM | Rough in of control wiring for new VRF system | $22,500 | Jun 4, 2025 |
| COM2024 | JOHNS HOPKINS FACILITIES AND REAL ESTATE (JHFRE) WOULD LIKE TO IMPROVE THE CONDITION AND RELIABILITY OF THE SANITARY SEWER COLLECTION SYSTEM THAT SERVES THE MASON F. LORD BUILDING (MFL) AND SURROUNDING BUILDINGS (MFL AREA) AS WELL AS THE OVERALL BAYVIEW MEDICAL CENTER CAMPUS. CURRENTLY, SANITARY FLOWS COLLECTED IN THE MFL AREA FLOW THROUGH A SYSTEM THAT PASSES UNDERNEATH THE MAIN HOSPITAL COMPLEX AND THEN TO THE LOMBARD STREET SEWER SYSTEM. DUE TO CONCERNS OF AGE, CAPACITY AND LOCATION, THE PROJECT PROPOSES IMPROVE THE EXISTING SANITARY SYSTEM BY RE-ROUTING THE MFL AREA FLOWS TO THE EASTERN AVENUE SANITARY SEWER SYSTEM AS PER PLANS AS PER CODE. | — | Jun 3, 2025 |
| COM2024 | SCOPE OF WORK: ---- LEVEL 02 ALTERATIONS ------- RENOVATIONS AS REQUIRED TO RENOVATE EXISTING PATIENT BATHROOMS AND ENVIRONMENTAL SERVICES CLOSETS TO RESOLVE A WATER LEAKS ISSUE. THE WORK WILL BE REQUIRED ON 3RD FLOOR ABOVE OPERATING ROOM CEILINGS AND ON PATIENT FLOORS 4 THROUGH 6. THE WORK IN THE PATIENT BATHROOMS INCLUDES NEW SHOWERS WITH TRENCH DRAIN AND NEW MONOLITHIC FLOORS WITH 6" INTEGRAL BASE SLOPED TO SHOWER DRAINS. AS PER PLANS AS PER CODE. | — | May 20, 2025 |
| BCCM | Install of 1 sink, and 1 toilet. | — | May 8, 2025 |
| COM2024 | [4940 EASTERN AVE] RENOVATION OF AN EXISTING OPERATING ROOM. SCOPE TO INCLUDE NEW MAJOR MEDICAL EQUIPMENT, FINISHES, AND CASEWORK. AS PER PLANS AS PER CODE. | $1,542,000 | May 7, 2025 |
| BCCM | The scope of work includes, BFPE adding and relocating quick response concealed sprinkler heads to provide the proper coverage in the newly renovated space. BFPE will follow the existing pipe schedule on site. | — | May 2, 2025 |
| COM2024 | ADDING 3 ANNUNCIATING DEVICES TO EXISTING LOOP, AS PER PLANS AS PER CODE. | — | Apr 16, 2025 |
| COM2024 | SCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS ------ TENANT FITOUT OF AN EXISTING SPACE ON THE SECOND FLOOR OF THE MASON F LORD BUILDING ON THE BAYVIEW CAMPUS. THE NEW TENANT WILL BE BUSINESS USE, OFFICE. AS PER PLANS AS PER CODE. | $1,000,000 | Apr 1, 2025 |
| COM2024 | SHELL SPACE AND SLIDE STORAGE FIRE ALARM RENOVATION AS PER PLANS AS PER CODE. | — | Mar 27, 2025 |
| COM2025 | ADD 24 SPRINKLERS, RELOCATE 69 SPRINKLERS FROM EXISTING 1" OUTLETS TO ACCOMMODATE THE NEW TENANT FIT OUT AS PER PLANS AS PER CODE. | — | Mar 21, 2025 |
| COM2024 | AMEND PERMIT: ADD HVAC, ELECTRICAL AND PLUMBING CONTRACTOR. ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2024-01311:SCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS ------ TENANT FITOUT OF AN EXISTING SPACE ON THE SECOND FLOOR OF THE MASON F LORD BUILDING ON THE BAYVIEW CAMPUS. THE NEW TENANT WILL BE BUSINESS USE, OFFICE. AS PER PLANS AS PER CODE.) | — | Feb 14, 2025 |
| COM2024 | INSTALL (12) # LOW VOLTAGE AS PER CODE. | $6,000 | Jan 28, 2025 |
| COM2024 | INSTALL (25) # FIXTURES/DEVICES, (9) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $10,000 | Jan 24, 2025 |
| COM2024 | Amend permit: Add Contractor Change Contractor . Extend Original Permit.(original permit:COM2024-03427:REMOVE (12) EXISTING ANTENNAS, INSTALL (12) NEW ANTENNAS, AND UPGRADE/MODIFY ANCILLARY EQUIPMENT IN SUPPORT OF NEW ANTENNAS AS PER PLANS AS PER CODE.) Original Permit Description:(COM2024-03427) REMOVE (12) EXISTING ANTENNAS, INSTALL (12) NEW ANTENNAS, AND UPGRADE/MODIFY ANCILLARY EQUIPMENT IN SUPPORT OF NEW ANTENNAS AS PER PLANS AS PER CODE. | — | Jan 22, 2025 |
| COM2024 | REMOVE (12) EXISTING ANTENNAS, INSTALL (12) NEW ANTENNAS, AND UPGRADE/MODIFY ANCILLARY EQUIPMENT IN SUPPORT OF NEW ANTENNAS AS PER PLANS AS PER CODE. | $90,000 | Jan 15, 2025 |
| COM2024 | REMOVING THE EXISTING BRANCHLINES BACK TO THE MAIN IN THE AREA OF WORK. BFPE WILL INSTALL NEW BRANCH LINES AND CONCEALED SPRINKLERS (25 HEADS) TO PROVIDE THE PROPER COVERAGE IN THE NEWLY RENOVATED SPACE AS PER PLANS AS PER CODE. | $20,580 | Jan 14, 2025 |
| COM2024 | AMEND PERMIT: ADD HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2024-01319:SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS ------- RENOVATION, REPAIR AND RENEWAL OF ALL ASSOCIATED SYSTEMS IN THE FRANCIS SCOTT KEY PAVILION, ADMINISTRATION IMAGING OFFICES, PREP AND RECOVERY ROOM. THE RENOVATION ENCOMPASSES THE ADDITION OF A SIEMENS BI-PLANE ROOM, SUPPORTING EQUIPMENT, RENOVATED OFFICES & INCREASED SQUARE FOOTAGE OF THE PREP & RECOVERY ROOM. INLUDING THE RENOVATION OF EASILY REMOVED OBJECTS PERTAINING TO FURNITURE, FIXTURES & EQUIPMENT. THE RENOVATION PROJECT COVERS APPROXIMATLEY 3,371 SF. AS PER PLANS AS PER CODE.) Original Permit Description:(COM2024-01319) SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS ------- RENOVATION, REPAIR AND RENEWAL OF ALL ASSOCIATED SYSTEMS IN THE FRANCIS SCOTT KEY PAVILION, ADMINISTRATION IMAGING OFFICES, PREP AND RECOVERY ROOM. THE RENOVATION ENCOMPASSES THE ADDITION OF A SIEMENS BI-PLANE ROOM, SUPPORTING EQUIPMENT, RENOVATED OFFICES & INCREASED SQUARE FOOTAGE OF THE PREP & RECOVERY ROOM. INLUDING THE RENOVATION OF EASILY REMOVED OBJECTS PERTAINING TO FURNITURE, FIXTURES & EQUIPMENT. THE RENOVATION PROJECT COVERS APPROXIMATLEY 3,371 SF. AS PER PLANS AS PER CODE. | — | Dec 17, 2024 |
| COM2024 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2024-01319:SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS ------- RENOVATION, REPAIR AND RENEWAL OF ALL ASSOCIATED SYSTEMS IN THE FRANCIS SCOTT KEY PAVILION, ADMINISTRATION IMAGING OFFICES, PREP AND RECOVERY ROOM. THE RENOVATION ENCOMPASSES THE ADDITION OF A SIEMENS BI-PLANE ROOM, SUPPORTING EQUIPMENT, RENOVATED OFFICES & INCREASED SQUARE FOOTAGE OF THE PREP & RECOVERY ROOM. INLUDING THE RENOVATION OF EASILY REMOVED OBJECTS PERTAINING TO FURNITURE, FIXTURES & EQUIPMENT. THE RENOVATION PROJECT COVERS APPROXIMATLEY 3,371 SF. AS PER PLANS AS PER CODE.) Original Permit Description:(COM2024-01319) SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS ------- RENOVATION, REPAIR AND RENEWAL OF ALL ASSOCIATED SYSTEMS IN THE FRANCIS SCOTT KEY PAVILION, ADMINISTRATION IMAGING OFFICES, PREP AND RECOVERY ROOM. THE RENOVATION ENCOMPASSES THE ADDITION OF A SIEMENS BI-PLANE ROOM, SUPPORTING EQUIPMENT, RENOVATED OFFICES & INCREASED SQUARE FOOTAGE OF THE PREP & RECOVERY ROOM. INLUDING THE RENOVATION OF EASILY REMOVED OBJECTS PERTAINING TO FURNITURE, FIXTURES & EQUIPMENT. THE RENOVATION PROJECT COVERS APPROXIMATLEY 3,371 SF. AS PER PLANS AS PER CODE. | — | Dec 17, 2024 |
| COM2024 | SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS ------- RENOVATION, REPAIR AND RENEWAL OF ALL ASSOCIATED SYSTEMS IN THE FRANCIS SCOTT KEY PAVILION, ADMINISTRATION IMAGING OFFICES, PREP AND RECOVERY ROOM. THE RENOVATION ENCOMPASSES THE ADDITION OF A SIEMENS BI-PLANE ROOM, SUPPORTING EQUIPMENT, RENOVATED OFFICES & INCREASED SQUARE FOOTAGE OF THE PREP & RECOVERY ROOM. INLUDING THE RENOVATION OF EASILY REMOVED OBJECTS PERTAINING TO FURNITURE, FIXTURES & EQUIPMENT. THE RENOVATION PROJECT COVERS APPROXIMATLEY 3,371 SF. AS PER PLANS AS PER CODE. | $2,700,000 | Dec 9, 2024 |
| COM2024 | SCOPE OF WORK:------- LEVEL II INTERIOR ALTERATIONS ----- TO APPROX. 9,246 G.S.F. OF THE FIRST FLOOR OF THE JOHNS HOPKINS BAYVIEW MEDICAL CENTER AA BUILDING AS REQUIRED TO FITOUT ADMINISTRATIVE OFFICES, SUPPORT AREAS, AND SHELL SPACE. AS PER PLANS AND AS PER CODE. | $2,000,000 | Aug 26, 2024 |
| COM2024 | WORK CONSISTS OF MODIFYING THE EXISTING WET FIRE SPRINKLER SYSTEM BY RELOCATING (9) SPRINKLERS AND PLUGGING OTHERS TO ACCOMODATE NEW INT. ALT. ALL WORK SHALL ABIDE BY NFPA 13-2016 AND BALTIMORE CITY FIRE CODE. PLANS AND EQUIPMENT SUBMITTAL PROVIDED. AS PER PLANS AS PER CODE. | $8,000 | Aug 8, 2024 |
| COM2024 | AMEND PERMIT: ADD HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2024-00847:RENOVATION OF EXISTING EXAMINATION ROOM AND SUPPORT AREAS AS PER PLANS PER CODE.) Original Permit Description:(COM2024-00847) RENOVATION OF EXISTING EXAMINATION ROOM AND SUPPORT AREAS AS PER PLANS PER CODE. | — | Aug 1, 2024 |
| COM2024 | AMEND PERMIT: ADD PLUMBER CONTRACTOR . (ORIGINAL PERMIT:COM2024-00847:RENOVATION OF EXISTING EXAMINATION ROOM AND SUPPORT AREAS AS PER PLANS PER CODE.) Original Permit Description:(COM2024-00847) RENOVATION OF EXISTING EXAMINATION ROOM AND SUPPORT AREAS AS PER PLANS PER CODE. | — | Aug 1, 2024 |
| COM2024 | RENOVATION OF EXISTING EXAMINATION ROOM AND SUPPORT AREAS AS PER PLANS PER CODE. | $300,000 | Jul 30, 2024 |
| COM2024 | WORK CONSISTS OF ADDING 25, RELOCATING 45, PLUGGING, AND CORRECTING THE EXISTING FIRE SPRINKLER ZONE LAYOUT BETWEEN TWO SYSTEMS OVERLAPPING. ALL WORK SHALL BE IN ACCORDANCE WITH NFPA 13-2016, BALTIMORE CITY FIRE CODE, AND JHH SPECIFICATIONS. PLANS, EQUIPMENT DATA, AND HYDRAULIC CALCULATIONS PROVIDED AS PER PLANS AS PER CODE | $30,000 | Jul 9, 2024 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.