Baltimore City · 21206
4517 HAZELWOOD AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $10,520,933
- Land use
- Exempt Commercial (EC)
- Year built
- —
- Last sale
- Nov 6, 1953
Assessment
| Owner | MAYOR AND CITY COUNCIL OF |
|---|---|
| Land use | Exempt Commercial (EC) |
| Total assessment | $10,520,933 (cycle 2026) |
| Last sale | Nov 6, 1953 |
| Year built | — |
| Zoning | R-3 |
| Vacant | — |
Permits
8| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | Install fire alarm system for new rec center Electrical work is being installed under permit number COM2024-00131 | $0 | Apr 14, 2026 |
| BCCM | Install 30 temperature control devices as per code. | $25,000 | Dec 3, 2025 |
| COM2024 | ****** [4600 HAMILTON AVE] ******** SCOPE OF WORK: ------ NEW CONSTRUCTION ------ OF NEW RECREATION CENTER BUILDING, WORK TO INCLUDE ALL ASSOCIATED SITE WORK AS PER PLANS AS PER CODE. LOW VOLTAGE CONTRACTOR F C R ENTERPISES INC; LICENSE NUMBER 03837382 | $15,000,000 | Jun 21, 2024 |
| USE2023 | USE A PORTION OF THE BUILDING FOR SCHOOL-AGE CHILDCARE FOR 150 CHILDREN, AGES 4 TO 14, JANUARY-DECEMBER, MONDAY - FRIDAY, 6:30 AM - 6:30 PM. | — | Mar 18, 2024 |
| BMZ2024 | to use the premises k/s 4600 hamilton ave as a community & recreation center. | — | Mar 5, 2024 |
| USE2021 | TO PROVIDE BEFORE, AFTER AND SCHOOL CLOSING CARE TO UP TO 200 SCHOOL AGE CHILDREN AT HAZELWOOD ELEMENTARY SCHOOL (CAFETERIA, GYMNASIUM, AUDITORIUM). | — | Jun 14, 2022 |
| COM2021 | SCOPE OF WORK:----ACCESSORY STRUCTURE----INSTALL TWO OUTDOOR PAVILIONS AT HAZELWOOD ELEMENTARY SCHOOL AS PART OF THE BALTIMORE OUTDOOR LEARNING PROGRAM (A PARTERNSHIP OF THE BALTIMORE CITY DEPARTMENT OF PLANNING AND BALTIMORE CITY PUBLIC SCHOOLS)AS PER PLANS AS PER CODE. | $19,664 | Nov 3, 2021 |
| COM2019 | addition of air conditioning to the majority of classrooms at hazelwood elementary / middle school, facility is a 66,000 square foot building, independent packaged heat pump air conditioning units are to be installed in each classroom, units will be equipped with air cooled direct expansion (dx) cooling, electric heat and energy recovery (i.e. energy recovery wheel). modifications to the window system and the casework in each classroom are required for the installation of these units, an upgrade of the existing bge service to accommodate the increase loads associated with the hvac equipment, will include the extension of a new primary service ductbank from the existing manhole to the location of the new bge pad mounted transformer, a new secondary service ductbank will also be provided from the pad mounted transformer to the new switchboard, new branch circuit panelboards will be served from the switchboard and will serve the new hvac equipment, new switchboard will also be used to back feed the existing electrical distribution system and has been sized to serve future hvac equipment in areas not included within this project, once the new service is in place, the existing bge service will be removed in its entirety inclusive of the bge vault mounted transformers as per plans as per code. | $1,620,000 | Dec 12, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMMar 27, 2026 · 99 m · 5706 NEWHOLME AVE
- violation: HCD-Illegal DumpingJan 4, 2026 · 148 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.