Baltimore City · 21209
1330 SMITH AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $7,528,100
- Land use
- Industrial (I)
- Year built
- 1992
- Last sale
- Mar 23, 1989
Assessment
| Owner | WASHINGTONVILLE LIMITED |
|---|---|
| Land use | Industrial (I) |
| Total assessment | $7,528,100 (cycle 2026) |
| Last sale | Mar 23, 1989 — $700,000 |
| Year built | 1992 |
| Zoning | IMU-1 |
| Vacant | — |
Permits
26| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | Install five new floor receptacles, and four new wall receptacles. | $2,600 | Jun 4, 2026 |
| BCCM | Scope of Work: Exterior Alterations to include: Sign installation: Install 2 non-illuminated wall signs and 1 non-illuminated Pole Sign, as per code as per plans | $9,000 | Feb 10, 2026 |
| COM2024 | AMEND PERMIT# COM2024-00201 (PLAN# 2024-187) TO INCLUDE THE CHANGEOUT OF THE 1600 AMP TAP BOX IN THE CLOUDED IN AREA OF THE NEW DRAWING AS PER PLANS AS PER CODE. | — | Apr 7, 2025 |
| COM2024 | Extend Original Permit.(original permit:COM2023-86917:REPLACE (2) 748 BTU REFRIGERATION SYSTEM, REPLACE (2) 789 BTU REFRIGERATION AS PER CODE. PER PLANNING DEPT: APWC - THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.************** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS) Original Permit Description:(COM2023-86917) REPLACE (2) 748 BTU REFRIGERATION SYSTEM, REPLACE (2) 789 BTU REFRIGERATION AS PER CODE. PER PLANNING DEPT: APWC - THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.************** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS | — | Dec 31, 2024 |
| COM2024 | ADD A CELL COMMUNICATOR TO AN EXISTING LOW VOLTAGE FIRE ALARM SYSTEM AS PER PLANS AS PER CODE. | $6,300 | Oct 24, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2023-89778:REPLACE (4) 748 BTU REFRIGERATION UNITS AS PER CODE.********** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.) Original Permit Description:(COM2023-89778) REPLACE (4) 748 BTU REFRIGERATION UNITS AS PER CODE.********** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS. | — | Jun 25, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2023-86917:REPLACE (2) 748 BTU REFRIGERATION SYSTEM, REPLACE (2) 789 BTU REFRIGERATION AS PER CODE. PER PLANNING DEPT: APWC - THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.************** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS) Original Permit Description:(COM2023-86917) REPLACE (2) 748 BTU REFRIGERATION SYSTEM, REPLACE (2) 789 BTU REFRIGERATION AS PER CODE. PER PLANNING DEPT: APWC - THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.************** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS | — | Jun 25, 2024 |
| COM2024 | REPLACE REFRIGERATION SYSTEM ELECTRIC AND LOW VOLTAGE CONTROLS. NEW 600A DISCONNECT. AS PER PLANS AS CODE. | $311,461 | Mar 13, 2024 |
| COM2023 | REPLACE (4) 748 BTU REFRIGERATION UNITS AS PER CODE.********** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS. | $300,000 | Dec 18, 2023 |
| COM2023 | REPLACE (2) 748 BTU REFRIGERATION SYSTEM, REPLACE (2) 789 BTU REFRIGERATION AS PER CODE. PER PLANNING DEPT: APWC - THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.************** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 190 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 200.2 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (10.2 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS | $311,461 | Dec 18, 2023 |
| USE2023 | USE 3RD FLOOR - SUITE 9 FOR/AS OFFICE FOR BEHAVIORAL HEALTH PROVIDER | — | Nov 21, 2023 |
| COM2023 | MODIFY EXSITING FIRE SPRINKLER SYSTEM PER NFPA 13 (1 SPRINKLER) AS PER PLANS AS PER CODE. | $125 | Oct 3, 2023 |
| COM2023 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2022-03550:SCOPE OF WORK:------INTERIOR ALTERATIONS------TO CREATE MDF ROOM, CONSTRUCT NEW WALLS AND DOORS, PIPING AND INSTALLATION OF NEW MINISPLIT SYSTEM, AND ASSOCIATED ELECTRICAL WORK, SOME EXISTING EQUIPMENT RELOCATION, NO FOOD SERVICE EFFECTED AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-03550) SCOPE OF WORK:------INTERIOR ALTERATIONS------TO CREATE MDF ROOM, CONSTRUCT NEW WALLS AND DOORS, PIPING AND INSTALLATION OF NEW MINISPLIT SYSTEM, AND ASSOCIATED ELECTRICAL WORK, SOME EXISTING EQUIPMENT RELOCATION, NO FOOD SERVICE EFFECTED AS PER PLANS AS PER CODE. | — | Mar 21, 2023 |
| COM2022 | SCOPE OF WORK:------INTERIOR ALTERATIONS------TO CREATE MDF ROOM, CONSTRUCT NEW WALLS AND DOORS, PIPING AND INSTALLATION OF NEW MINISPLIT SYSTEM, AND ASSOCIATED ELECTRICAL WORK, SOME EXISTING EQUIPMENT RELOCATION, NO FOOD SERVICE EFFECTED AS PER PLANS AS PER CODE. | $10,000 | Feb 1, 2023 |
| USE2022 | CONTINUE TO USE FIRST FLOOR OF ENGINE HOUSE FOR RETAIL SALES OF BEER, WIN AND LIQUOR (NEW OPERATOR) PER PUD ORD. 08-97. | — | Oct 21, 2022 |
| USE2022 | THIS OFFICE WILL FUNCTION AS A NEW OFFICE OF THE DRIVING SCHOOL: WITHIN THE SAME BUSINESS CENTER. THE NEW OFFICE WILL BE IN THE MAIN 1340 OFFICE BUILDING, 3RD FLOOR, SUITE 10B (ALSO KNOWN AS SUITE 310-B) | — | Jul 15, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2021-02771:SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR ALTERATIONS TO EXISTING GROCERY STORE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2021-02771) SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR ALTERATIONS TO EXISTING GROCERY STORE AS PER PLANS AS PER CODE. | — | May 31, 2022 |
| COM2022 | ADDING 14 SPRINKLER HEADS PER NFPA-13 TO EXISTING SPRINKLER SYSTEM WITHIN RENOVATED BUILDING AS PER PLANS AS PER CODE. | $25,000 | May 12, 2022 |
| COM2021 | SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR ALTERATIONS TO EXISTING GROCERY STORE AS PER PLANS AS PER CODE. | $25,000 | Nov 3, 2021 |
| COM2021 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: SIGN INSTALLATION, SIGN A REPLACE EXISTING NON ILLUMINATED REVERSE CHANNEL LETTER SIGN 30” H X 293.18'' W CUSTOM REVERSE CHANNEL LETTERS -FLUSH MOUNT SIGN B PANEL 41''H X 186''W W/ PERIMETER FRAME AND REVERSE CHANNEL LETTERS (NON ILLUMINATED), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS | $12,800 | May 19, 2021 |
| USE2020 | THIS LOCATION (1330 SMITH AVE, SUITE 3) IS TO FUNCTION AS AN OFFICE OF A DRIVING SCHOOL. THE CONFERENCE ROOM IN THE 1340 SMITH AVE. WILL FUNCTION AS A CLASSROOM. | — | Aug 5, 2020 |
| COM2019 | demolition of interior partition walls and removal minor closets and install new 2x4 stud wall partition walls as shown on plans. all work shall be per plans and baltimore city building codes. | $5,000 | Oct 29, 2019 |
| COM2019 | sign installation: one wall mounted sign - non illuminated front of building 350"x21"=51.04 sft and 225"x14"= 21.875 sft and one on side sign installed on existing frame - non illuminated 13'x5'=65', as per plans and as per code. | $3,000 | Aug 15, 2019 |
| COM2019 | per plan:: sign is above the fpe scope of work: exterior alterations to include: sign installation, installation of non-illuminated channel letters and dimensional letters onto existing blank sign panel (sign dimensions: 5'-1 1/2"x2'-6 1/2"), all work will be done according to baltimore city code and per submitted sketch. (customer should be working on private property) | $3,700 | Jul 3, 2019 |
| USE2019 | mental health agency ( office ) | — | Apr 26, 2019 |
| USE2019 | use and occupancy permit only. facility used to be a pnc bank and will now be a coldwell banker real estate office. space is being painted and mobile desks/chairs added. no other alterations or changes to the occupancy being performed. | — | Mar 28, 2019 |
Violations
0No violations on record.
Inspections
2| Type | Status | Action | Date |
|---|---|---|---|
| InitialSI | Not Finished | ISSUE NOTICE | Dec 26, 2025 |
| InitialECB | Not Finished | — | Aug 8, 2016 |
Nearby recent activity
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.