Total assessment
$855,600
Land use
Apartments (M)
Year built
Last sale
Apr 3, 2023

Assessment

OwnerALAMEDA 5017, LLC
Land useApartments (M)
Total assessment$855,600 (cycle 2026)
Last saleApr 3, 2023
Year built
ZoningR-6
Vacant

Permits

12
TypeDescriptionCostIssued
USE2023(USE)CONTINUE TO USE PREMISES FOR TWELVE RESIDENTIAL DWELLING UNIT OF GARDEN STYLE ATTACHED TOWNHOMES. THIS PERMIT IS FOR THE FOLLOWING UNIT NUMBERS: 5017#A, 5017#B, 5019#A, 5019#B, 5021#A, 5021#B, 5023#A, 5023#B, 5025#A, 5025#B, 5027#A, 5027#B. Nov 30, 2023
COM2023 Extend Original Permit.(original permit:COM2023-59506:(5017 THE ALAMEDA UNITS ''A'' AND ''B'') INSTALL (30) # BRANCH CIRCUITS/FEEDERS AS PER CODE.) Original Permit Description:(COM2023-59506) (5017 THE ALAMEDA UNITS ''A'' AND ''B'') INSTALL (30) # BRANCH CIRCUITS/FEEDERS AS PER CODE.Sep 29, 2023
COM2023INSTALL (1) 400 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (3) 100 AMPS NEW ELECTRICAL METERS AS PER CODE.$2,000Sep 5, 2023
COM2023(5019 THE ALAMEDA UNITS ''A'' AND ''B'') SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INSTALLATION OF NEW DOORS (DOORS WILL BE INSTALLED WITHIN EXISTING OPENINGS), CABINETS FLOORING AND PAINT, REWIRE UNIT AND PANEL, UPDATE DRAIN AND WATER LINES AND ADD FIXTURE FOR WASHER, ADD GAS FIXTURE FOR DRYER, REPLACE FURNACE WITH AND AC, ADD A RETURN DUCT TO UPSTAIRS BEDROOMS, REPLACE SUPPLY LINES GOING TO BEDROOMSM ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE$10,000Jun 7, 2023
COM2023(5021 THE ALAMEDA UNITS ''A'' AND ''B'') SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INSTALLATION OF NEW DOORS (DOORS WILL BE INSTALLED WITHIN EXISTING OPENINGS), CABINETS FLOORING AND PAINT, REWIRE UNIT AND PANEL, UPDATE DRAIN AND WATER LINES AND ADD FIXTURE FOR WASHER, ADD GAS FIXTURE FOR DRYER, REPLACE FURNACE WITH AND AC, ADD A RETURN DUCT TO UPSTAIRS BEDROOMS, REPLACE SUPPLY LINES GOING TO BEDROOMSM ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE$10,000May 18, 2023
COM2023(5025 THE ALAMEDA UNITS ''A'' AND ''B'')SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INSTALLATION OF NEW DOORS (DOORS WILL BE INSTALLED WITHIN EXISTING OPENINGS), CABINETS FLOORING AND PAINT, REWIRE UNIT AND PANEL, UPDATE DRAIN AND WATER LINES AND ADD FIXTURE FOR WASHER, ADD GAS FIXTURE FOR DRYER, REPLACE FURNACE WITH AND AC, ADD A RETURN DUCT TO UPSTAIRS BEDROOMS, REPLACE SUPPLY LINES GOING TO BEDROOMSM ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE$10,000May 8, 2023
COM2023(5023 THE ALAMEDA UNITS ''A'' AND ''B'')SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INSTALLATION OF NEW DOORS (DOORS WILL BE INSTALLED WITHIN EXISTING OPENINGS), CABINETS FLOORING AND PAINT, REWIRE UNIT AND PANEL, UPDATE DRAIN AND WATER LINES AND ADD FIXTURE FOR WASHER, ADD GAS FIXTURE FOR DRYER, REPLACE FURNACE WITH AND AC, ADD A RETURN DUCT TO UPSTAIRS BEDROOMS, REPLACE SUPPLY LINES GOING TO BEDROOMSM ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE$10,000May 4, 2023
COM2023(5027 THE ALAMEDA UNITS ''A'' AND ''B'')SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INSTALLATION OF NEW DOORS (DOORS WILL BE INSTALLED WITHIN EXISTING OPENINGS), CABINETS FLOORING AND PAINT, REWIRE UNIT AND PANEL, UPDATE DRAIN AND WATER LINES AND ADD FIXTURE FOR WASHER, ADD GAS FIXTURE FOR DRYER, REPLACE FURNACE WITH AND AC, ADD A RETURN DUCT TO UPSTAIRS BEDROOMS, REPLACE SUPPLY LINES GOING TO BEDROOMSM ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE$10,000May 4, 2023
COM2023(5017 THE ALAMEDA UNITS ''A'' AND ''B'') NEW DOORS, CABINETS FLOORING AND PAINT REWIRE AND PANEL DRAIN AND WATER LINES ADD WASHER ADD GAS DRYER REPLACE FURNACE WITH AND AC ADD A RETURN DUCT TO UPSTAIRS BEDROOMS REPLACE SUPPLY LINES GOING TO BEDROOMS$10,000Apr 18, 2023
COM2023(5017 THE ALAMEDA UNITS ''A'' AND ''B'') INSTALL (30) # BRANCH CIRCUITS/FEEDERS AS PER CODE.$5,000Mar 23, 2023
COM2021SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: REMOVE AND DISPOSE OF EXISTING ROOFING MATERIAL AND SHEATHING DOWN TO JOIST. SUPPLY AND INSTALL NEW 7/16 OSB ROOF DECKING ALONG WITH A INSULATION ISO BOARD TAPER SYSTEM SECURED WITH SCREWS AND PLATES. MECHANICALLY FASTEN AND HEAT WELD A 60-MIL PVC ROOF COVERING MEMBRANE TO MANUFACTURE SPECIFICATIONS. (*NO STRUCTURAL ALTERATIONS TO BE DONE TO THE ROOF), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE$45,122.4Apr 5, 2021
COM2020INSTALL (1) 52000 BTU FUEL-BURNING EQUIP AS PER CODE.$150Apr 28, 2020

Violations

7
KindCategoryStatusFineBalanceDate
citationPM 305.1P$100$0Jun 9, 2026
citationPM 306.2P$100$0May 6, 2026
citationPM 306.2P$100$0Mar 27, 2026
citationPM 306.1P$100$0Feb 24, 2026
citationZG 19-101P$500$0Sep 10, 2025
citationZG 19-101A$500$0Sep 10, 2025
citationPM 305.1P$100$0Jun 9, 2025

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.