Baltimore City · 21215
3630 MANCHESTER AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $144,667
- Land use
- Residential (R)
- Year built
- —
- Last sale
- Jan 12, 2024
Assessment
| Owner | BROWN, SHENIQUE |
|---|---|
| Land use | Residential (R) |
| Total assessment | $144,667 (cycle 2026) |
| Last sale | Jan 12, 2024 — $180,000 |
| Year built | — |
| Zoning | R-6 |
| Vacant | — |
Permits
7| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2023 | USE AS A SINGLE-FAMILY DWELLING. | — | Aug 14, 2023 |
| COM2023 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-83377:SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): DEMO STUD WALL, DRYWALL, TRIMS, INSULATION AND FLOORING. INSTALL NEW FRAMING, DRYWALL, TRIMS, WALL INSULATION R-2, FLOORING. REPLACE WINDOWS & EXTERIOR DOORS SAME SIZE AND LOCATION. BUILD A 1ST FLOOR REAR DECK 10’X12’. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED DRAWINGS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. DECK AND FOOTER WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS)) Original Permit Description:(COM2021-83377) SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): DEMO STUD WALL, DRYWALL, TRIMS, INSULATION AND FLOORING. INSTALL NEW FRAMING, DRYWALL, TRIMS, WALL INSULATION R-2, FLOORING. REPLACE WINDOWS & EXTERIOR DOORS SAME SIZE AND LOCATION. BUILD A 1ST FLOOR REAR DECK 10’X12’. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED DRAWINGS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. DECK AND FOOTER WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS) | — | Jul 27, 2023 |
| COM2022 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-83377:SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): DEMO STUD WALL, DRYWALL, TRIMS, INSULATION AND FLOORING. INSTALL NEW FRAMING, DRYWALL, TRIMS, WALL INSULATION R-2, FLOORING. REPLACE WINDOWS & EXTERIOR DOORS SAME SIZE AND LOCATION. BUILD A 1ST FLOOR REAR DECK 10’X12’. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED DRAWINGS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. DECK AND FOOTER WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS)) Original Permit Description:(COM2021-83377) SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): DEMO STUD WALL, DRYWALL, TRIMS, INSULATION AND FLOORING. INSTALL NEW FRAMING, DRYWALL, TRIMS, WALL INSULATION R-2, FLOORING. REPLACE WINDOWS & EXTERIOR DOORS SAME SIZE AND LOCATION. BUILD A 1ST FLOOR REAR DECK 10’X12’. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED DRAWINGS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. DECK AND FOOTER WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS) | — | Sep 15, 2022 |
| COM2021 | INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $5,000 | Nov 18, 2021 |
| COM2021 | INSTALL (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (25) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $5,500 | Nov 18, 2021 |
| COM2021 | INSTALL (1) # ELECTRIC WATER HEATER, (1) 90000 BTU FUEL-BURNING EQUIP, (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 45000 BTU FUEL-BURNING EQUIP AS PER CODE. | $5,000 | Nov 17, 2021 |
| COM2021 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): DEMO STUD WALL, DRYWALL, TRIMS, INSULATION AND FLOORING. INSTALL NEW FRAMING, DRYWALL, TRIMS, WALL INSULATION R-2, FLOORING. REPLACE WINDOWS & EXTERIOR DOORS SAME SIZE AND LOCATION. BUILD A 1ST FLOOR REAR DECK 10’X12’. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED DRAWINGS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. DECK AND FOOTER WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS) | $15,000 | Nov 16, 2021 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-HGWJul 9, 2026 · 54 m · 3608 MANCHESTER AVE
- violation: HCD-Sanitation PropertyJul 9, 2026 · 149 m · 3718 OAKMONT AVE
- violation: PM 305.2.2Jul 7, 2026 · 148 m · 3623 BEEHLER AVE
- violation: PM 306.6Jul 7, 2026 · 148 m · 3623 BEEHLER AVE
- violation: HCD-Sanitation PropertyJul 6, 2026 · 57 m · 3710 MANCHESTER AVE
- violation: HCD-Vacant BuildingJul 6, 2026 · 109 m · 3730 MANCHESTER AVE
- violation: HCD-Sanitation PropertyJul 6, 2026 · 112 m · 3628 BEEHLER AVE
- violation: HCD-Vacant BuildingJul 2, 2026 · 113 m · 4901 LITCHFIELD AVE
- violation: HCD-Vacant BuildingJul 2, 2026 · 120 m · 4903 LITCHFIELD AVE
- permit: BUSEJul 2, 2026 · 149 m · 3722 BEEHLER AVE
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.