Baltimore City · 21215

6700 CROSS COUNTRY BLVD

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$331,667
Land use
Residential (R)
Year built
1940
Last sale
Jan 10, 2025

Assessment

OwnerCROSS COUNTRY HOLDINGS, LLC
Land useResidential (R)
Total assessment$331,667 (cycle 2026)
Last saleJan 10, 2025
Year built1940
ZoningR-1-D
Vacant

Permits

10
TypeDescriptionCostIssued
COM2024REISSUANCE OF PERMIT: SCOPE OF WORK: INTERIOR ALTERATIONS - INTERIOR RENOVATIONS AND CONSTRUCT AN ADDITION TO EXISTING SFD INCLUDING ALL RELATED ON SITE WORK AS PER CODE AS PER PLANS, *PLANS PREVIOUSLY APPROVED ON PERMIT COM2022-00117 PLANS 2022-100 ISSUED ON 3/29/2022$180,000Oct 20, 2024
COM2024INSTALL (1) 48000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (2) 120000 BTU AIR-CON SYSTEM, HEAT PUMP, (2) 200000 BTU FUEL-BURNING EQUIP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (4) 70 CFM EXHAUST SYSTEMS AS PER CODE.$59,000Jun 7, 2024
COM2024INSTALL (20) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (2) 240000 BTU FUEL-BURNING EQUIP AS PER CODE. ***PER PLANNING:HE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 412 FT NAVD88 AND THE FLOOD PROTECTION ELEVATION IS 412.6 FT NAVD88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (.6 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED TO AVOID DAMAGE BY FLOOD WATERS.$20,000Apr 10, 2024
COM2024 Extend Original Permit.(original permit:COM2023-88514:REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-00117:SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR RENOVATIONS, AND CONSTRUCT AN---- ADDITION ----- TO EXISTING SFD, INCLUDING ALL RELATED ON-SITE WORK AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-00117) SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR RENOVATIONS, AND CONSTRUCT AN---- ADDITION ----- TO EXISTING SFD, INCLUDING ALL RELATED ON-SITE WORK AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-88514) REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-00117:SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR RENOVATIONS, AND CONSTRUCT AN---- ADDITION ----- TO EXISTING SFD, INCLUDING ALL RELATED ON-SITE WORK AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-00117) SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR RENOVATIONS, AND CONSTRUCT AN---- ADDITION ----- TO EXISTING SFD, INCLUDING ALL RELATED ON-SITE WORK AS PER PLANS AS PER CODE.Feb 8, 2024
COM2023COMPLETE REWIRE OF PREMISE. 400 AMP SERVICE**************** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 412 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 412.6 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (0.6 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.$15,000Jan 2, 2024
COM2023REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-00117:SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR RENOVATIONS, AND CONSTRUCT AN---- ADDITION ----- TO EXISTING SFD, INCLUDING ALL RELATED ON-SITE WORK AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-00117) SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR RENOVATIONS, AND CONSTRUCT AN---- ADDITION ----- TO EXISTING SFD, INCLUDING ALL RELATED ON-SITE WORK AS PER PLANS AS PER CODE.Dec 28, 2023
COM2023 Extend Original Permit.(original permit:COM2022-00117:SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR RENOVATIONS, AND CONSTRUCT AN---- ADDITION ----- TO EXISTING SFD, INCLUDING ALL RELATED ON-SITE WORK AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-00117) SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR RENOVATIONS, AND CONSTRUCT AN---- ADDITION ----- TO EXISTING SFD, INCLUDING ALL RELATED ON-SITE WORK AS PER PLANS AS PER CODE.May 30, 2023
COM2023INSTALL (22) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 50000 BTU FUEL-BURNING EQUIP, (1) 100000 BTU FUEL-BURNING EQUIP AS PER CODE.******** AS PER THE DEPARTMENT: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) OF 411.2 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 412.6 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (1.4 FT ABOVE THE FFE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.$1,100Feb 15, 2023
COM2022SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR RENOVATIONS, AND CONSTRUCT AN---- ADDITION ----- TO EXISTING SFD, INCLUDING ALL RELATED ON-SITE WORK AS PER PLANS AS PER CODE.$180,000Mar 29, 2022
COM2019install (1) # gas test as per code.$800Apr 4, 2019

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.