Baltimore City · 21224
5901 E LOMBARD ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $28,804,200
- Land use
- Commercial (C)
- Year built
- 1995
- Last sale
- Apr 21, 2025
Assessment
| Owner | SYNGENE USA INC |
|---|---|
| Land use | Commercial (C) |
| Total assessment | $28,804,200 (cycle 2026) |
| Last sale | Apr 21, 2025 — $29,833,000 |
| Year built | 1995 |
| Zoning | OIC |
| Vacant | — |
Permits
38| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2023 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-00704:SCOPE OF WORK:-----ADDITION----ADDITION OF A VERTICAL RECIPROCATING CONVEYOR (VRC) TO THE EXTERIOR OF THE EXISTING BUILDING. THE EXISTING BUILDING IS 3-STORIES HIGH WITH A GROSS BUILDING AREA OF APPOXIMATELY 105,000 SF AND A ‘FOOTPRINT’ OF 56,856 SF. (THE PRIMARY USE OF THE BUILDING IS THE PRODUCTION OF BIO-PHARMACEUTICAL PRODUCTS (F-1 OCCUPANCY)). THE NEW VRC WILL BE USED TO TRANSPORT NON-HAZARDOUS WASTE MATERIALS FROM THE THIRD FLOOR INTERIOR OF THE BUILDING TO THE FIRST FLOOR EXTERIOR OF THE BUILDING. IT WILL HAVE TWO STOPS: AN UPPER STOP WITH A DOOR LEADING TO THE 3RD FLOOR INTERIOR OF THE BUILDING, AND A LOWER STOP WITH A DOOR LEADING DIRECTLY TO THE BUILDING EXTERIOR. THE VRC WILL BE USED TO TRANSPORT MATERIALS ONLY. IT WILL NOT BE USED TO TRANSPORT PEOPLE. THE VRC WILL BE ENCLOSED IN A HOISTWAY DESIGNED TO BE COMPATIBLE WITH THE APPEARANCE OF THE EXISTING BUILDING. THE VRC HOISTWAY AND CARRIAGE WILL NOT BE HEATED OR COOLED. ----EXTERIOR ALTERATIONS----A PREFABRICATED POST-SUPPORTED CANOPY WILL BE PROVIDED AT THE GROUND FLOOR EXTERIOR DOOR. AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-00704) SCOPE OF WORK:-----ADDITION----ADDITION OF A VERTICAL RECIPROCATING CONVEYOR (VRC) TO THE EXTERIOR OF THE EXISTING BUILDING. THE EXISTING BUILDING IS 3-STORIES HIGH WITH A GROSS BUILDING AREA OF APPOXIMATELY 105,000 SF AND A ‘FOOTPRINT’ OF 56,856 SF. (THE PRIMARY USE OF THE BUILDING IS THE PRODUCTION OF BIO-PHARMACEUTICAL PRODUCTS (F-1 OCCUPANCY)). THE NEW VRC WILL BE USED TO TRANSPORT NON-HAZARDOUS WASTE MATERIALS FROM THE THIRD FLOOR INTERIOR OF THE BUILDING TO THE FIRST FLOOR EXTERIOR OF THE BUILDING. IT WILL HAVE TWO STOPS: AN UPPER STOP WITH A DOOR LEADING TO THE 3RD FLOOR INTERIOR OF THE BUILDING, AND A LOWER STOP WITH A DOOR LEADING DIRECTLY TO THE BUILDING EXTERIOR. THE VRC WILL BE USED TO TRANSPORT MATERIALS ONLY. IT WILL NOT BE USED TO TRANSPORT PEOPLE. THE VRC WILL BE ENCLOSED IN A HOISTWAY DESIGNED TO BE COMPATIBLE WITH THE APPEARANCE OF THE EXISTING BUILDING. THE VRC HOISTWAY AND CARRIAGE WILL NOT BE HEATED OR COOLED. ----EXTERIOR ALTERATIONS----A PREFABRICATED POST-SUPPORTED CANOPY WILL BE PROVIDED AT THE GROUND FLOOR EXTERIOR DOOR. AS PER PLANS AS PER CODE. | — | Jul 14, 2023 |
| COM2023 | SCOPE OF WORK:-----ADDITION----ADDITION OF A VERTICAL RECIPROCATING CONVEYOR (VRC) TO THE EXTERIOR OF THE EXISTING BUILDING. THE EXISTING BUILDING IS 3-STORIES HIGH WITH A GROSS BUILDING AREA OF APPOXIMATELY 105,000 SF AND A ‘FOOTPRINT’ OF 56,856 SF. (THE PRIMARY USE OF THE BUILDING IS THE PRODUCTION OF BIO-PHARMACEUTICAL PRODUCTS (F-1 OCCUPANCY)). THE NEW VRC WILL BE USED TO TRANSPORT NON-HAZARDOUS WASTE MATERIALS FROM THE THIRD FLOOR INTERIOR OF THE BUILDING TO THE FIRST FLOOR EXTERIOR OF THE BUILDING. IT WILL HAVE TWO STOPS: AN UPPER STOP WITH A DOOR LEADING TO THE 3RD FLOOR INTERIOR OF THE BUILDING, AND A LOWER STOP WITH A DOOR LEADING DIRECTLY TO THE BUILDING EXTERIOR. THE VRC WILL BE USED TO TRANSPORT MATERIALS ONLY. IT WILL NOT BE USED TO TRANSPORT PEOPLE. THE VRC WILL BE ENCLOSED IN A HOISTWAY DESIGNED TO BE COMPATIBLE WITH THE APPEARANCE OF THE EXISTING BUILDING. THE VRC HOISTWAY AND CARRIAGE WILL NOT BE HEATED OR COOLED. ----EXTERIOR ALTERATIONS----A PREFABRICATED POST-SUPPORTED CANOPY WILL BE PROVIDED AT THE GROUND FLOOR EXTERIOR DOOR. AS PER PLANS AS PER CODE. | $1,200,000 | Jul 3, 2023 |
| COM2023 | COPE OF WORK:---------LEVEL II INTERIOR ALTERATIONS ------REMOVAL OR AN AUTOCLAVE AND THE RECONFIGURATION OF EXISTING SPACES ON THE THIRD FLOOR (3RD FLOOR) OF AN EXISTING BUILDING TO CREATE THREE NEW AIRLOCKS. THE THREE NEW AIRLOCKS ARE TO REDUCE THE RISK OF PRODUCT CROSS-CONTAMINATION. THE EXISTING BUILDING IS 3-STORIES HIGH WITH A GROSS BUILDING AREA OF APPROXIMATELY 105,000 SF AND A ‘FOOTPRINT’ OF 56,856 SF. THE PRIMARY USE OF THE BUILDING IS THE PRODUCTION OF BIO-PHARMACEUTICAL PRODUCTS (F-1 OCCUPANCY). AS PER PLANS AS PER CODE. | $350,000 | Jun 30, 2023 |
| COM2021 | A TWO-LEVEL 859 SF BUILDING ADDITION HOUSING TWO NEW FREEZER MODULES, THE ADDITION IS AN EXTENSION TO AN ADJACENT BUILDING HOUSING FREEZER MODULES, THE PROJECT INCLUDES SUPPORTING SITE WORK AND RELOCATION OF ON-SITE UTILITIES AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEM. SHORING PLANS MUST BE SUBMITED TO THE CITY SIGNED AND SEALED BEFORE IMPLEMENTATION. | $2,000,000 | Jun 17, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2020-02531:EXPANDING EXISTING FIRE ALARM SYSTEM FOR FREEZER EXPANSION PROJECT. INSTALLING (1) NAC PANEL, (1) SMOKE DETECTOR, (2) SMOKE DETECTOR PHOTOELECTRIC WITH REMOTE TEST, (1) RELAY MODULE FOR AHU, (2) HORN STROBE OUTDOOR, (6) CEILING MOUNTED HORN STROBE. AS PER PLANS AND AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER SYSTEM.) Original Permit Description:(COM2020-02531) EXPANDING EXISTING FIRE ALARM SYSTEM FOR FREEZER EXPANSION PROJECT. INSTALLING (1) NAC PANEL, (1) SMOKE DETECTOR, (2) SMOKE DETECTOR PHOTOELECTRIC WITH REMOTE TEST, (1) RELAY MODULE FOR AHU, (2) HORN STROBE OUTDOOR, (6) CEILING MOUNTED HORN STROBE. AS PER PLANS AND AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER SYSTEM. | — | Jun 16, 2022 |
| COM2022 | NEW PRE-ACTION SYSTEM (9 HEADS) FOR NEW FREEZERS AS PER PLANS AS PER CODE. | $30,000 | May 3, 2022 |
| COM2022 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: SIGN INSTALLATION, INSTALLATION OF (1) DIRECT MOUNT ILLUMINATED SIGN FOR ''EMERGENT'', REPLACES EXISTING SIGNAGE AS SHOWN IN DRAWING, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS | $7,000 | Apr 12, 2022 |
| COM2022 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: SIGN INSTALLATION. INSTALLATION OF (1) DIRECT MOUNT ILLUMINATED SIGN FOR ''EMERGENT'', REPLACES EXISTING SIGNAGE AS SHOWN IN DRAWING, TOTAL SQ FT 182, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS | $5,000 | Apr 11, 2022 |
| COM2022 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: SIGN INSTALLATION, INSTALLATION OF (1) INTERNALLY ILLUMINATED ARCHITECTURAL CABINET TO ''SLEEVE'' OVER EXISTING MONUMENT, SIGN HEIGHT 5.7' SIGN WIDTH 10 FT, TOTAL SQFT 57', ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS | $5,000 | Apr 7, 2022 |
| COM2021 | Extend Original Permit.(original permit:COM2020-02531:EXPANDING EXISTING FIRE ALARM SYSTEM FOR FREEZER EXPANSION PROJECT. INSTALLING (1) NAC PANEL, (1) SMOKE DETECTOR, (2) SMOKE DETECTOR PHOTOELECTRIC WITH REMOTE TEST, (1) RELAY MODULE FOR AHU, (2) HORN STROBE OUTDOOR, (6) CEILING MOUNTED HORN STROBE. AS PER PLANS AND AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER SYSTEM.) Original Permit Description:(COM2020-02531) EXPANDING EXISTING FIRE ALARM SYSTEM FOR FREEZER EXPANSION PROJECT. INSTALLING (1) NAC PANEL, (1) SMOKE DETECTOR, (2) SMOKE DETECTOR PHOTOELECTRIC WITH REMOTE TEST, (1) RELAY MODULE FOR AHU, (2) HORN STROBE OUTDOOR, (6) CEILING MOUNTED HORN STROBE. AS PER PLANS AND AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER SYSTEM. | — | Oct 26, 2021 |
| COM2021 | AMEND PERMIT COM2021-01779 PLAN 2021-1214 ISSUED 6/9/2021 TO: REVISE ELECTRICAL DRAWINGS TO ADD 480V POWER TO PROVIDE POWER TO THE CO2 VAPORIZER AS PER PLANS AS PER CODE. | $20,000 | Jul 28, 2021 |
| COM2021 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2021-01691:AMEND PERMIT COM2020-03147 PLAN 2020-2493 ISSUED 3/4/2021 TO: PLACE THE NEW PILE SUPPORTED GENERATOR PLATFORMS AT A DIFFERENT LOCATION ON THE PROJECT SITE FURTHER TO THE NORTH AND WEST OF THE PRIOR APPROVED LOCATION, THE GENERATOR PLATFORMS ARE ALSO NO LONGER PLANNED TO BE SIDE-BY-SIDE AND NO IN INDIVIDUAL AND SEPARATE LOCATIONS AS PER PLANS AS PER CODE.) Original Permit Description:(COM2021-01691) AMEND PERMIT COM2020-03147 PLAN 2020-2493 ISSUED 3/4/2021 TO: PLACE THE NEW PILE SUPPORTED GENERATOR PLATFORMS AT A DIFFERENT LOCATION ON THE PROJECT SITE FURTHER TO THE NORTH AND WEST OF THE PRIOR APPROVED LOCATION, THE GENERATOR PLATFORMS ARE ALSO NO LONGER PLANNED TO BE SIDE-BY-SIDE AND NO IN INDIVIDUAL AND SEPARATE LOCATIONS AS PER PLANS AS PER CODE. | — | Jul 27, 2021 |
| COM2021 | AMEND PERMIT COM2020-03147 PLAN 2020-2493 ISSUED 3/4/2021 TO: PLACE THE NEW PILE SUPPORTED GENERATOR PLATFORMS AT A DIFFERENT LOCATION ON THE PROJECT SITE FURTHER TO THE NORTH AND WEST OF THE PRIOR APPROVED LOCATION, THE GENERATOR PLATFORMS ARE ALSO NO LONGER PLANNED TO BE SIDE-BY-SIDE AND NO IN INDIVIDUAL AND SEPARATE LOCATIONS AS PER PLANS AS PER CODE. | $2,000,000 | Jul 16, 2021 |
| COM2021 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2021-01779:SCOPE OF WORK:---AMEND PERMIT COM2021-01131 PLAN 2021-742 ISSUED 5/17/2021---- TO: ADD ELECTRICAL DRAWINGS FOR POWER, LIGHTING, AND GROUNDING AND TO SUPPORT BULK CO2 STORAGE TANK AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2021-01779) SCOPE OF WORK:---AMEND PERMIT COM2021-01131 PLAN 2021-742 ISSUED 5/17/2021---- TO: ADD ELECTRICAL DRAWINGS FOR POWER, LIGHTING, AND GROUNDING AND TO SUPPORT BULK CO2 STORAGE TANK AS PER PLANS AS PER CODE. | — | Jun 15, 2021 |
| COM2021 | AMEND PERMIT: ADD PRIME CONTRACTOR . (ORIGINAL PERMIT:COM2021-01131:SCOPE OF WORK:---PAVING----NEW 20’ X 18’ CONCRETE SLAB PAD AND---- FENCING----ENCLOSURE FOR BULK CO2 TANKS TO SUPPORT THE EXISTING ADJACENT FACILITY FREEZER BUILDING, THE TANK SLAB IS ELEVATED WITH STAIRS TO SECURE FENCE GATE AND AN 8’ HIGH PERIMETER FENCE AROUND THE SLAB AS PER PLANS AS PER CODE.) Original Permit Description:(COM2021-01131) SCOPE OF WORK:---PAVING----NEW 20’ X 18’ CONCRETE SLAB PAD AND---- FENCING----ENCLOSURE FOR BULK CO2 TANKS TO SUPPORT THE EXISTING ADJACENT FACILITY FREEZER BUILDING, THE TANK SLAB IS ELEVATED WITH STAIRS TO SECURE FENCE GATE AND AN 8’ HIGH PERIMETER FENCE AROUND THE SLAB AS PER PLANS AS PER CODE. | — | Jun 15, 2021 |
| COM2021 | SCOPE OF WORK:---AMEND PERMIT COM2021-01131 PLAN 2021-742 ISSUED 5/17/2021---- TO: ADD ELECTRICAL DRAWINGS FOR POWER, LIGHTING, AND GROUNDING AND TO SUPPORT BULK CO2 STORAGE TANK AS PER PLANS AS PER CODE. | $20,000 | Jun 9, 2021 |
| COM2021 | SCOPE OF WORK:---PAVING----NEW 20’ X 18’ CONCRETE SLAB PAD AND---- FENCING----ENCLOSURE FOR BULK CO2 TANKS TO SUPPORT THE EXISTING ADJACENT FACILITY FREEZER BUILDING, THE TANK SLAB IS ELEVATED WITH STAIRS TO SECURE FENCE GATE AND AN 8’ HIGH PERIMETER FENCE AROUND THE SLAB AS PER PLANS AS PER CODE. | $18,000 | May 17, 2021 |
| COM2021 | AMEND PLAN NO. 2020-2071 COM 2020-02623 ISSUED 10/29/20 DUE TO OWNERS REQUEST, ADDING 2 ADDITIONAL DRY SPRINKLERS FOR EXPANDED FREEZER, RELOCATING 2 AND ADDING 1 IN THE ANTEROOM AS PER PLANS AS PER CODE. | $500 | Mar 11, 2021 |
| COM2020 | NEW PILE SUPPORTED PLATFORMS TO ACCOMMODATE EMERGENCY GENERATORS TO SUPPORT THE EXISTING ON-SITE FACILITY, THE EMERGENCY GENERATORS INCLUDE ONE EXISTING RELOCATED AND ONE NEW GENERATOR, SCOPE INCLUDES THE CONSTRUCTION OF NEW PILE SUPPORTED ELEVATED GENERATOR PLATFORMS, EMERGENCY GENERATORS, AND ASSOCIATED UTILITY CONNECTIONS FOR THE GENERATORS TO THE EXISTING FACILITY BUILDING, ELECTRICAL RACEWAYS INCLUDE ROUTING THROUGH NEW FREEZER EXPANSION PROJECT UNDER EPLANS #2020-1510 AND THE EXISTING MAIN FACILITY BUILDING. MINOR SITE WORK FOR MAINTENANCE WALK ACCESS TO GENERATOR PLATFORMS AS PER PLANS AS PER CODE. | $2,000,000 | Mar 4, 2021 |
| COM2020 | SCOPE OF WORK:----ACCESS STRUCTURE----THE PROJECT CONSISTS OF A 513 SQ. FT. PRE-ENGINEERED MODULAR STORAGE SHED FOR STORAGE OF HAZARDOUS CHEMICAL MATERIALS, THE SHED WILL HAVE ELECTRICAL POWER CONNECTION, THE SHED WILL BE PLACED ON AN EXISTING ASPHALT PAVED AREA, STRIP CONCRETE SPREADING FOOTING ALONG THE SHED SUPPORT RAILS WILL BE INSTALLED IN PLACE OF THE EXISTING ASPHALT PAVEMENT WITH HOLD DOWN BRACKETS ANCHORED INTO CONCRETE AS PER PLANS AS PER CODE. | $100,000 | Feb 19, 2021 |
| COM2021 | AMEND TO ADD ELECTRICAL CONTRACTOR: (ORIGINAL PERMIT:COM2020-02640:COVID-19 TEMPORARY SPACE: CONTRUCTION OF 19’-10 ½” X 88’-6 ½”, NEW TWO STORY, PRE-ENGINEERED FLEX MODULAR OFFICE BUILDING AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2020-02640) COVID-19 TEMPORARY SPACE: CONTRUCTION OF 19’-10 ½” X 88’-6 ½”, NEW TWO STORY, PRE-ENGINEERED FLEX MODULAR OFFICE BUILDING AS PER PLANS AS PER CODE. | — | Jan 6, 2021 |
| USE2020 | USE PORTION OF PREMISES AS NEW TWO-STORY PRE-ENGINEERED FLEX/MODULAR BUILDING AS AN OFFICES | — | Dec 24, 2020 |
| COM2020 | COVID-19 TEMPORARY SPACE: CONTRUCTION OF 19’-10 ½” X 88’-6 ½”, NEW TWO STORY, PRE-ENGINEERED FLEX MODULAR OFFICE BUILDING AS PER PLANS AS PER CODE. | $150,000 | Dec 4, 2020 |
| COM2020 | ADD 25 NEW SPRINKLERS FOR FREEZER ADDITION AS PER PLANS AS PER CODE | $22,000 | Oct 29, 2020 |
| COM2020 | EXPANDING EXISTING FIRE ALARM SYSTEM FOR FREEZER EXPANSION PROJECT. INSTALLING (1) NAC PANEL, (1) SMOKE DETECTOR, (2) SMOKE DETECTOR PHOTOELECTRIC WITH REMOTE TEST, (1) RELAY MODULE FOR AHU, (2) HORN STROBE OUTDOOR, (6) CEILING MOUNTED HORN STROBE. AS PER PLANS AND AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER SYSTEM. | $2 | Oct 23, 2020 |
| COM2020 | Extend Original Permit.(original permit:COM2019-03644:PRE-ENGINEERED FLEX MODULE TEMPORARY CONSTRUCTION OFFICE TRAILER TO BE PLACED ON AN EXISTING PAVED PARKING LOT, CUSTOMIZED MODULE-BASED SYSTEM THAT IS PRE-ASSEMBLED, WILL HAVE ELECTRICAL POWER CONNECTION, TRAILER’S RESTROOM WILL BE SERVED BY EXTERIOR GROUND MOUNTED HOLDING TANKS FOR WATER AND SEWAGE THAT WILL BE PERIODICALLY REFILLED AND EMPTIED, TRAILER FOUNDATION WILL REST AT GRADE ON THE EXISTING ASPHALT SURFACE WITH STRAP AND ANCHORAGE DRIVEN INTO ASPHALT / GROUND AS PER PLANS AS PER CODE.) Original Permit Description:(COM2019-03644) PRE-ENGINEERED FLEX MODULE TEMPORARY CONSTRUCTION OFFICE TRAILER TO BE PLACED ON AN EXISTING PAVED PARKING LOT, CUSTOMIZED MODULE-BASED SYSTEM THAT IS PRE-ASSEMBLED, WILL HAVE ELECTRICAL POWER CONNECTION, TRAILER’S RESTROOM WILL BE SERVED BY EXTERIOR GROUND MOUNTED HOLDING TANKS FOR WATER AND SEWAGE THAT WILL BE PERIODICALLY REFILLED AND EMPTIED, TRAILER FOUNDATION WILL REST AT GRADE ON THE EXISTING ASPHALT SURFACE WITH STRAP AND ANCHORAGE DRIVEN INTO ASPHALT / GROUND AS PER PLANS AS PER CODE. | — | Oct 20, 2020 |
| COM2020 | Extend Original Permit.(original permit:COM2019-03292:INTERIOR RENOVATION AND FITOUT TO APPROXIMATELY 6% OF THE EXISTING BUILDING FOR THE FACILITIES’ BIOMEDICAL MANUFACTURING OPERATIONS. INTERIOR RENOVATION OCCURS ON THE FIRST AND SECOND FLOORS AND THE EXISTING THREE FLOOR BUILDING. FIRST FLOOR INTERIOR RENOVATION INCLUDES FLOORING AND FINISH REPLACEMENT IN THE LOBBY. SECOND FLOOR INTERIOR RENOVATION INCLUDES DEMOLITION WORK FOR EXISTING SPACE AND INTERIOR RENOVATION TO OFFICE SPACE WHICH INCLUDES; CONFERENCE ROOMS, OFFICES, OPEN WORK AREAS, STORAGE SPACE, AND RESTROOMS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS.) Original Permit Description:(COM2019-03292) INTERIOR RENOVATION AND FITOUT TO APPROXIMATELY 6% OF THE EXISTING BUILDING FOR THE FACILITIES’ BIOMEDICAL MANUFACTURING OPERATIONS. INTERIOR RENOVATION OCCURS ON THE FIRST AND SECOND FLOORS AND THE EXISTING THREE FLOOR BUILDING. FIRST FLOOR INTERIOR RENOVATION INCLUDES FLOORING AND FINISH REPLACEMENT IN THE LOBBY. SECOND FLOOR INTERIOR RENOVATION INCLUDES DEMOLITION WORK FOR EXISTING SPACE AND INTERIOR RENOVATION TO OFFICE SPACE WHICH INCLUDES; CONFERENCE ROOMS, OFFICES, OPEN WORK AREAS, STORAGE SPACE, AND RESTROOMS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. | — | Oct 20, 2020 |
| COM2020 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR(ORIGINAL PERMIT:COM2020-01920:INSTALLATION AND MODIFICATIONS FOR AN AUTOMATIC TRANSFER SWITCH (ATS) AND SUPPORTING CONNECTION AND MODIFICATIONS NECESSARY TO TIE IN THE EQUIPMENT TO THE EXISTING BUILDING FACILITY AND ELECTRICAL SYSTEMS, WORK INCLUDES MODIFICATION WITHIN THE EXISTING BUILDING INSIDE TWO EXISTING ELECTRICAL ROOMS, WORK INCLUDES THE NEW ATS EQUIPMENT AS WELL AS MODIFICATIONS TO PANELBOARDS AND CONTROLS FOR EQUIPMENT TIE IN, THE PROJECT INCLUDES ACQUISITION OF A NEW EMERGENCY GENERATOR LOCATED ON AN EXISTING CONCRETE PAD (THE PLACEMENT AND EXTERIOR CONNECTIONS FOR THAT GENERATOR WILL BE PART OF A SEPARATE FUTURE PROJECT WHICH WILL BE SUBMITTED AS A SEPARATE FUTURE PERMIT) AS PER PLANS AS PER CODE.) Original Permit Description:(COM2020-01920) INSTALLATION AND MODIFICATIONS FOR AN AUTOMATIC TRANSFER SWITCH (ATS) AND SUPPORTING CONNECTION AND MODIFICATIONS NECESSARY TO TIE IN THE EQUIPMENT TO THE EXISTING BUILDING FACILITY AND ELECTRICAL SYSTEMS, WORK INCLUDES MODIFICATION WITHIN THE EXISTING BUILDING INSIDE TWO EXISTING ELECTRICAL ROOMS, WORK INCLUDES THE NEW ATS EQUIPMENT AS WELL AS MODIFICATIONS TO PANELBOARDS AND CONTROLS FOR EQUIPMENT TIE IN, THE PROJECT INCLUDES ACQUISITION OF A NEW EMERGENCY GENERATOR LOCATED ON AN EXISTING CONCRETE PAD (THE PLACEMENT AND EXTERIOR CONNECTIONS FOR THAT GENERATOR WILL BE PART OF A SEPARATE FUTURE PROJECT WHICH WILL BE SUBMITTED AS A SEPARATE FUTURE PERMIT) AS PER PLANS AS PER CODE. | — | Sep 10, 2020 |
| COM2020 | INSTALLATION AND MODIFICATIONS FOR AN AUTOMATIC TRANSFER SWITCH (ATS) AND SUPPORTING CONNECTION AND MODIFICATIONS NECESSARY TO TIE IN THE EQUIPMENT TO THE EXISTING BUILDING FACILITY AND ELECTRICAL SYSTEMS, WORK INCLUDES MODIFICATION WITHIN THE EXISTING BUILDING INSIDE TWO EXISTING ELECTRICAL ROOMS, WORK INCLUDES THE NEW ATS EQUIPMENT AS WELL AS MODIFICATIONS TO PANELBOARDS AND CONTROLS FOR EQUIPMENT TIE IN, THE PROJECT INCLUDES ACQUISITION OF A NEW EMERGENCY GENERATOR LOCATED ON AN EXISTING CONCRETE PAD (THE PLACEMENT AND EXTERIOR CONNECTIONS FOR THAT GENERATOR WILL BE PART OF A SEPARATE FUTURE PROJECT WHICH WILL BE SUBMITTED AS A SEPARATE FUTURE PERMIT) AS PER PLANS AS PER CODE. | $600,000 | Aug 25, 2020 |
| COM2020 | FREEZER EXPANSION WITHIN THE EXISTING FACILITY AND DEMOLITION OF THE OUTDOOR EXISTING GENERATOR (NEW GENERATOR WILL BE INSTALLED AT A LATER DATE AND TEMPORARY GENERATORS WILL BE USED IN THE INTERIM) AS PER PLANS AS PER CODE. PLUMBING IS EXISTING TO REMAIN. SEPARATE PERMIT REQUIRED FOR GENERATOR INSTALLATION AND HOOK-UP. | $2,000,000 | Aug 24, 2020 |
| USE2020 | USE PORTION OF PREMISES (NEWLY RENOVATED SPACE IN EXISTING TENANT SPACE) FOR EXPANDED BREAK ROOMS AND WORKSPACE AREA. | — | Aug 14, 2020 |
| COM2020 | INSTALL (156) # LOW VOLTAGE AS PER CODE. | $30,000 | Jun 15, 2020 |
| COM2020 | TO ADD 5 AND RELOCATE 17 SPRINKLER HEADS TO PROVIDE PROPER COVERAGE NFPA 13 AND THE AHJ AS PER PLANS AS PER CODE. | $9,540 | Mar 4, 2020 |
| COM2020 | FIRE ALARM PERMIT AS PER PLANS AS PER CODE. | $3,900 | Feb 19, 2020 |
| COM2020 | AMEND PERMIT: ADD HVAC AND PLUMBER CONTRACTOR . (ORIGINAL PERMIT:COM2019-03292:INTERIOR RENOVATION AND FITOUT TO APPROXIMATELY 6% OF THE EXISTING BUILDING FOR THE FACILITIES’ BIOMEDICAL MANUFACTURING OPERATIONS. INTERIOR RENOVATION OCCURS ON THE FIRST AND SECOND FLOORS AND THE EXISTING THREE FLOOR BUILDING. FIRST FLOOR INTERIOR RENOVATION INCLUDES FLOORING AND FINISH REPLACEMENT IN THE LOBBY. SECOND FLOOR INTERIOR RENOVATION INCLUDES DEMOLITION WORK FOR EXISTING SPACE AND INTERIOR RENOVATION TO OFFICE SPACE WHICH INCLUDES; CONFERENCE ROOMS, OFFICES, OPEN WORK AREAS, STORAGE SPACE, AND RESTROOMS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS.) Original Permit Description:(COM2019-03292) INTERIOR RENOVATION AND FITOUT TO APPROXIMATELY 6% OF THE EXISTING BUILDING FOR THE FACILITIES’ BIOMEDICAL MANUFACTURING OPERATIONS. INTERIOR RENOVATION OCCURS ON THE FIRST AND SECOND FLOORS AND THE EXISTING THREE FLOOR BUILDING. FIRST FLOOR INTERIOR RENOVATION INCLUDES FLOORING AND FINISH REPLACEMENT IN THE LOBBY. SECOND FLOOR INTERIOR RENOVATION INCLUDES DEMOLITION WORK FOR EXISTING SPACE AND INTERIOR RENOVATION TO OFFICE SPACE WHICH INCLUDES; CONFERENCE ROOMS, OFFICES, OPEN WORK AREAS, STORAGE SPACE, AND RESTROOMS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. | — | Feb 3, 2020 |
| COM2020 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2019-03292:INTERIOR RENOVATION AND FITOUT TO APPROXIMATELY 6% OF THE EXISTING BUILDING FOR THE FACILITIES’ BIOMEDICAL MANUFACTURING OPERATIONS. INTERIOR RENOVATION OCCURS ON THE FIRST AND SECOND FLOORS AND THE EXISTING THREE FLOOR BUILDING. FIRST FLOOR INTERIOR RENOVATION INCLUDES FLOORING AND FINISH REPLACEMENT IN THE LOBBY. SECOND FLOOR INTERIOR RENOVATION INCLUDES DEMOLITION WORK FOR EXISTING SPACE AND INTERIOR RENOVATION TO OFFICE SPACE WHICH INCLUDES; CONFERENCE ROOMS, OFFICES, OPEN WORK AREAS, STORAGE SPACE, AND RESTROOMS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS.) Original Permit Description:(COM2019-03292) INTERIOR RENOVATION AND FITOUT TO APPROXIMATELY 6% OF THE EXISTING BUILDING FOR THE FACILITIES’ BIOMEDICAL MANUFACTURING OPERATIONS. INTERIOR RENOVATION OCCURS ON THE FIRST AND SECOND FLOORS AND THE EXISTING THREE FLOOR BUILDING. FIRST FLOOR INTERIOR RENOVATION INCLUDES FLOORING AND FINISH REPLACEMENT IN THE LOBBY. SECOND FLOOR INTERIOR RENOVATION INCLUDES DEMOLITION WORK FOR EXISTING SPACE AND INTERIOR RENOVATION TO OFFICE SPACE WHICH INCLUDES; CONFERENCE ROOMS, OFFICES, OPEN WORK AREAS, STORAGE SPACE, AND RESTROOMS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. | — | Jan 8, 2020 |
| COM2019 | pre-engineered flex module temporary construction office trailer to be placed on an existing paved parking lot, customized module-based system that is pre-assembled, will have electrical power connection, trailer’s restroom will be served by exterior ground mounted holding tanks for water and sewage that will be periodically refilled and emptied, trailer foundation will rest at grade on the existing asphalt surface with strap and anchorage driven into asphalt / ground as per plans as per code. | $80,000 | Dec 20, 2019 |
| COM2019 | interior renovation and fitout to approximately 6% of the existing building for the facilities’ biomedical manufacturing operations. interior renovation occurs on the first and second floors and the existing three floor building. first floor interior renovation includes flooring and finish replacement in the lobby. second floor interior renovation includes demolition work for existing space and interior renovation to office space which includes; conference rooms, offices, open work areas, storage space, and restrooms as per plans as per code. separate permits are required for sprinkler, fire alarm, and detection systems. | $500,000 | Dec 20, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.