Baltimore City · 21215

3512 MANCHESTER AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$155,033
Land use
Residential (R)
Year built
Last sale
Jul 26, 2022

Assessment

OwnerGORHAM, TONIA
Land useResidential (R)
Total assessment$155,033 (cycle 2026)
Last saleJul 26, 2022 — $184,925
Year built
ZoningR-6
Vacant

Permits

1
TypeDescriptionCostIssued
BRCMRoof SCOPE OF WORK TO BE PERFORMED: Install TPO cool roofing system with 10 year warranty -Remove any debris from the roof -Remove existing roofing system down to the original decking -Install new 1/2 plywood over the entire roof for a new solid decking -Install 1/2 high density ISO board over the new decking which adds a R rating of 2.5 to your roof system -Install base sheet -Install new steel gravel stop along the front edge -Install new steel drip along the rear of the roof -Install new TPO roof cap sheet -Flash in chimneys if any and install term bar. If no chimney is on the roof this does not apply to your job. -Flash in all pipes and penetrations with rubber and not cement -Flash in parapet walls -Remove all trash and debris from job site MATERIALS TO BE INSTALLED: Tpo 60 mil Roof Install Tpo 60 mil Roof Install 1/2 High Density Insulation Board R-value 2.5 Wood Replacement 3 1/2 cdx board TPO Chimney Fashing -Install new TPO around chimney. Install termination bar around the chimney to prevent material from peeling away from brick Flat Roof Extra Layers Removal Flat Roof Extra Layers Removal Trash and Dumpsters Removal of trash from job site Exterior Siding Top Level SCOPE OF WORK TO BE PERFORMED: -Remove existing siding or exterior product currently on the structure having work performed -Install woven house wrap -Install new furring as needed -Install starter strips -Install new siding picked by customer -Install all accessories picked per scope of work -Remove all trash and debris from job site MATERIALS TO BE USED MainStreet siding TRI-BUILT Woven House Wrap Metal Window Trim Out Both windows on the second story of the back of the home 5K Gutters/Downspouts with New Siding Removal of old gutters. Install new seamless 5K gutters with 2x3 downspouts on the second story back of the house. Den SCOPE OF WORK TO BE PERFORMED: -Remove existing drywall from den -Remove existing baseboards -Install R-19 Insulation in walls -Install new ½ inch drywall -finish new drywall -Prime & paint new drywall -install new primed baseboards -paint baseboards -Remove all trash and debris from job site MATERIALS TO BE INSTALLED R-19 valued insulation ½ “gypsum board Joint compound Paint Baseboard Bathroom -Remove existing ceramic tile -Remove faulty bathtub -Install new Acrylic bathtub -Install new 3’x5’x1/2” backer board -Install new 12”x 24” ceramic tile -Remove all trash and debris from job site MATERIALS TO BE USED Ceramic adhesive 12”x24”ceramic tiles 3’x5’x1/2” Backer board 60” RH acrylic bathtub$25,000Jun 18, 2026

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.