Baltimore City · 21207
2200 KERNAN DR
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $34,255,633
- Land use
- Commercial (C)
- Year built
- 2006
- Last sale
- Jan 1, 1797
Assessment
| Owner | JAMES LAWRENCE KERNAN |
|---|---|
| Land use | Commercial (C) |
| Total assessment | $34,255,633 (cycle 2026) |
| Last sale | Jan 1, 1797 |
| Year built | 2006 |
| Zoning | H |
| Vacant | — |
Permits
25| Type | Status | Description | Cost | Issued |
|---|---|---|---|---|
| BCCM | — | Install approximately 60' of 3" domestic water pipe and one 3" RPZ backflow preventor. Install approximately 60' of 2" domestic water piping and one 2" RPZ backflow preventor. Install approximately 40' of 1-1/2" domestic water piping and one 1-1/2" RPZ backflow preventer. | $10,000 | Feb 13, 2026 |
| COM2024 | — | REPLACE EXISTING FIRE ALARM SYSTEM WITH A NEW SYSTEM AS PER CODE. | — | Nov 17, 2025 |
| COM2024 | — | TO REMOVE ONE 8,000-GALLON DIESEL ABOVEGROUND STORAGE TANK (AST) AND INSTALL ONE 8,000-GALLON DIESEL AST TO SERVE THE EXISTING EMERGENCY GENERATOR AND BOILER SYSTEMS IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS. EXITING ABOVE GRADE SUPPLY AND RETURN PIPING TO THE EMERGENCY GENERATORS AND EXISTING ABOVE AND BELOW GRADE BELOW GRADE DIESEL SUPPLY AND RETURN PIPING TO THE BOILER LOOP WILL REMAIN AS PER PLANS AS PER CODE. | $177,370 | Aug 20, 2024 |
| COM2024 | — | INSTALL (8) # LOW VOLTAGE AS PER CODE. | $1,958.5 | Jul 31, 2024 |
| COM2023 | — | [5214 WINDSOR MILL ROAD] THE RENOVATION OF A SMALL 2-STORIED BUILDING THAT INCLUDES LIMITED DEMOLITION, NEW WINDOWS AND EXTERIOR DOORS, NEW INTERIOR WALLS AND DOORS, NEW FINISHES, AND ASSOCIATED MECHANICAL AND ELECTRICAL WORK AS PER PLANS AS PER CODE. | $90,000 | Oct 24, 2023 |
| COM2023 | — | ADD AND RELOCATE QUICK RESPONSE CONCEALED SPRINKLERS (33 HEADS) TO PROVIDE THE PROPER COVERAGE IN THE NEWLY RENOVATED GYM AS PER PLANS AS PER CODE. | $18,380 | Jun 16, 2023 |
| COM2023 | — | INSTALL (1) 1500000 BTU FUEL-BURNING EQUIP, (1) 1500000 BTU FUEL-BURNING EQUIP, (100) BTU GAS PIPING AS PER CODE. (*DIRECT REPLACEMENT IN THE SAME SIZE AND LOCATION) | $200,000 | May 22, 2023 |
| COM2023 | — | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2022-00141:SCOPE OF WORK:----INTERIOR ALTERATIONS----RENOVATION TO CREATE NEW OUTPATIENT THERAPY GYM, REMOVAL OF FINISHES, WALLS, EXISTING RESTROOMS WITH SHOWERS, NEW ELECTRICAL OUTLETS, NEW AIR HANDLING UNIT, NEW PRIVATE RESTROOM, HAND WASHING SINK, WATER FOUNTAIN, FLOORING, ACOUSTICAL SUSPENDED CEILING AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-00141) SCOPE OF WORK:----INTERIOR ALTERATIONS----RENOVATION TO CREATE NEW OUTPATIENT THERAPY GYM, REMOVAL OF FINISHES, WALLS, EXISTING RESTROOMS WITH SHOWERS, NEW ELECTRICAL OUTLETS, NEW AIR HANDLING UNIT, NEW PRIVATE RESTROOM, HAND WASHING SINK, WATER FOUNTAIN, FLOORING, ACOUSTICAL SUSPENDED CEILING AS PER PLANS AS PER CODE. | — | Feb 6, 2023 |
| COM2022 | — | SCOPE OF WORK:----INTERIOR ALTERATIONS----RENOVATION TO CREATE NEW OUTPATIENT THERAPY GYM, REMOVAL OF FINISHES, WALLS, EXISTING RESTROOMS WITH SHOWERS, NEW ELECTRICAL OUTLETS, NEW AIR HANDLING UNIT, NEW PRIVATE RESTROOM, HAND WASHING SINK, WATER FOUNTAIN, FLOORING, ACOUSTICAL SUSPENDED CEILING AS PER PLANS AS PER CODE. | $350,000 | Dec 14, 2022 |
| COM2021 | — | WORK FOR PHASE 3 INCLUDES BFPE RELOCATING THREE (3) AND ADDING TWO (2) CONCEALED SPRINKLERS TO PROVIDE THE PROPER COVERAGE IN THE NEWLY RENOVATED STORAGE ROOM AS PER PLANS AS PER CODE. | $3,000 | Jul 27, 2022 |
| COM2021 | — | BFPE RELOCATING FIVE (5), ADDING TWO (2) CONCEALED SPRINKLERS AND PLUGGING ONE EXISTING OUTLET TO PROVIDE THE PROPER COVERAGE IN THE NEWLY RENOVATED PHARMACY AS PER PLANS AS PER CODE. | $11,300 | Dec 7, 2021 |
| COM2021 | — | THE SCOPE OF WORK FOR PHASE 1 INCLUDES BFPE RELOCATING NINE (9), ADDING THREE (3) PENDENTS, AND PLUGGING ONE EXISTING OUTLET TO PROVIDE THE PROPER COVERAGE IN THE NEWLY RENOVATED PHARMACY. | $11,300 | Jul 21, 2021 |
| COM2020 | — | REPLACEMENT OF EXISTING STEAM BOILERS WITH NEW HEATING HOT WATER BOILERS AND ASSOCIATED PIPING AND ELECTRICAL MODIFICATIONS TO INCLUDE I NEW PANEL AND 20 BRANCH CIRCUITS, TO CONVERT THE FACILITY TO USING HOT WATER INSTEAD OF STEAM AS PER PLANS AS PER CODE. | $1,600,000 | Mar 11, 2021 |
| COM2020 | — | SCOPE OF WORK:--INTERIOR ALTERATIONS--RENOVATION AND EXPANSION OF EXISTING INPATIENT PHARMACY TO CREATE UPS 797 AND USP 800 COMPLIANT STERILE COMPOUNDING ROOMS AND ASSOCIATED MECHANICAL, ELECTRICAL AND PLUMBING MODIFICATIONS -- AS PER PLANS -- AS PER CODE. | $1,050,000 | Jan 6, 2021 |
| COM2020 | — | INSTALLATION OF A NEW CUSTOM AIR HANDLING UNIT ON AN EXTERIOR STEEL FRAME WORK, INSTALLATION OF NEW ROOFTOP FANS, INSTALLATION OF NEW EXTERIOR DUCTWORK, REPLACEMENT OF INTERIOR DUCTWORK AND CONTROLS AND SUPPORTING ELECTRICAL WORK AS PER PLANS AS PER CODE. | $800,000 | Aug 28, 2020 |
| COM2019 | — | reinstate original permit.(original permit:com2019-61011:install (1) # sanitary connection (other than 1-2 fam. res.) as per code.) original permit description:(com2019-61011) install (1) # sanitary connection (other than 1-2 fam. res.) as per code. | — | Dec 11, 2019 |
| COM2019 | — | amend permit: add hvac and plumber contractor . (original permit:com2019-01224:replace three cooling towers with power, lighting and heat trace cabling, adding five exit lights, replace one existing chiller with a new one and reconnect to existing power feed, adding four new ats switches for emergency power to three chillers, adding one section of switchgear to emergency switchboard for power to cooling equipment, adding four new panels and two transformers to power existing cooling equipment as per plans as per code.) original permit description:(com2019-01224) replace three cooling towers with power, lighting and heat trace cabling, adding five exit lights, replace one existing chiller with a new one and reconnect to existing power feed, adding four new ats switches for emergency power to three chillers, adding one section of switchgear to emergency switchboard for power to cooling equipment, adding four new panels and two transformers to power existing cooling equipment as per plans as per code. | — | Dec 11, 2019 |
| COM2019 | — | addition of a second water connection into the hospital and replacement of old galvanized piping within the facility with new piping as per plans/ as per code. on-site utility contractor peter ligon #os00013 | $500,000 | Oct 22, 2019 |
| COM2019 | — | replace three cooling towers with power, lighting and heat trace cabling, adding five exit lights, replace one existing chiller with a new one and reconnect to existing power feed, adding four new ats switches for emergency power to three chillers, adding one section of switchgear to emergency switchboard for power to cooling equipment, adding four new panels and two transformers to power existing cooling equipment as per plans as per code. | $1,450,000 | Sep 9, 2019 |
| COM2019 | — | install (1) # sanitary connection (other than 1-2 fam. res.) as per code. | $5,460 | Apr 15, 2019 |
| Comm. Permit - Temporary Tent * | ISSUE | ERECT TWO TENTS: 30X50=1500SF & 20X20=400SF | CONNECTED WITH CANOPY 9X5=45SF FOR FOOD & STAGE | FOR FACILITY SHOWCASE NOV. 5, 2015 ON PROPERTY | 12:00PM UNTIL 9PM. CERTIFICATE OF FLAME RETARD- | ATION IS ATTACHED. TOILET FACILITIES IN FAMILY | LODGING FACILITY CONSTRUCTED UNDER B823522. | — | Sep 30, 2015 |
| Comm. Permit - Sprinkler * | ISSUE | PREVENTER LEFT BY OTHERS, DESIGN & INSTALL WET | TYPE AUTOMATIC SPRINKLER TO PROVIDE COMPLETE | PROTECTION ON 1ST & 2ND FL,DESIGN & INSTALL DRY | SYSTEM IN ATTIC SPACE, LARGEST PIPE SIZE 4", | 220 TOTAL HEADS. SEE B823522 FOR NEW FACILTY. | THIS PERMIT CANCLES/REPLACES B865218 | — | Mar 10, 2015 |
| Comm. Permit - Sprinkler * | ISSUE | STAT INSIDE BLDG AT FLANGED OUTLET OF BACKFLOW | PREVENTER LEFT BY OTHERS, DESIGN & INSTALL WET | TYPE AUTOMATIC SPRINKLER TO PROVIDE COMPLETE | PROTECTION ON 1ST & 2ND FL,DESIGN & INSTALL DRY | SYSTEM IN ATTIC SPACE, LARGEST PIPE SIZE 4", | 250 TOTAL HEADS. SEE B823522 FOR NEW FACILTY. | — | Jan 22, 2015 |
| Comm. Permit - New Structure/Shell * | CLOSED | CONSTRUCT TWO STORY FAMILY LODGING FACILITY | W/20 ONE BEDROOM, ONE BATHROOM ROOMS AS PER | PLANS. 1ST FLR T/B COMPLETED, 2ND FLR T/B | COMPLETED IN FUTURE. SEPARATE PERMIT REQ'D FOR | ANY ADD'L WORK. 135'4"X57'X31'8"=13,622SF | — | Sep 30, 2014 |
| Res. Permit - Razing * | ISSUE | RAZE SFD 1250SF T/B TORN DOWN. DEBRIS T/B | HAULED TO AN APPROVED SANITARY LANDFILL IN | ACCORDANCE WITH APPLICABLE COUNTY SITE REGS. | SEWER TO BE CAPPED. THIS PERMIT EXPIRES 90 DAYS | FROM ISSUE DATE. P853231 FINALED 9/10/14. | — | Sep 12, 2014 |
Violations
1| Kind | Category | Status | Date |
|---|---|---|---|
| service_request * | HCD-Maintenance Structure | Closed | Jun 5, 2026 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Maintenance StructureJun 5, 2026 · 129 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.